|
Anleitung Zusammenfassung
See diagram 3. 3.7 Open the second carton and carefully remove the steel outer casing components. Remove the protective plastic coating from the two side assemblies and lower them onto the engine assembly until the lugs locate as shown, check that the feet are touching the hearth. See diagram 4. 3.8 Secure the upper front panel using the 4 nuts and bolts provided. See diagram 5. 3.9 Locate the lower panels onto the lugs as shown. See diagram 6. INSTALLATION INSTRUCTIONS INSTALLATION 2 AR0631 158mm 3 AR0878 AR0879 5 6 4 12 3.10 Place the steel top onto the casing so that the 2 lugs on the underside locate the top centrally within the casing. Place the cast iron grille into the recess in the centre of the top panel and locate the blanking plate into the grill (if required). See diagram 7. 3.11 Check the pull of the flue system by applying a lighted smoke pellet to the flue system opening. If there is a definite flow into the chimney, proceed with the installation, if not; warm the chimney for a few minutes and repeat the test. IF THERE IS STILL NO DEFINITE FLOW, THE FLUE MAY REQUIRE ATTENTION - SEEK EXPERT ADVICE. 3.12 The flue system may now be connected to the stove, ensure that all joints are sealed with suitable fire resistant sealant. It is also recommended that a physical retention method may be used at the flue spigot joint, self-tapping screws being favoured. 3.13 Connect a suitable pressure gauge to the test point located on the inlet fitting, and turn the gas supply on. Light the appliance and check all gas joints for possible leaks. Turn the appliance to maximum and check that the supply pressure is stated on the databadge. Turn the gas off and replace the test point screw, turn the gas on and check the test point for leaks. To access the ceramic fuel pieces, it will be necessary to remove the glass door. Lift off the decorative steel trim, see Diagram 8 and remove the 6 screws holding the glass frame. See Diagram 9. 4.1 Place the flame baffle onto the shelf at the rear of the tray and push up against the rear ledge, see diagram 10. INSTALLATION INSTRUCTIONS INSTALLATION 7 AR0882 4. FUEL BED ARRANGEMENT 8 9 10 AR0365 13 4.2 Locate the front coal moulding in front of the flame baffle ensuring that the end legs sit flat against the burner skin, see diagram 11. 4.3 Place three large coals on the front coal so that they lean against the flame baffle, and the four large coals on the flame baffle so that they sit on the fingers, see diagram 12. 4.4 Place two small coals at each end of the front coal so that they lean against the flame baffle, and a further two large coals on the flame baffle, one at each end, see diagram 13. 4.5 Place five small coals along the rear of the flame baffle, resting against the rear ledge, see diagram 14. 4.6 Ensure that the rope seal on the back of the glass frame is intact. Replace the glass frame ensuring that the 6 screws are tightened evenly. DO NOT OVERTIGHTEN. see diagram 15. NEVER OPERATE THE STOVE WHEN THE DOOR IS REMOVED OR WHEN THE GLASS IS BROKEN. 4.7 Secure the glass frame assembly using the 6 screws provided, tighten evenly and do not overtighten. See diagram 15. 4.8 Hang the dcorative steel trim onto the glass frame as shown. See diagram 17 5.1 Full instructions are given in Section 2. INSTALLATION INSTRUCTIONS INSTALLATION 11 AR0366 12 AR0367 13 AR0368 14 AR0369 15 AR0887 17 5. LIGHTING 14 INSTALLATION INSTRUCTIONS COMMISSIONING 1.1 Close all openable doors and windows in the room. Ignite the stove and operate on maximum for 10 minutes. Position a lighted smoke match just inside the draught diverter opening and check that all smoke is drawn into the opening. In restricted locations a mirror can be used. See diagram 1. If there is any doubt, run the stove for a further 10 minutes, and repeat the test. 1.2 If there are any extractor fans in adjacent rooms, the test must be repeated with the fans running on maximum and interconnecting doors open. IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE AND SEEK EXPERT ADVICE. For future reference record the installation details on the Appliance Commissioning Checklist of these instructions. 1. COMMISSIONING 1 15 IGNITION FUNCTIONAL CHECK 1 PILOT WILL NOT LIGHT Ensure there is no debris around the pilot assembly, (e.g. soot, etc.) which could short the spark, clean the area. Operate the valve. Is there a spark? Consult Section 2 on page 4 and retry. Check alignment of pilot burner head. Change the ignition lead, see diagram 1, Servicing Requirements. Check isolation tap and gas meter, retry. Correct and retry. Purge the gas pipes and retry. SEE 'NO SPARK' CHART SYSTEM OK There is a blockage in the system, check the inlet test point, the mag seating, valve and pilot filter. Is the gas turned on to the appliance? Is the gas pressure correct? Has the system got any air in it? Does the pilot light? Is the control being operated correctly? Will the pilot light with a match? No Yes No Yes No Yes Yes No No Yes No No Yes Yes SERVIC...
Dieses Handbuch ist für folgende Modelle:Kamine - AR0367 (383.21 kb)
Kamine - AR0368 (383.21 kb)
Kamine - AR0369 (383.21 kb)
Kamine - AR0887 (383.21 kb)