Login:
Stimmen - 3, Durchschnittliche Bewertung: 3.3 ( )

Anleitung Air King, modell EI36WC60GS

Hersteller: Air King
Dateigröße: 1.67 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


House wiring locationHouse wiring locationHouse wiring locationHouse wiring locationHouse wiring location • The junction box is located on the top left side of the hood. • Wiring should enter the back wall at least 20" above the bottom of the installation height, and within 5-7/8" and 4-7/8"of the left side of the centerline. !"!#$ % #& '(&!#$)*""% #&'(& +, -. +- Installing the hood Install framing for hood support Install framing for hood supportInstall framing for hood supportInstall framing for hood supportInstall framing for hood supportInstall framing for hood support • If drywall is present, mark the screw hole locations. Remove the template. • Cut away enough drywall to expose 2 vertical studs at the holes location indicated by the template. Install two horizontal supports at least 4" X 2" between two wall studs at the bottom and upper mounting holes installation location. • The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs. • Reinstall drywall and refinish. IMPOR IMPORIMPORIMPORIMPORIMPORT TTTTTANT ANTANTANTANTANT- -----Framing must be capable of Framing must be capable ofFraming must be capable ofFraming must be capable ofFraming must be capable ofFraming must be capable of supporting 100 lbs. supporting 100 lbs.supporting 100 lbs.supporting 100 lbs.supporting 100 lbs.supporting 100 lbs. Mounting the hood Mounting the hoodMounting the hoodMounting the hoodMounting the hoodMounting the hood W WWWWWARNING: ARNING:ARNING:ARNING:ARNING: ARNING: 2 people are required to lift and position the hood onto the mounting screws. • Place the template on the wall along the horizontal line, make sure the template is leveled and centered with the centerline. • Mark “upper” screw holes locations in the wall. • IMPORTANT. Check to be sure that hole locations are leveled and correctly centered by the vertical centerline. • Drive “upper” wood screws by hand. Leave . “ of distance between the screw head and the wall. • Remove the grease filter and mount the hood onto the “upper” screws. • Mark “lower” wood screw holes locations in the wall using a pencil. Installing the hood • Remove the hood. • Install the plastic gasket to the front hood flange. • Drive “lower” wood screws, by hand. Remove screws. • Mount the hood onto the “upper” screws. • Drive and tighten the “upper” wood screws, by hand. • Drive and tighten the “lower” wood screws, by hand. Installing the hood Connecting the ductwork Connecting the ductworkConnecting the ductworkConnecting the ductworkConnecting the ductworkConnecting the ductwork • Install ductwork, making connections in the direction of airflow as illustrated. • Push duct over the exhaust outlet. • Wrap all duct joints and the flange connections with duct tape for an airtight seal. • Make the same connection in the wall or ceiling vent exit. #. !. . ". . Air deflector installation Air deflector installationAir deflector installationAir deflector installationAir deflector installationAir deflector installation (Recir (Recir(Recir(Recir(Recir(Recirculating accessories) culating accessories)culating accessories)culating accessories)culating accessories)culating accessories) • Assemble the air deflector with the duct cover bracket with 4 assembly screws provided as shown. • Measure from the bottom of the air deflector to the bottom of the hood outlet, as shown. ! • Cut the duct at the measured size. • Uninstall the air deflector removing the 4 assembly screws. • Slip the duct onto the bottom of the deflector. • Place the assembled deflector and duct over the exhaust outlet from the hood. • Assemble the air deflector to the duct cover bracket with 4 assembly screws provided as shown. 13 Making the electrical connections Electrical Shock Hazard Warning: Turn off power at the service panel before wiring this unit. 120 VAC, 15 or 20 Amp circuit required. ELECTRICAL GROUNDING INSTRUCTIONS THIS APPLIANCE IS FITTED WITH AN ELECTRICAL JUNCTION BOX WITH 3 WIRES, ONE OF WHICH (GREEN/YELLOW) SERVES TO GROUND THE APPLIANCE. TO PROTECT YOU AGAINST ELECTRIC SHOCK, THE GREEN AND YELLOW WIRE MUST BE CONNECTED TO THE GROUNDING WIRE IN YOUR HOME ELECTRICAL SYSTEM, AND IT MUST UNDER NO CIRCUMSTANCES BE CUT OR REMOVED. Failure to do so can result in death or electrical shock. • Remove junction box cover and knockout on the top left side. $ % &' " • If not already done, install 1/2” conduit connector in j-box. / 0 () 0 • Run black (live), white (neutral), and green (earth) wires (#14 AWG) accord...

Dieses Handbuch ist für folgende Modelle:
Ventilatoren - EI30WC60GS (1.67 mb)
Ventilatoren - EI30WC60GS (1.67 mb)
Ventilatoren - EI30WC60GS (1.67 mb)
Ventilatoren - EI30WC60GS (1.67 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien