Login:
Stimmen - 4, Durchschnittliche Bewertung: 3.5 ( )

Anleitung Baxi Potterton, modell Performa 28

Hersteller: Baxi Potterton
Dateigröße: 970.32 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


999999999 NAME: A.N.Installer COMPANY: Newtown Heating EXPIRES: 31 DECEMBER 2010 PHOTOGRAPH To confirm validity of this card please contact CORGI on 0870 401 2300 CORGI 00000 Fig. 6 CORGI Registration Card 6.1 Installation, Commissioning, Service & Repair 1. This appliance must be install in accordance with the manufacturer’s instructions and the regulations in force. Read the instructions fully before installing or using the appliance. 2. In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations. 3. Definition of competence: A person who works for a CORGI registered company and holding current certificates in the relevant ACS modules, is deemed competent. 4. IN IE (Eire), this must be carried out by a competent person as stated in I.S. 813 “Domestic Gas Installations”. All CORGI registered installers carry a CORGI identification card (see Fig. 6) and have a registration number. You can check your installer is registered by telephoning 0870 4012300 or writing to: 1 Elmwood, Chineham Business Park, Crockford Lane, Basingstoke. RG24 8WG. or check online at The boiler meets the requirements of Statutory Instrument “The Boiler (Efficiency) Regulations 1993 No 3083” and is deemed to meet the requirements of Directive 92/42/EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels: Type test for purpose of Regulation 5 certified by: Notified Body 0085. Product/Production certified by: Notified Body 0085. For GB/IE only. 6.2 Benchmark Commissioning Checklist 1. Please ensure that your installer hands you the boiler Installation & Service Instructions with the “Benchmark Commissioning Checklist sections completed. The details in the Checklist will be required in the event of any warranty work. Keep the instructions in a safe place and ensure that the Service Interval Record at the back is completed at each service visit. © Baxi Heating UK Ltd 2007 7.0 Setting the Timer 10 © Baxi Heating UK Ltd 2007 7.1 Setting the Timer The Electro-Mechanical Timer allows the central heating system to be set every 15 minutes. Using the three position switch the timer will allow either constant operation, timed operation or central heating off. Move the switch button by sliding to the desired position. Three position switch (Fig. 7) Constant (Top position): The heating will be on constantly irrespective of the position of the tappets.The heating will be controlled by the main thermostat on the appliance and/or any external controls. Timed (Central position): The heating will operate according to the position of the tappets and be controlled as above. 0 Off (Bottom position): No central heating. Domestic hot water will operate on demand. To set the time of day Turn the timer outer bezel clockwise, to align the pointer with the correct time to the nearest 15 minutes ensuring that A.M./P.M. is considered. Do not at any time attempt to turn the bezel anti-clockwise. To set the timed heating program Decide which times of the day the central heating is required. The heating will operate when the white tappets are set to the outer edge of the bezel. To ensure the heating stays OFF set the required tappets inwards towards the centre of the bezel. Each tappet represents 15 minutes. For example: If the heating is not required between 10 A.M. and 11 A.M. the four tappets anticlockwise from the 10 A.M. will be set inwards (Fig. 8). 2 3 4 5 AM 7 8 9 10 N 0 9 10 11 12 1 2 3 4 5 PM 7 8 9 10 11 12 1 2 3 4 5 AM 7 8 9 10 11 12 GRASSLIN 0 4 Constant Time Pointer Timed Off Rotate to adjust time Off Position On Position Time Pointer Fig. 7 Fig. 8 8.0 Emergency Warning ! If you smell gas Turn off the gas supply at the meter and call your gas supplier immediately. It is possible to isolate the boiler at the isolating valve (Fig. 9). In GB, Transco operate a 24 hour emergency service and the telephone number will be listed in your telephone directory. Faulty boiler If it is known or suspected that a fault exists on the boiler, it must not be used until the fault has been corrected by a competent person. Fig. 10 Gas Tap Fig. 9 Heating Flow, Heating Return and Mains Water Inlet Isolating Valves In an Emergency If a water or gas leak occurs or is suspected, the boiler can be isolated at the inlet valves as follows; 1. Using a suitable open ended spanner, turn the square nut on the gas tap through 90° (1/4 turn) to isolate the gas supply at the boiler (Fig. 9). 2. The water isolating valves are positioned under the boiler and can be closed by turning their taps to the right towards the wall (Fig. 10). 3. Call your Installer or Service Engineer as soon as possible. © Baxi Heating UK Ltd 2007 Please complete the boxes below Serial Number Date of Installation DDMMYY Installer Details (name, address and contact number(s)) Information Label All descriptions and illustrations provided in this leaflet have been carefully p...

Dieses Handbuch ist für folgende Modelle:
Warmwasserbereiter - 24 (970.32 kb)
Warmwasserbereiter - 33 HE (970.32 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien