Login:
Stimmen - 4, Durchschnittliche Bewertung: 4 ( )

Anleitung CFM, modell PEF30

Hersteller: CFM
Dateigröße: 36.34 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


6. Secure fan assembly to shutter using screws and washers. 7. Ensure that fasteners are snug. Do not over tighten to avoid stripping nylon inserts. M MMO OOD DDE EEL LL S SSE EEF FF- --3 330 00 C CCo oon nnt tte een nnt tts ss: :: Pre-assembled guard mount fan, shutter, shutter mounting hardware kit, package of mounting screws. To mount shutter to fan assembly: 1. Shutter mounting hardware kit includes: 4 rubber vibration isolators, 8 rubber inserts, 8 screws (#8-32 x 11/2”) and 8 rubberized washers. 2. Insert screws into washers - rubber side down. 3. Place rubber inserts into round holes of corner gussets at rear of shutter. It may be necessary to twist and push or tap lightly to seat rubber inserts properly. 4. Place shutter face down (gusset side up). Center vibration isolators over rubber inserts. 5. Place fan assembly on shutter so that wire hooks on fan guard are centered over vibration isolators and nylon inserts. Junction box must be positioned at bottom with shutter blades opening upwards. 6. Secure fan assembly to shutter using screws and washers. 7. Ensure that fasteners are snug. Do not over tighten to avoid pulling out rubber inserts. M MMO OOD DDE EEL LLS SS P PPE EEF FF- --1 110 00 T TTH HHR RRO OOU UUG GGH HH P PPE EEF FF- --3 330 00 C CCo oon nnt tte een nnt tts ss: :: Pre-assembled panel mount fan. M MMO OOD DDE EEL LLS SS G GGE EEF FF- --1 110 00 T TTH HHR RRO OOU UUG GGH HH G GGE EEF FF- --3 330 00 C CCo oon nnt tte een nnt tts ss: :: Pre-assembled guard mount fan. I IIN NNS SST TTA AAL LLL LLA AAT TTI IIO OON NN P PPR RRO OOC CCE EED DDU UUR RRE EE M MMO OOD DDE EEL LLS SS S SSE EEF FF- --1 110 00 T TTH HHR RRO OOU UUG GGH HH S SSE EEF FF- --3 330 00 When shutter is mounted to fan assembly: 1. Cut square wall opening size .” larger than fan blade diameter. 2. From inside of building / room, center fan assembly over wall opening. Fan must be positioned so that junction box is located at bottom and shutter is level and square, with shutter blades opening upwards. 3. Lag fan to wall through mounting holes in shutter gusset, using appropriate fasteners (by others). 4. Rotate fan impeller by hand, ensuring that it is unobstructed and rotates freely. 5. Make electrical connections to fan junction box. When shutter and fan assembly are mounted separately: 1. Cut wall opening size .” larger than fan blade diameter. 2. From inside of building / room, center fan assembly over wall opening. Fan must be positioned so that junction box is located at bottom. 3. Lag fan to wall through wire hooks on guard, using the appropriate fasteners (by others). 4. Apply caulking compound (by others) to rear of shutter gusset. 5. From outside of building / room, center shutter over wall opening, ensuring that shutter is level and square, with shutter blades opening upwards. 6. Lag shutter to wall through mounting holes in shutter gusset, using appropriate fasteners (by others). 7. Rotate fan impeller by hand, ensuring that it is unobstructed and rota...

Dieses Handbuch ist für folgende Modelle:
Ventilatoren - GEF10 (36.34 kb)
Ventilatoren - GEF30 (36.34 kb)
Ventilatoren - M-0710 (36.34 kb)
Ventilatoren - PEF10 (36.34 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien