
Position the tongue weldment between the front pull brackets welded to the front crosstube. Install the two 5/8” x 11/2” bolts with washers and nylock nuts as shown in the exploded parts diagram. NOTE: Nylock nuts are used at locations where some pivoting motion is expected between the bolted parts. It is suggested that nylock nuts be tightened to just a snug fit and then backed off 1 - 11/2 turns. Install the two 1/2”x 31/2” shift pins to lock the tongue weldment to the front crosstube pull bra