Login:

Quadra-Fire TOPAZ 844-4120

heruntergeladen wurde: 0Dateigröße: 3 mb    Hersteller: Quadra-Fire  
Kategorie: elektrische Heizungen

Start the pilot and hold the valve knob in. If the millivolt reading is less than 15mV, replace the thermocouple. b. Defective valve. If the thermocouple is producing more than 15 millivolts, replace faulty valve. 3. The pilot is burning, there is no gas to the burner, the valve knob is in the ON position, and the ON/OFF switch is in the ON position. a. ON/OFF switch or wires defective. Check the ON/OFF switch and wires for proper connections. Place the jumper wires across the terminals at the s

Quadra-Fire TOPAZ 839-1340

heruntergeladen wurde: 7Dateigröße: 3 mb    Hersteller: Quadra-Fire  
Kategorie: elektrische Heizungen

September 1, 2008 Quadra-Fire · Topaz · 7009-113G Page 23 2. Valve Regulator Replacement WARNING Fire Risk. Explosion Risk. • Disconnect any electrical cords and turn off gas supply to unit before proceeding if converting fuel on an appliance already fully installed. Remove upper and lower back shield. Loosen the set col- Figure 6.6 Pull off pilot hood and set it aside. lars on the extension rods with the 3/32 in. Allen wrench. NOTE: Do not remove the retaining clip from the hood. Remove the rod

Quadra-Fire TOPAZ 839-1320

heruntergeladen wurde: 1Dateigröße: 3 mb    Hersteller: Quadra-Fire  
Kategorie: elektrische Heizungen

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED. September 1, 2008 Quadra-Fire · Topaz · 7009-113G Page 9 5 Vent Information A. Venting Components In order to comply with applicable codes and product warranties, use only following venting components: • Hearth & Home Technologies (HHT) • Simpson Dura-Vent • Selkirk Direct-Temp • Amerivent Direct • Security Secure Vent DO NOT USE FIELD-FABRICATED VENTING COMPONENTS. Refer to the ve

Quadra-Fire TOPAZ 839-1290

heruntergeladen wurde: 7Dateigröße: 3 mb    Hersteller: Quadra-Fire  
Kategorie: elektrische Heizungen

NOTES: 1Before cutting any holes check pipe manufacturers current instructions. 2Each pipe manufacturer has their own list of parts for kits. 3SL is not interchangeable with SLP. September 1, 2008 Quadra-Fire · Topaz · 7009-113G Page 47 Page 48 Quadra-Fire · Topaz · 7009-113G September 1, 2008 D. Service Parts List R TOPAZ (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 12-8-03 Ending Manufacturing Date: Item # Description Item # Description Item # Description 1 Face Assembly, Quar

Quadra-Fire QVI35S

heruntergeladen wurde: 3Dateigröße: 4 mb    Hersteller: Quadra-Fire  
Kategorie: elektrische Heizungen

i • 6/09 B. Junction Box Installation Figure 9.2 Junction box installation JUNCTION BOX SIDEWALL JUNCTION BOX ACCESS SCREW PROVIDED Optional Accessories Connecting the electrical junction box is required if using a blower or remote. • Plug the cord into a convenient outlet. • An electrician may install an outlet box inside the fireplace. Place the outlet in the lower, back corner of the fireplace. • Must use cord supplied. CAUTION Label all wires prior to disconnection when servicing controls. W

Quadra-Fire QVI30S

heruntergeladen wurde: 7Dateigröße: 4 mb    Hersteller: Quadra-Fire  
Kategorie: elektrische Heizungen

i • 6/09 1 Model(s): QVI30S QVI35S • Do not store or use gasoline or other fl ammable vapors and liquids in the vicinity of this or any other appliance. • What to do if you smell gas - Do not try to light any appliance - Do not touch any electrical switch. Do not use any phone in your building. - Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions. - If you cannot reach your gas supplier, call the fi re department. • Installation and service must be

Quadra-Fire QVI-35FB-S

heruntergeladen wurde: 4Dateigröße: 2 mb    Hersteller: Quadra-Fire  
Kategorie: Kamine

B • 12/08 7 77 Installation Preparation Prepare the existing solid fuel masonry or factory built non-combustible firebox for installation. A. Inspection and Cleaning Prior to installing the gas insert: • Have the chimney and adjacent structure inspected and cleaned by qualified professionals. Hearth & Home Technologies recommends that NFI or CSIA certified professionals, or technicians under the direction of certified professionals, conduct a minimum of a NFPA 211 Level 2 inspection of the chimn

Quadra-Fire QVI-30FB-S

heruntergeladen wurde: 0Dateigröße: 4 mb    Hersteller: Quadra-Fire  
Kategorie: Kamine

the jumper wires across the terminals at the switch. If the burner the valve knob is in the ON comes on, replace the defective switch. If the switch is OK, place the position, and the ON/OFF jumper wires across the switch wires at the gas valve. If the burner switch is in the ON position. comes on, the wires are faulty or connections are bad. b. Thermopile may not be gener- If the pilot flame is not close enough physically to the thermopile, ating suffi cient millivoltage. adjust the pilot flame

Quadra-Fire QVI-25FB-S

heruntergeladen wurde: 0Dateigröße: 2 mb    Hersteller: Quadra-Fire  
Kategorie: Kamine

• Install gas line into hole provided on insert side. • If applicable install remote control wires into insert side (see Section 6, F.). • Secure collar slide plate to appliance by placing locking handle into position with locking tabs (see Figure 7.1) and secure with #8 screw. • Level the appliance from side to side and front to back. If necessary, use the leveling legs included with the manual bag to set each corner of the base. • Position any excess flexible vent pipe back up into chimney wit

Quadra-Fire QFP38-NG

heruntergeladen wurde: 6Dateigröße: 5 mb    Hersteller: Quadra-Fire  
Kategorie: Kamine

Figure 6.3 Minimum Clearances for Termination CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED. WARNING! In the U.S.: Vent system termination is NOT permitted in screened porches. You must follow side wall, overhang and ground clearances as stated in the instructions. In Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must fo





Kategorien