Login:
Stimmen - 2, Durchschnittliche Bewertung: 3 ( )

Anleitung Elkay, modell Composite VR Fountain EDFPVR217RC

Hersteller: Elkay
Dateigröße: 79.53 kb
Dateiname: e0067a0d-d8df-429a-828e-fc18b43f3e4a.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


2 LEGEND:A = RECOMMENDED WATER SUPPLY LOCATION 3/8 O.D. UNPLATED COPPER TUBE CONNECTB = RECOMMENDED LOCATION FOR WASTE OUTLET 1-1/4" O.D. DRAINC = MOUNTING HOLES FOR TO WALL(BLOCKING & WALL SUPPORT IS REQUIRED IN THESE AREA FOR PROPER SUPPORT OF FOUNTAINS) D = 1 - 1/4' TRAP FURNISHED EDFPVR217RC INSTALLATION INSTRUCTIONS COMPOSITE BACK PANEL 1. Wall should already be framed for the fountain using the positioning dimensions shown in Fig. 2. Shown dimensions pertain to installation location (framing must support up to 150 lbs. weight). 2. Install rough-in plumbing as shown in Fig. 2. Run supply water inlet line and connect to a service stop (not provided). Turn on supply water and flush thoroughly. Close water supply. 3. Remove bottom access panel from fountain basin and save the screws. Install the fountain to the back panel and wall using (4) 5/16" bolts and washers (not provided). Bolts should be long enough to securely fasten the fountain to the wall. Tighten securely, but do not over tighten. Over tightening will crack the Marblyte Fountain. 4. Remove elbow from end of p-trap (item 1) and attach it to drain tube. Re-attach elbow to p-trap and cut waste tube to required length using plumbing hadware and trap as guide. 5. Make water supply connections from service stop to the fountain strainer (Item 16) by inserting the water inlet line into the inlet side of strainer until it reaches a positive stop about 3/4", (See Figure 6, Page 7). Turn on water supply and check for leaks. Newly installed water supply line should be insulated after leak check is completed. DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT. 6. These products are designed to operate on 20-105 PSIG supply line pressure. If inlet pressure is above 105 PSIG, a pressure regulator must be installed in the supply line. Any damage caused by reason of connecting these products to supply line pressure lower than 20 PSIG or higher than 105 PSIG is not covered by warranty. 7. Check stream height from bubbler. Stream height is factory set at 45-50 PSI. If supply pressure varies greatly from this, adjust the screw on regulator item 14 by using a small screwdriver through the small hole in the push button item 8 (See Fig.3). Clockwise adjustment will raise stream height and counterclockwise adjustment will lower stream height. For best adjustment stream height should be approximately 1-1/2" (38mm) above the bubbler. 8. Replace bottom access panel to fountain basin using screws provided. Tighten securely. Care and Maintenance of ELKAY Composite Fountains Elkay Composite fountains provide an exremely durable, nonporous surface which resists staining. Care is very simple. Routine cleaning with a soft sponge or cloth, or with water or non-abrasive aerosol foam cleaner, is all that is normally needed to give many years of trouble free service. Cleaners left standing on the fountain surface can dull the surface finish. Be certain to rinse all cleaning agents completely and polish with a soft cloth. Harsh abrasive cleaners are not required and should not be used. Mild abrasives such as liquid automotive cleaning compound or baking soda paste will remove simple scratches and stains. Cigarette burns can normally be removed without noticeable effect. Deeper scratches or gouges can be corrected with fine grit sandpaper (240 grit then 400 grit) or a green Scotchbrite pad. To maintain or regain luster and make cleaning easier, periodic applications of automobile wax or like products will keep the finish looking like new. PAGE 3 98409C (Rev. B - 9/08) 98409C (Rev. B - 9/08) EDFPVR217RC FIG. 3 8 12 9 BASIN 3 14 15 6 10 SEE FIG. 7 TOP VIEW 17 18 1 21 2, 4, 20 16 11 5, 7 SEE FIG. 3 13 FIG. 4 PAGE 4 22 25 23 EDFPVR217RC FIG. 6 FIG. 5 TUBE IS SECURED IN POSITION SIMPLY PUSH IN TUBE TO ATTACH PUSH IN COLLET TO RELEASE TUBE PUSHING TUBE IN BEFORE PULLING IT OUT HELPS TO RELEASE TUBE OPERATION OF QUICK CONNECT FITTINGS NOTE: WATER FLOW DIRECTION BUILDING WATER INLET SERVICE STOP (NOT FURNISHED) 1/4" O.D. TUBE WATER INLET TO COOLER 3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY PART NO. ITEM NO. PARTS LIST Drain Screw #10-24 x 1/2 PH TR HD-Z Nut - Reg. Retain 1-1/8 - 24 Bottom - Plate (HRFG-E) Bottom - Plate (HRFG-S) Strainer-Beehive Hex - Nut Ferrule-Tailpipe Push Button Push Button Sleeve Regulator Holder Bubbler Assy VR Push Button - Extension Fountain - Galaxy Gray (HRFG-E) Fountain - Galaxy Gray (HRFG-S) Regulator Screw Cap Strainer Panel - Dbl Back Galaxy Gray Bubbler Locknut Ball Anti-Rotation Insert - Threaded Nipple Assembly Nut - Regulator Mounting Poly Tubing (Cut To Length) Wrench -Allen 7/64 LK464 112627543890 15005C 27658C 27201C 40038C 40045C 40619C 45662C 45738C 50986C 98118C 56087C 56053C 55969C 61313C 75672C 55996C 56114C 70012C 75575C 75554C 15029C 45736C 56092C 75674C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 NS DESCRIPTION FIG. 7 11 19 18 BASIN 21 Orifice Assy: Mineral deposits on orifice can ...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien