Login:
Stimmen - 1, Durchschnittliche Bewertung: 5 ( )

Anleitung Desa, modell (V)G36R

Hersteller: Desa
Dateigröße: 1.09 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Dieses Gerät hat auch andere Anweisungen:
Kamine - (V)G36R (1.28 mb)en

Anleitung Zusammenfassung


may make direct contact with sides and top around the fireplace face. It is important that combustible materials do not overlap the face itself. Brick, glass, tile or other noncombustible materials may overlap the front face provided they do not obstruct essential openings like louvered slots or any other opening. When overlapping with a noncombustible facing material, use only noncombustible mortar or adhesive. Optional Gas Line Installation Gas line hook up should be done by your supplier or a qualified service person. Note: Before you proceed, make sure your gas supply is turned off. Use only a 1/2" black iron pipe and appropriate fittings. 1. Remove knockout indentation on refractory or firebrick wall located above the refractory hearth floor. The knockout indentation must be firmly tapped with any solid object such as a 1/2" dowel until it is released. Remove fragmented portions of refractory (see Figure 18). 2. Remove gas line cover plate located on either side of fireplace and pull out insulation from gas line conduit sleeve. Save insulation for reuse. Replace screws. 3. Run a 1/2" black iron gas line into the fireplace through the rear at gas line conduit sleeve (if using a raised platform, add height). Provide sufficient gas line into fireplace chamber for fitting connection (see Figure 19, page 11). Note: Secure incoming gas line to wood framing to provide rigidity for threaded end. 4. Repack insulation around gas line and into sleeve opening. Seal any gaps between gas line and refractory knockout hole with refractory cement or commercial furnace cement, Install the gas appliance or cap off gas line if desired. Gas Conduit Cover Refractory Knockout Plug Figure 18 - Gas Line Knockout CAUTION: All gas piping and connections must be tested for leaks after the installation is completed. After ensuring that the gas valve is on, apply soap and water solution to all connections and joints. Bubbles forming show a leak. Correct all leaks at once. DO NOT USE AN OPEN FLAME FOR LEAK TESTING AND DO NOT OPERATE ANY APPLIANCE IF A LEAK IS DETECTED. LEAK TESTING SHOULD BE DONE BY A QUALIFIED SERVICE PERSON. WARNING: Do not operate an unvented gas log set in this fireplace with the chimney removed. If you install a decorative gas appliance (vented gas log), the decorative gas appliance must comply with the Standard for Decorative Gas Appliance for Installation in Solid Fuel Burning Fireplaces, ANS Z21.60, Z21.84 or RG 2-72 and shall also be installed in accordance with the National Fuel Gas Code, ANSI 7223NFPA 54 latest edition. WARNING: If the fireplace has been used for wood burning, the firebox and chimney must be cleaned of soot, creosote and ashes by a qualified chimney cleaner. Creosote will ignite if heavily heated. WARNING: When using a decorative vented gas log, the damper must be removed or permanently locked in the fully open position and the glass doors must be in the fully open position. Optional Gas Line Installation Continued Glass Door Installation IMPORTANT: Install glass door frame before installing glass door. Installing Door Frames 1. Remove screws from smoke shelf (see Figure 20). 2. Mount top door frame and secure with screws removed in step 1. 3. Remove center brick by pulling ring handle (see Figure 21, page 12). 4. Remove ash box. Outside of Fireplace Side Firebrick Finished Side Top Door Rail Incoming 1/2" Black Iron Pipe Gas Line Conduit Smoke Shelf Seal Opening with Refractory Cement Repack Insulation Provide Enough Threaded End for Fitting Connection Figure 19 - Gas Line Installation Figure 20 - Installing Top Door Frame 5. Remove three screws located at front of firebox (see Figure 21). 6. Align bottom rail mounting holes with holes at front of firebox and secure with screws removed in step 5. 7. Place ash box in place. Replace center brick. Installing glass doors Spring clips have been installed but some adjustments may be needed. If doors do not close properly or do not appear straight, see Door Adjustment. 1. With bi-fold doors completely folded, insert bottom pivot pin into pivot hole located near bottom corner of front face opening and swing door to vertical position making sure top pins slide into door track. Door is installed when top door pin snaps into spring clip. 2. Repeat step 1 for remaining door. If you find the doors do not close properly or do not appear level or straight, proceed with section on door adjustment, Door Adjustment Remove doors and slightly loosen lower pivot clips and upper spring clips. Replace doors and fully close them. Use 1/8" shims (any material) to level doors. Once proper setting is achieved, carefully open doors enough so that you can access spring clips with a phillips screwdriver. Tighten screws. See Figure 23. Glass Door Installation Continued Spring Clip Bottom Door Rail Ash Box Center Brick Figure 23 - Adjusting Bi-Fold Doors Screws Operation and Maintenance Guidelines Glass Doors Glass doors are optional with the fireplace. When fireplace ...

Dieses Handbuch ist für folgende Modelle:
Kamine - (V)G36 (1.09 mb)
Kamine - (V)G36H (1.09 mb)
Kamine - (V)G36HR (1.09 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien