Login:
Stimmen - 2, Durchschnittliche Bewertung: 5 ( )

Anleitung Vulcan-Hart, modell HCB1

Hersteller: Vulcan-Hart
Dateigröße: 10.64 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


26 GHIR44............................................................................................................................................... 26 IR1 and IR2(B) .................................................................................................................................... 27 Blower Switch (GHIR44) ..................................................................................................................... 27 Light (GHIR44) .................................................................................................................................... 28 SERVICE PROCEDURES AND ADJUSTMENTS .................................................................................................. 28 Gas Supply Checks .................................................................................................................................. 28 Regulator Adjustment (All Models) ............................................................................................................ 28 Pilot Adjustment (All Models) .................................................................................................................... 29 Burner Venturi Air Shutter Adjustment [GHCB40 and HCB2(B)] ................................................................. 29 Burner Service (All Models) ....................................................................................................................... 30 Burner Orifice Service (All Models) ........................................................................................................... 30 TROUBLESHOOTING ............................................................................................................................................ 31 – 3 – GENERAL INTRODUCTION SPECIFICATIONS This service manual was specially written for the Heavy Duty Gas Broilers. INSTALLATION AND OPERATION Detailed installation and operation instructions are included in the Installation and Operation Manual which is sent with each Broiler. CLEANING Detailed cleaning instructions are included in the Installation and Operation Manual for the appropriate model. LIGHTING PILOT Detailed lighting pilot instruction are included in the Installation and Operation Manual for the appropriate model. DATA PLATE LOCATION GHCB40 Behind the oven kick panel riveted to left corner of the oven burner box. (Removal of the kick panel is necessary to access plate.) HCB1/2(B) Riveted to front right-hand corner of the lower shelf. GHIR44 Riveted to the door liner behind the left hand door panel. IR1/2(B) Riveted to lower cabinet bottom shelf. Gas Data Model Dimensions No. of Burners per Section Total BTU /hrWidth Depth Height GHCB40 34” 391/8” 79” 4 100,000 GHCB44 34” 391/8” 79” 4 100,000 GHMCB44 34” 391/8” 57” 4 100,000 HCB1 36” 383/8” 68” 4 50,000 HCB2(B) 36” 383/8” 801/2” 4 100,000 IR1 36” 383/8” 69” 4 80,000 IR2(B) 36” 383/8” 801/2” 4 160,000 GHIR44 34” 381/4” 82” 4 80,000 TOOLS Standard ...

Dieses Handbuch ist für folgende Modelle:
Warmwasserbereiter - GHCB40 (10.64 mb)
Warmwasserbereiter - GHCB44 (10.64 mb)
Warmwasserbereiter - GHIR44 (10.64 mb)
Warmwasserbereiter - GHMCB44 (10.64 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien