Login:
Stimmen - 5, Durchschnittliche Bewertung: 3.4 ( )

Anleitung AEG, modell T-365BK

Hersteller: AEG
Dateigröße: 1.13 mb
Dateiname:
Unterrichtssprache:enfr
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


. Local codes may vary. Installation, electrical connections, and grounding must comply with all applicable codes. NOTE: The cooktop must be completely removed from cut-out to service. The lower firebox is not supported by the counter. DROP-IN COOKTOP CUT-OUT DIMENSIONS aAs defined in the "National Fuel Gas Code" (ANSI Z223.1, latest edition). NOTE: See manufacturer's recommendations for ducting specifications. A) 18"min. B) 13” max. C) 5" min. to combustiblesA D) 19-3/4" depth E) 34-3/4" for CT-365 28-5/8" for CT-304 F) 36" hood width min. for CT-365 30" hood width min. for CT-304 G) 2-1/2" H) 5" I) 18" 8 INSTALLATION INSTRUCTIONS DROP-IN COOKTOP CUT-OUT DIMENSIONS (when installing with a DCS DD-36 or DD-30 Downdraft Ventilation System) aAs defined in the “National Fuel Gas Code” (ANSI Z223.1, latest edition). NOTE: See manufacturer's recommendations for ducting specifications. NOTE: When installing a 30" Cooktop with a Downdraft (DD-30SS), a minimum of a 26" cabinetry depth is required. 18"min. 13” max. 5"min.to combustiblesA 19-3/4" depth 34-3/4" width for CT-365 28-5/8" width for CT-304 33-1/2" width for DD36 27-1/2" width for DD30 1/2" min. 2-1/2" 9" 26-1/2" Min. 36" for CT-365 Min. 30" for CT-304 GAS HOOK UP: Supply: Pressure Inches W.C.: 11.0~14.0"-LPG/6.0~9.0"-Natural Gas Verify the type of gas supplied to the location.The cooktop is shipped from the factory set for Natural Gas or LP (propane), depending on the specific model ordered. Verify that the cooktop is compatible with the gas at the installation site before proceeding further. Return cooktop to dealer if the unit is not set for site gas supply. A manual valve must be installed external to the appliance, in an accessible location from the front for the purpose of shutting off the gas supply. Make sure the gas supply is turned off at the wall valve before connecting the appliance. The gas supply connections should be made by a qualified technician and in accordance with local codes or ordinances. Locate Gas Supply and Electrical Supply, referring to the illustrations below. 9 INSTALLATION INSTRUCTIONS GAS CONNECTION FOR CT-365 GAS CONNECTION FOR CT-304 COUNTER TOP REGULATOR . I Installer supplied shut-off valve must /be easily accessible j inside cabinetry COUNTER TOP /REGULATOR ) 4 FOOT POWER CORD „ Installer supplied 9°° Eitowl shut-off valve must supplied* I be easily accessible (CT-304 o / inside cabinetry 1 only) 1 only) "\ .J Г® m "ELECTRIC SUPPLY • Required when unit is installed over Wall Oven GAS SUPPLY GAS SUPPLY Power Requirements: 120 VAC, 60 Hz., single phase. CT-304/CT-365:0.10 Amp. Max. (Use 15 Amp. circuit minimum) ■ Always disconnect the electric supply cord from the wall outlet or turn off the electricity at the service disconnect before servicing this appliance. ■ Observe all governing codes and ordinances when grounding,in the absence of which, observe National Electrical Code ANSI/NFPA No. 70-1990. Recommended Grounding Method: This appliance is factory equipped with a power supply cord with a three-prong grounding plug (with polarized parallel blades). It must be plugged into a mating grounding-type receptacle, connected to a correctly polarized 120 Volt circuit. If the circuit does not have a grounding type receptacle, it is the responsibility and obligation of the installer or user to have the existing receptacle changed to a properly grounded and polarized receptacle in accordance with all applicable local codes and ordinances by a qualified electrician. In the absence of local codes and ordinances, the receptacle replacement shall be in accordance with the National Electrical Code. THE THIRD GROUND PRONG SHOULD NOT, UNDER ANY CIRCUMSTANCES, BE CUT OR REMOVED. The electrical supply must be a 120 volt, 60 Hz single phase, 15 AMP circuit. The power receptacle must be a NEMA 5-15R device to accept the three prong plug supplied with the unit. 10 INSTALLER FINAL CHECKLIST GENERAL □ Placement of Unit. □ Specified clearance maintained to cabinet surfaces. □ Unit Level- front to back, side to side. □ All packaging material and tie straps removed. ELECTRICAL: □ Receptacle with 15 ampere circuit protection is provided for service cord connection. □ Adequate ground connection. GAS SUPPLY: □ Connection: 1/2 NPT with a minimum 5/8" diameter flex line. □ The pressure regulator which is connected to the manifold is set for 4.0"W.C. for Natural Gas or 10"W.C.for LP. □ Manual gas shut-off valve installed in an accessible location. □ Unit tested and free of gas leaks. OPERATION: □ All internal packing materials are removed, i.e. below grates, around knobs, etc. □ Bezels centered on burner knobs and knobs turn freely. □ Each burner lights satisfactorily, both individually and with other burners operating. □ Low flame operation verified. □ All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide. □ Bu...

Dieses Handbuch ist für folgende Modelle:
Kochfelder - CT-365SS (1.13 mb)
Kochfelder - CT-365SS (1.13 mb)
Kochfelder - T-365BK (1.13 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien