
Be sure to hold the console mast firmly as it will not stay in the upright position on its own. E Insert DOLT (D) and 1 FLAT WASHER (E) through LEFT CONSOLE MAST followed by a WAVY WASHER (F) and attach to MAIN FRAME. A Pull LEAD WIRE through RIGHT CONSOLE MAST After pulling the LEAD WIRE through the mast, the top of the CONSOLE CABLES should be located at the top of the mast Detach and discard LEAD WIRE. B Open HARDWARE BAG 2. C Move RIGHT LINKAGE ARM into position and attach to ELEVATION F