Login:
Stimmen - 4, Durchschnittliche Bewertung: 4 ( )

Anleitung Ferris Industries, modell 1000z Series

Hersteller: Ferris Industries
Dateigröße: 913.28 kb
Dateiname: 033b6ee7-5094-4026-96c4-9163629ed850.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Store in a dry area. Hang the catcher and catcher bags to dry thoroughly before storing for a long period of time. Always store away from moisture. MOWING WITHOUT THE BLOWER For operation without the blower, the deflector must be properly installed in the down position and retained by the spring latch (Derby models only). To remove the blower, reverse the installation steps. 3 Initial Installation & Assembly 48” & 52” DOUBLE-BAG COLLECTION SYSTEM BLOWER MOUNT & DRIVE GROUP Remove Discharge Chute 1. Park machine on a flat, level surface and apply the parking brake. 2. Remove the discharge chute and save. Save springs and spacer (Derby Colt only). Figure 1. Chute Removal Release Mower Drive Belt Tension 1. Raise the floor pan and loosen the spring compression nut (A, Figure 2) to release the belt tension. B A Figure 2. PTO Mower Drive Belt A. Spring Compression Nut B. Idler Spring Remove Guard & Spindle Pulley 1. Remove the right-hand belt guard (A, Figure 3) and save. 2. Remove the mower deck drive belt from the right- hand spindle pulley. 3. Remove the right-hand spindle pulley (D), 5/8” nylon lock nut (B), 5/8” washer (C) and 1/4” key (E). Use a block of wood to keep the blade from spinning while removing the 5/8” nut. ABC DEGF Figure 3. Belt Guard & Pulley Removal A. GuardE. Key B. 5/8” Nylon Lock Nut F. 5/16” Washer (3) C. 5/8” Washer G. 5/16” x 3/4” Bolt (3) D. Spindle Pulley 4 48” & 52” Blower Mount & Drive Installation Install Spindle Pulley 1. Apply an anti-seize compound to the spindle shaft. Install the new, double spindle pulley (C, FIgure 4) on the shaft with the smaller pulley facing up with the 5/8” nylon lock nut (A), 5/8” washer (B) and 1/4” key (D) and tighten to 85-95 ft./lbs. Use a block of wood to keep the blade from spinning while installing and tightening the 5/8” nut. 2. Reinstall the mower deck drive belt on the new spindle pulley. Tighten the spring compression nut (A, Figure 2) until the idler spring (B, Figure 2) is 1-1/2” long. Be sure the measure the spring only. Install Guard 1. Install the new deck guard (B, FIgure 5) and secure with the 5/16-18 x 3/4” bolts (C) and 5/16” washers (D) previously removed. 2. Install the 5/16” body clips (A) over the holes in the guard with the threaded side pointing down. Mower Deck Preparation 1. Install the blower mount plate onto the chute mount tabs, with the blower mount tabs towards the rear. Secure with the retaining pin. ABCD Figure 4. Install Spindle Pulley A. 5/8” Nylon Lock Nut C. Spindle Pulley B. 5/8” Washer D. Key Figure 5. Install Guard A. 5/16” Body Clip (2) C. 5/16” x 3/4” Bolt (3) B. Guard D. 5.16” Washer (3) Figure 6. Install Blower Mount ABDC 5 48” & 52” Blower Mount & Drive Installation 2. While holding the mount plate vertical and against the chute mount tabs, place the spacers on the mower deck in the recesses of the mount plate. Make sure they are at the bottom of the recess (see Figure 7). Mark their location with a paint pen or prick punch. 3. Remove the spacers and blower mount plate. 4. Drill 5/16” holes where the spacer location was marked. 5. Install the spacers (C, FIgure 8) and mount bar (B) on the mower deck and secure with the 5/16-18 x 11/ 4” bolts (D) and 5/16-18 nylon lock nuts (A). Figure 7. Spacer Location ABCD Figure 8. Install Quick Connect Bar A. 5/16” Nylon Lock Nut (2) C. Spacer (2) B. Quick Connect Bar D. 5/16” x 1-1/4” Bolt (2) 6 48” & 52” Blower Mount & Drive Installation Blower Preparation 1. Remove the belt guard (A, Figure 9) and hardware (B & C) from the blower housing and set aside. NOTE: Record the model and serial number of the blower on the warranty registration card and in the space provided on Page 1. The serial tag is located on the outside face of the blower housing. 2. Fasten the idler arm assembly (G) to the blower housing with 5/16-18 x 1-3/4” bolt (D), 5/16” fender washer (E), pivot spacer (F) and 5/16-18 serrated flange nut (H). Tighten securely. Figure 10. Install Blower Mount Plate A. Blower Mount Plate D. 5/16” x 3/4” Bolt (3) B. 5/16” Self-Tap. Bolt (4) E. 5/16” Nylon Lock Nut (5) C. 5/16” x 1” Bolt (2) Figure 9. Idler Arm Installation A. Belt Guard E. 5/16” Fender Washer B. 5/16-18 x 1” Bolt F. Pivot Spacer C. 5/16” Washer G. Idler Arm Assembly D. 5/16-18 x 1-3/4” Bolt H. 5/16-18 Flange Nut 3. Remove the two 7/16” bolts and hex nuts from the inside bearing. Remove the bearing from the blower housing and discard the two hex nuts. 4. Install the blower mount plate (A, Figure 10) onto the back plate of the blower. Install the 5/16-18 x 3/4” self-tapping bolts (B), but do not tighten until all screws have been started. Tighten securely. 5. Install three 5/16-18 x 3/4” bolts (D) near the bearing. Install the two 5/16-18 x 1” bolts (C) in the two remaining holes. Note the direction of the bolts, this is critical. Secure with the 5/16-18 nylon lock nuts (E) as shown. ABCDEFGHACCEEBEBD 7 48” & 52” Blower Mount & Drive Installation 6. Install the bearing (B, Figure 11) on the shaft with ...

Dieses Handbuch ist für folgende Modelle:
Handrasenmäher - IS3000z Series (913.28 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien