Login:
Stimmen - 4, Durchschnittliche Bewertung: 4.3 ( )

Anleitung American Standard, modell SELECTRONIC 6065.26X

Hersteller: American Standard
Dateigröße: 869.21 kb
Dateiname: Install_2807.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Install WALL ESCUTCHEON (16) onto HORIZONTAL TUBE (11). Assemble the COUPLING NUT (6a) and TAPERED RUBBER WASHER (7) in the CHROME ELBOW (5) onto the HORIZONTAL TUBE (11). Push the HORIZONTAL TUBE (11) into the CHROME ELBOW (5). Tighten COUPLING NUT (6a) but not fully. Fig. 6b. 8. For back spud installations: Follow steps #1 and #2 to install the spud coupling kit. Push the HORIZONTAL TUBE (11) into the spud connection on the back of the fixture. Do not tighten fully. If spud coupling kit is not required install HORIZONTAL TUBE (11) into back spud on fixture and hand tighten. Fig. 6b. 9. All installations: If required cut scored VACUUM BREAKER PIPE (17) to fit, leave a minimum of 1-1/4" (32mm) of pipe to ensure engagement with compression coupling. Assemble the COUPLING NUT (18) and TAPERED RUBBER WASHER (19) in the BRASS ELBOW (12) onto the VACUUM BREAKER PIPE (17). Install VACUUM BREAKER PIPE (17) into BRASS ELBOW (12) and hand tighten COUPLING NUT (18). Fig. 6c. Note: If cutting VACUUM BREAKER PIPE (16) to size, note that Critical Line (C/L) on Vacuum Breaker must typically be 6" (152mm) above fixture. Consult Code for details. Fig. 6 Fig. 6a Fig. 6b Fig. 6c 1 2 3 4 1-1/2" TOP SPUD 9 14 1612 11 15 5 7 6a 13 6a 8 7 5 610 FLANGE END UP FLANGE END 11 18 19 19 17 TOP SPUD INSTALLATION BACK SPUD INSTALLATION BACK SPUD INSTALLATION TOP SPUD INSTALLATION 2 M968550 REV. 1.6 TAPERED SIDE TAPERED SIDE 12 TAPERED SIDE UP TAPERED SIDE UP 4 5 INSTALL FLUSH VALVE; Fig. 8 1. Insert the side ADJUSTABLE TAILPIECE (1) on the FLUSH VALVE (2) into the SUPPLY STOP (3). Lubricate the TAILPIECE O-RING (4) with water if necessary. Lightly tighten COUPLING NUT (5). Fig. 8. Important: Do not use lubricants (other than water) or any type of thread sealing paste or tape. 6 CONNECT FLUSH VALVE TO PIPING; Fig. 9 1. Align the FLUSH VALVE (2) (Fig. 9) directly above the VACUUM BREAKER TUBE (7) and VACUUM COUPLING NUT (6). Make sure that GASKET (10) is installed. Note: There is a +13mm, -6mm (+1/2, -1/4) tolerance for the 121mm (4-3/4) dimension. Fig. 9. 2. Pull the VACUUM BREAKER TUBE (7) up to meet the threaded FLUSH VALVE CONNECTION (8) and hand tighten the COUPLING NUT (6). Align all components of the flush valve assembly. Fig. 9. 3. Lightly tighten the TAILPIECE COUPLING NUT (5) connection first, then the VACUUM BREAKER COUPLING NUT (6) and finally the SPUD COUPLING NUT (9). Once alligned correctly, use a wrench to tighten all couplings to make water tight connections. Fig. 9. 4. Secure piping behind wall as required. 5 7 9 6 2 5 8 10 Fig. 9 Fig. 8 3 2 5 1 4 121mm,+13mm, -6mm (4-3/4)(+1/2, -1/4) M968550 REV. 1.6 CONNECT FRONT PANEL TO ELECTRICAL BOX (AC POWER); Fig. 10 1. Remove the four COVER SCREWS (1) and COVER from (2) ELECTRICAL BOX (4). Fig. 10. 2. Pull the CIRCUIT BOARD (3) out from ELECTRICAL BOX (4). Fig. 10. 3. Knock out lower blank in ELECTRICAL BOX (4) with flat blade screwdriver. Install from the back of ELECTRICAL BOX (4) the POWER SUPPLY GROMMET (8). Fig. ...

Dieses Handbuch ist für folgende Modelle:
Plumbing - SELECTRONIC 6065.22X (869.21 kb)
Plumbing - SELECTRONIC 6065.26X (869.21 kb)
Plumbing - SELECTRONIC 6068.22X (869.21 kb)
Plumbing - SELECTRONIC 6068.26X (869.21 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien