Login:
Stimmen - 4, Durchschnittliche Bewertung: 4.5 ( )

Anleitung State Industries, modell GPO84 315

Hersteller: State Industries
Dateigröße: 202.54 kb
Dateiname:
Unterrichtssprache:
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Optional Features: – NOTE: This Outline Is NOT A Warranty. – Two Stage Pump – For use with underground oil storage tanks. complete information, consult the written – ASME Construction – Available on models GPO84 315, GPO75 385, GPO75 455, warranty or State Water Heaters. GPO69 700. ASME units have 160 psi working pressure. For more information on Titan™ contact: State Water Heaters 500 Tennessee Waltz Parkway, Ashland City, TN 37015 800-365-0024 Toll-free USA SCOSS00105 October 2012R COMMERCIAL ™ TITAN Commercial Oil Water Heater SPECIFICATIONS E B A C D . NPT INLET & OUTLET OPENINGS 1. NPT T&P VALVE OPENING ELEC. ENTRY ASME(ON SELECTED MODELS) Output (Gallons) Approximate Storage Input* ShippingModel Number Capacity BTU/Hr. Firing Recovery Dimensions In Inches Wt. (lbs.) Water U.S. Rate Motor Connections Gallons GPH HP Standard ASME In Out . . . . ™™ . . ™™ . . ™™ . . ™™ . . *Based on No.2 fuel oil. Capacity ratings are actual heater performance at 80% thermal efficiency. **These models are available with ASME construction. When ordering ASME construction, add “ A ” to end of model model. Example: GPO 69 700OE A NOTE: Above 2000. altitude, input ratings should be reduced 4% for each 1000. above sea level. GPO SUGGESTED SPECIFICATION Water heater(s) shall be commercial oil model number______________or equivalent. Heater(s) shall have a minimum oil firing rate of ______________gph at 100°F temperature rise and a storage capacity of _________________gallons. The 160 psi working pressure tank shall be glass-lined with the alkaline borosilicate composition being fused to the steel at 1600° and be equipped with 1-1/3” water inlet and outlet openings, and 2-3/4” x 3-3/4” boiler-type hand-hole cleanout (2) on GPO84 315 and larger or ASME models. The tank shall be insulated with 2. of vermin proof fiber glass insulation. The outer jacket shall have baked enamel finish over a bonderized undercoating. The burner shall be Underwriters’ Laboratories listed and have a ___________________(one or two) stage oil pump. The burner shall have flame retention, interrupted ignition and be equipped with primary controls which will provide for 15 second safety shutdown in the event of flame failure. The heater(s) shall be factory equipped with primary controls which will provide for 15 second safety shutdown in the event of flame failure. The heater(s) shall be factory equipped with temperature limiting device, drain valve, flame observation port and 180° adjustable thermostat having upper and lower sensing bulbs which average the water temperatures at the top and bottom of the tank for maximum water temperature control. A pressure and temperature relief valve shall be furnished and installed by the factory. Heater tank shall have a 3 year limited warranty against corrosion and tank failure due to sediment buildup as outlined in the warranty. CAUTION: Unit must be installed on non-combustible surface. MULTIPLE INSTALLATIONS Furnish and in...

Dieses Handbuch ist für folgende Modelle:
elektrische Heizungen - GPO69 700 (202.54 kb)
elektrische Heizungen - GPO75 385 (202.54 kb)
elektrische Heizungen - GPO75 455 (202.54 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien