Login:
Stimmen - 2, Durchschnittliche Bewertung: 4 ( )

Anleitung GE, modell JTD910

Hersteller: GE
Dateigröße: 430.08 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


See the label attached to the top of the warming drawer for suitable models. 13 Installation of the warming drawer. Customer Service Troubleshooting Tips Installation Instructions Care and Cleaning Operating Instructions Safety Instructions Read these instructions completely and carefully. Installation Below Wall Ovens Installation below a single oven 231.2. Min. 1. Min. above toekick or adjust to oven installation height A B Oven cutout 2. 9. Min. Allow 5/8” overlap on all sides 231.4.91.4. NOTE: Additional clearance between cutouts may be required. Check to be sure that oven supports above the warming drawer location do not obstruct the required interior 231.2. depth and 91.4. height. 2x2 or 2x4 anti-tip block against rear wall 9” from floor to bottom of block 101.2. Installation below a double oven 231.2. NOTE: Additional clearance between cutouts may be required. Check to be sure that oven supports above the warming drawer location do not obstruct the required interior 231.2. depth and 91.4. height. 2x2 or 2x4 anti-tip block against rear wall 9” from floor to bottom of block 101.2. 2. Min Dimension A Dimension B 27 . Drawer 25 1.2 . 26 3.4 . 30 . Drawer 28 1.2 . 30 . Min. Allow 5/8. overlap on all sides A Oven cutout 231.4. B 9. 91.4. 1. Min. above toekick ¦ When installed, the front face of the warming drawer will be nearly flush with cabinetry doors or drawer fronts. ¦ Drawer overlaps will conceal cut edges on all sides of the opening. The rough opening for the drawer must be: —Depth: 231.2. minimum from inside back to front of cabinet frame. —Width: 251.2. for 27. wide models 281.2. for 30. wide models. —Height: 91.4. —Allow 2. minimum between oven and drawer 14 cutouts for clearance of overlaps. NOTE: If you are installing in frameless cabinets, it may be necessary to install 1/2. wide cleats to accept drawer mounting screws. See drawer to find exact locations of mounting screws. When installed under a wall oven: Warming drawers are suitable for installation below only certain specified wall oven models. See the label attached to the top of the warming drawer for suitable models. NOTE: Electrical receptacle can be installed as shown for countertop installations. Do not install receptacle above the top of the warming drawer cutout. Read these instructions completely and carefully. Provide Cabinet Support 2. x 4. or equivalent runners 2. x 4. or equivalent runners Safety Instructions Operating Instructions Care and Cleaning Installation Instructions Troubleshooting Tips Customer Service 231.2. 22. 27. IMPORTANT: When installed below a single or double oven, check to be sure that any oven supports above the cutout do not obstruct the 231.2. required depth of the warming drawer cutout. ¦ A 2. minimum clearance between oven and warming drawer cutouts are required. Additional clearance may be required if 2 x 4 blocks are used to support runners or solid floor of the oven above. ¦ The warming drawer may be supported by either a solid bottom, 2 x 4 or 2 x 2 runners. Step 1—Install Anti-Tip Brace WARNING: ANTI-TIP PRECAUTIONS: The anti-tip brace must be installed to prevent the drawer from tipping forward when opened and loaded. Failure to do so could result in personal injury. 231.2. 25. 30. ¦ The support must be level and rigidly mounted, flush with the bottom edge of the cutout. There is no way to level the drawer once it has been installed. Be sure supports are level. ¦ The entire weight of the drawer is supported by the runners or solid floor and must be capable of supporting 150 lbs. Install 2x4 or 2x2 anti-tip brace against rear cabinet wall 9. from floor to bottom of brace 2x4 or 2x2 runners or solid bottom 9. 15 Customer Service Troubleshooting Tips Installation Instructions Care and Cleaning Operating Instructions Safety Instructions Installation of the warming drawer. Read these instructions completely and carefully. Step 2—Install Warming Drawer Slide the left corner into opening and push power cord into the hole leading to the outlet location. Thread the cord through as drawer is being pushed back into the opening. If the outlet is installed inside the opening, plug the cord into the outlet. Coil power cord and install it in the clip on the right side of the unit. Make sure the cord does not get trapped by the drawer. NOTE: Insure that the power cord does not contact the hot surfaces on the bottom of ovens, cooktops, or any other appliance. Push the drawer back until the front flange is flush to the cabinet front. Open the drawer fully. Drill pilot holes through the holes in the overlapping frame, one on each corner. Drive wood screws provided into each corner. 16 Before You Call For Service… Troubleshooting Tips Save time and money! Review the chart on this page first and you may not need to call for service. Problem Possible Causes What To Do Warming drawer will not work A fuse in your home may be blown or the circuit breaker tripped. • Replace the fuse or reset the circuit breaker. Warming dr...

Dieses Handbuch ist für folgende Modelle:
Andere Küchengeräte - JTD910BBBB (430.08 kb)
Andere Küchengeräte - JKD910 (430.08 kb)
Andere Küchengeräte - JTD910SBSS (430.08 kb)
Andere Küchengeräte - JTD910WBWW (430.08 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien