Login:
Stimmen - 1, Durchschnittliche Bewertung: 5 ( )

Anleitung Bloomfield, modell 2072L

Hersteller: Bloomfield
Dateigröße: 1.86 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


LEVELING THE UNIT 1. Verify that an adjustable leg is installed at each corner of the brewer. 2. Set Brewer in its operating location. 3. Level the Brewer. A spirit level should be placed on the top of the unit, at the edge, as a guide when making level adjustments. 4. Level the unit from left to right and front to back by turning the adjustable feet. Be sure all four feet touch the counter to prevent tipping. PLUMBER’S INSTALLATION INSTRUCTIONS 1. Brewer should be connected to a POTABLE WATER, COLD WATER line. Flush water line before connecting to brewer. 2. DO NOT use a saddle valve with a self-piercing tap for the water line connection. Such a tap can become restricted by waterline debris. For systems that must use a saddle tap, shut off the main water supply and drill a 3/16” (minimum) tap for the saddle connection, in order to insure an ample water supply. Remember to flush the line prior to installing the saddle. 3. The brewer must be installed on a water line with average pressure between 20 PSI and 90 PSI. If your water pressure exceeds 90 PSI at anytime, a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid damage to filters, lines and solenoid. 4. A water shut-off valve should be installed on the incoming water line in a convenient location (Use a low restriction type valve, such as a 1/4-turn ball valve, to avoid loss of water flow thru the valve. 4 INSTALLATION INSTRUCTIONS (continued) For ‘Filter-Ready” units, refer to filter installation and hook-up instructions packed with the brewer. 5. NSF requires that the brewer be able to be moved for cleaning underneath. A flex line or loops of copper tubing will satisfy this requirement. 6. In some areas, local codes require a backflow preventer (check valve) to be installed on the inlet water line. If a back flow preventer is used, you must install a water hammer arrester in the incoming line, between the backflow preventer and the brewer inlet, as far away from the brewer as space will allow. This will relieve the excessive back pressures that can cause faucet leaks and solenoid malfunctions. ELECTRICIAN’S INSTALLATION INSTRUCTIONS REFER TO ELECTRICAL SPECIFICATIONS -Page 1 Check the nameplate to determine correct electrical service required for the Brewer to be installed. NOTE: Models 2012 & 2072 require a 115 - 125 V 15A circuit (50/60 Hz, 2 wire plus earth ground, with NEMA 5-15R or 5-20R Receptacle) Models 2016 & 2074 require a 120/240V 20A circuit (50/60 Hz, 2 hot legs / 1 neutral leg, plus earth ground). Circuit must be capable of 3500 Watts. SHUT-OFF VALVE (PROVIDED BY PLUMBER) COPPER LOOPS OR FLEX LINES (PROVIDED BY PLUMBER) WATER SUPPLY FLOW SOLENOID STRAINER WASHER NOTE: This equipment must be installed to comply with applicable federal, state and local plumbing codes and ordinances. WARNING ELECTRIC SHOCK HAZARD: Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or serious injury. IMPORTANT: Do not attempt to override the automatic tank fill feature which requires that the tank must be full of water to start operations. Any attempt to override this feature will void the warranty. IMPORTANT: Before connecting to electricity, make sure the E-Max™ has been properly connected to the water supply. IMPORTANT: Supply power must match nameplate for voltage and phase. Connecting to the wrong voltage will damage the brewer or result in decreased performance. Such damage is not covered by warranty. AGENCY LISTING INFORMATION This brewer is and listed under UL file E9253. This brewer meets Standard 4 only when installed, operated and maintained in accordance with the enclosed instructions. 5 E9253 E9253 STD 4 OPERATION OPERATION OPERATING INSTRUCTIONS IMPORTANT: All E-Max™ brewers are tested and set at the factory. If programming adjustments are necessary, refer to the E-Max™ Programming Manual (p/n/73674). To over-ride the Brew Wait mode, press and hold the BREW key for 3 seconds when the brewer is in Brew Wait mode (i.e. when brew light is flashing). The brew will proceed immediately regardless of water temperature. This feature should only be used when testing water volume, otherwise the brew will proceed with the water below the precise brew temperature. Note: the following safety features have been incorporated to prevent multiple unattended brews: The brew key is disabled during a brew cycle. This minimizes the possibility of double brewing. When the “Brew” light is on or flashing, repeated pressing of the BREW switch will be ignored, (there will be a beep each time it is pressed). A Brew will only be activated when the “Brew” light is off. 1. Energizing the Brewer: When electricity has been connected to the unit, there will be a momentary flash of the power light. Turn the brewer on by pressing the POWER key. The brewer will start to fill the tank. With the proper ...

Dieses Handbuch ist für folgende Modelle:
Kaffeemaschinen - 2016EX (1.86 mb)
Kaffeemaschinen - 2074FRL (1.86 mb)
Kaffeemaschinen - 2074L (1.86 mb)
Kaffeemaschinen - 2012 (1.86 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien