Login:
Stimmen - 3, Durchschnittliche Bewertung: 3 ( )

Anleitung Breckwell, modell P4000

Hersteller: Breckwell
Dateigröße: 584.23 kb
Dateiname: ed24552a-025d-4722-af65-42f6183d791c.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


When passing through additional floors or ceilings, always install firestop spacer. 2. After lining up for hole in roof, cut either around or square hole in roof, always 3” larger all the way around pipe. Install upper edge and sides of flashing under roofing materials, nail to the roof along upper edge. Do not nail lower edge. Seal nail heads with non-hardening waterproof mastic. 3. Apply non-hardening, waterproof mastic where the storm collar will meet the vent and flashing. Slide storm collar down until it sits on the flashing. Seal and install cap. Mobile home installations must use a spark arrester. C. VERTICALLY INTO EXISTING CHIMNEY SYSTEM Adapters are available to adapt from 3” L-Vent to 6” or 8” Class-A chimney. (Figure 8a) As an alternative, 3” or 4” L-Vent can be run inside existing chimney to termination. (Figure 8b) This is the preferred method. Follow guidelines for equivalent vent length. FIGURE 8b FIGURE 7 FIGURE 8a INSTALLATION 9 INSTALLATION 9 D. VERTICALLY INTO EXISTING MASONRY FIREPLACE NOTE: See “VENTING” and follow L-Vent chimney manufacturer’s instructions. 1. Have the masonry chimney inspected by a qualified chimney sweep or installer to determine its structural condition. 2. You will need a pipe length equal to the chimney height from the hearth. If outside combustion air is to be used, you will need a pipe length equal to the chimney height plus 18 inches. 3. Install a blanking plate and the chimney pipe, and if used the outside air pipe, as shown in Figure 9. 4. Attach the L-Vent adapter, a section of pipe and clean out tee, making sure the clean out tee is centered in the chimney flue area. 5. Position the stove, adhering to the clearances in Figures 1 & 2. 6. Measure and build chimney top plate. Cut out holes for chimney pipe, and if used the outside air pipe. Install and seal with non-hardening mastic to prevent water leakage. Install vent cap. E. INSTALLATION THROUGH SIDE OF MASONRY CHIMNEY NOTE: See “VENTING” and follow L-Vent chimney manufacturer’s instructions. 1. Position the stove, adhering to the clearances in Figures 1 & 2. Mark the center of the hole where the pipe is to pierce the masonry chimney. 2. It will be necessary to break out the masonry around the location of the pipe center mark. Use a 4-inch diameter hole for 3-inch pipe and 5-inch diameter hole for 4-inch pipe. 3. Measure and build chimney top plate. Cut out holes for chimney pipe, and if used the outside air pipe. 4. Install the tee on the bottom of the vertical pipe system and lower it down the chimney until the center branch of the tee is level with the center of the hole in the masonry, as shown in Figure 10. 5. Install and seal the top plate from step 3 with non- hardening mastic. Slip the storm collar over the pipe, and while holding the pipe at the proper elevation, affix the collar with a minimum of three .” stainless steel sheet metal screws. Seal all joints and seams around the collar. 6. Connect the horizontal pipe by pushing it through the hole in the masonry and lining it up with the branch in the tee. Push the pipe into the tee while twisting it to lock it into the tee. 7. If desired, once the horizontal pipe is in place, the space between the pipe and masonry may be filled with high-temperature grout. 8. Install the trim collar. An adjustable pipe length and adapter may be needed to finish the connection to the stove. FIGURE 9 FIGURE 10 INSTALLATION10 INSTALLATION10 ELECTRICAL INSTALLATION This stove is provided with a 6-foot grounded electrical cord extending from the rear of the stove. We recommend connecting to a good quality surge protector that is plugged into a standard three-prong, 120V, 60hz electrical outlet. Voltage variations can lead to serious performance problems. The Breckwell electrical system is designed for 120V AC with no more than 5% variation. Breckwell cannot accept responsibility for poor performance or damage due to inadequate voltage. If connected to an older, two-prong outlet, a separate ground wire should be run to a proper ground (refer this to a qualified technician). Always route the electrical cord so that it will not come in contact with any hot part of the stove. SPECIAL MOBILE HOME REQUIREMENTS WARNING: DO NOT INSTALL IN A SLEEPING ROOM. For installation in a mobile home, an outside source of combustion air must be used (see “COMBUSTION AIR SUPPLY”). The P4000 must be grounded to the steel chassis of the home with 8 Ga. copper wire using a serrated or star washer to penetrate paint or protective coating to ensure grounding. The P4000 must be securely fastened to the floor of the mobile home through the threaded holes in the bottom of the stoves rear legs using 2, .-20 lag bolts that are long enough to go through both a hearth pad, if used, and the floor of the home. (See figure 11) Refer to “VENTING” for proper exhaust configurations. CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED. BOLT HOLES FIGURE 11 OP...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien