Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications For Installation into a commercial, multi-family (multi-level exceeding two stories) or high-rise applications: All outer pipe joints must be sealed with high temperature silicone, including the slip section that connects directly to the horizontal termination cap. • Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 8.1. • Only outer pipes need to be sea
CAUTION Battery polarity must be correct or module damage will occur. • A 110-120 VAC circuit for this product must be protected with ground-fault circuit-interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks. Heat & Glo • 6000G, 6000G-IPI • 2103-900 Rev. M • 9/08 39 RED THERMOSTAT W IRE ASSEMBLY BRN RED STANDING P ILOT VALV E WHT ON /OFF PIGGYBACK W IRE Figure 10.3 Standing Pilot Ignition Wiring Diagram F
See your dealer. Noise is caused by metal expanding and contracting as it heats up and cools down, similar to the sound produced by a furnace or heating duct. This noise does not affect the operation or longevity of the appliance. In an Intellifire ignition system it is normal to see the pilot flame, but it should turn off when ON/OFF is turned off. In a standing pilot system the pilot will always stay on. Heat & Glo • 6000G, 6000G-IPI • 2103-900 Rev. M • 9/08 14 Troubleshooting 14 With proper i
• Lubricate pipe or flue with water and slide the flashing down. It may be necessary to trim the top shingles around the base of the rubber boot to ensure a good fit. • Draw around fl ashing, remove. • Apply silicone sealant to roof inside the lines (Figure 8.20). • Lubricate pipe or flue with water and slide fl ashing down. Seat firmly in sealant. Nail roof flashing to the roof. • Apply silicone sealant on the top outside of the base plate Figure 8.20 Apply Sealant APPLY SEALANT TOP & PARTIAL S