Login:
Stimmen - 2, Durchschnittliche Bewertung: 3 ( )

Anleitung Napoleon Fireplaces, modell SLBV-35NM

Hersteller: Napoleon Fireplaces
Dateigröße: 2.89 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Step 9. (Page 20) Install the glass enclosure panel. Step 10. (Page 20) Adjust burner air shutter to ensure proper flame appearance. Step 11. (Page 22) Perform spillage test. Step 12. (Page 23) Install hood. Step 13. (Page 23) Complete finished interior wall. Step 14. (Page 24) Attach "Safety-in- Operation" warnings. DETAILED INSTALLATION STEPS Step 1. Construct Appliance Framing Frame the appliance as illustrated in Figures 8-1 and 8-2. All framing details must allow for a minimum clearance to combustible framing members as shown in Table 6, Page 7. If the appliance is to be elevated above floor level, a solid continuous platform must be constructed below the appliance. Headers may be in direct contact with the appliance top standoff spacers when they are bent up vertically, maintaining the 3" clearance to the fireplace top, but must not be supported by them or notched to fit around them. All construction above the appliance must be self-supporting. DO NOT use the appliance for structural support. Secure the fireplace to the side framing members using the unit's nailing flanges — one top and bottom on each side of the fireplace front. See Figure 7. Use 8d nails or equivalent. WARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this appliance may result in property damage or personal injury. AVERTISSEMENT Risque de dommages ou de blessures si les pieces ne sont pas installees conformement a ces schemas et ou si des pieces autres que celles specifiquement approuvees avec cet appareil sont utilisees. Figure 7 Nailing flanges are provided at all four corners at 5/8", 1/2", and flush settings. Side Framing Fireplace Nailing Flanges ~ NOTE: The nailing flanges, combustible members, and screw heads in areas directly adjacent to the nailing flanges are EXEMPT from the 1/2” clearance to combustible requirements for the firebox outer wrapper. Combustible framing may be in direct contact with the nailing flanges and may be located closer than 1/2” from screw heads and the firebox wrapper in areas adjacent to the nailing flanges. Frame the opening to the exact dimensions specified in the framing details in this manual. Fireplace secured to framing by nailing flanges (Left side front corner of fireplace shown. Right side requirements are the same.) SUPERIOR® B-VENT GAS FIREPLACES • MODELS SLBV-35, SLBV-40 • INSTALLATION INSTRUCTIONS 8 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Control Compartment Panel Hood Glass Door Header Spacing Top Standoffs Flush Nailing Flange 1/2” Nailing Flange 5/8” Nailing Flange Glass Door Spring Latch *IMPORTANT! Bend up the Top Standoff Spacers before installation. Use outer pair for 1/2" materials and inner pair for 5/8" materials. Top Standoff Spacers* Control Compartment Panel Hood Glass Enclosure Spring Latch Panel Lower Enclosure Panel Flush Nailing Flange 1/2" Nailing Flange 5/8" Nailing Flange SUPERIOR SUPERIORB-VENT GAS FIREPLACES • MODELS ...

Dieses Handbuch ist für folgende Modelle:
Kamine - SLBV-35NE (2.89 mb)
Kamine - SLBV-35NE (2.89 mb)
Kamine - SLBV-35NE (2.89 mb)
Kamine - SLBV-35NE (2.89 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien