Login:
Stimmen - 4, Durchschnittliche Bewertung: 3.8 ( )

Anleitung Desa, modell (V)G36HR

Hersteller: Desa
Dateigröße: 1.09 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Dieses Gerät hat auch andere Anweisungen:
Kamine - (V)G36HR (1.28 mb)en

Anleitung Zusammenfassung


When the double wall pipe passes through a framed opening into an attic space, the firestop must be placed into an attic floor as shown in Figure 11. Penetrating the roof To maintain a 1" clearance to the pipe on a roof with a pitch, a rectangular opening must be cut. 1. Determine the center point through which the pipe will penetrate the roof. 2. Determine the center point of the roof. Pitch is the distance the roof drops over a given span, usually 12". A 6/12 pitch means that the roof drops 6" for each 12" one measure horizontally down from the roof rafters. 3. Use the roof opening chart (Figure 12) to determine the correct opening length and flashing required. 4. Remove the shingles around the opening measured. Cut out this section. 5. Add the next sections of the pipe until the end penetrates the roof line. Check to see that the proper clearances are maintained. Extend chimney by adding sections of double wall pipe until pipe is minimum of 30" above the highest point of the roof cutout. Termination and chimney must extend a minimum of 36" above the highest point where it passes through the roof. 17" Min. 30" Min. 1" Min. 1" Min. 1" Min. Opening "A" Existing Ceiling Frame Firestop Spacer Pitch Slope Opening "A" Max. Used Flashing Model No. Flat 0° 17" V6F-10DM 0-6/12 26.6° 19" V6F-10DM 6/12- 12/12 45.0° 24" V12F-10DM Screws or Staples (Min. of 8) Figure 10 - Firestop Spacer with Living Space Above Ceiling Figure 12 - Roof Opening Measurements Screws or Staples (Min. of 8) Firestop Spacer Existing Ceiling Frame Figure 11 - Firestop Spacer with Attic Space Above Ceiling Flashing installation (v6f-10dm or v12f-10dm) Determine the flashing to be used with the roof opening chart. Slide flashing over pipe until base is flat against roof. Replace as many shingles as needed to cover exposed area and flashing base. Secure in position by nailing through shingles (see Figure 13). DO NOT NAIL THROUGH FLASHING CONE. Installing Flashing on a Metal Roof When installing the flashing on a metal roof, it is required that putty tape be used between the flashing and the roof. The flashing must be secured to the roof using #8 x 3/4" screws and then sealed with roof coating to prevent leakage through the screw holes. A roof coating must also be applied around the perimeter of the flashing to provide a proper seal. Storm Collar Installation (SC2-1) Place storm collar over pipe and slide down until it is snug against the open edge of the flashing (see Figure 14). Apply waterproof caulk around the perimeter of the collar to provide a proper seal. Terminations/Spark Arrestor The fireplace system must be terminated with the listed round top or chase terminations. In any case, refer to the installation instructions supplied with the termination. CAUTION: Do not seal openings on the rooftop flashing. Follow the installation instructions provided with the termination being used. Chase installations Instructions for chase installations are included with the chase style termination chosen. In a multiple chase installation, be sure to provide adequate distance between terminations to prevent smoke spillage from one termination to another. We suggest that terminations be separated at least 24" center to center and stacked at a vertical height difference of 18" (see Figure 16, page 10). Note: If a decorative shroud is to be installed, contact the manufacturer for specifications. Venting Installation Continued Storm Collar Overlap Shingles Top and Sides Only RTL-10D Stainless Inner Flue Pipe Flashing Cone Level of Flue Gas Outlet Nail Only Outer Perimeter of Flashing Secure Termination to Outer Pipe with 3 Screws Waterproof Caulking Storm Collar Flashing Underlap Shingles at Bottom Overlap Shingles (Top and Sides of Flashing Base) Figure 13 - Flashing Installation Underlap Shingles Figure 15 - Termination Chimney Pipe Waterproof Caulk Storm Collar Flashing Figure 14 - Storm Collar 10 foot rule All flue gas outlet chimney terminations must extend a minimum of 3 feet in height above the highest point where it passes through the roof and must be at least 2 feet above the highest point of the roof that is within a horizontal distance of 10 feet (see Figure 17). Venting Installation Continued 18" Min. Typ. 24" Min. 24" Min. Figure 16 - Multiple Chase Installation Level of Flue Gas Outlet 10' 10' 2' Min. 3' Min. Side Firebrick Finished Side Outside of Fireplace 2' Min. 3' Min. Gas Line Conduit Remove Knockout 1/2" Dowel Figure 17 - 10 Foot Rule Insulation finishing the fireplace Combustible materials, such as wallboard, gypsum board, sheet rock, drywall, plywood, etc. may make direct contact with sides and top around the fireplace face. It is important that combustible materials do not overlap the face itself. Brick, glass, tile or other noncombustible materials may overlap the front face provided they do not obstruct essential openings like louvered slots or any other opening. When overlapping with a noncombustible facing material, use only non...

Dieses Handbuch ist für folgende Modelle:
Kamine - (V)G36 (1.09 mb)
Kamine - (V)G36H (1.09 mb)
Kamine - (V)G36R (1.09 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien