Login:
heruntergeladen wurde: 1   Dateigröße: 93 kb   Hersteller: Elkay  
Kategorie: Gefrieren
@name

Inline strainer must be used on the inlet water line. Start-up 1. Turn on building water supply and check all connections for leaks. Repair as required. 2. Stream height is factory set at 35 PSI. If stream height needs to be changed adjust the regulator in the freeze resistant package. Clockwise adjustment raises stream height, counter clockwise adjustment will lower stream. 3. Adjust operating cable as required. Cable system should have a minimal amount of free play to allow for proper valve op

heruntergeladen wurde: 0   Dateigröße: 93 kb   Hersteller: Elkay  
Kategorie: Gefrieren
@name

(Fountain should be mounted to exterior wall) Create a loop in the cable and thread the free end of the cable through the wall into the freeze resistant box. The adjustment nuts should be in the middle of threaded area on the operating cable. See Figure 9 2. Connect free end of operating cable to the valve-operating bracket. The end of the cables must be recessed into the indents on the pivot brackets. 3. Remove cable free play by adjusting the jam nuts on the ends of the operating cable. See Fi

heruntergeladen wurde: 0   Dateigröße: 93 kb   Hersteller: Elkay  
Kategorie: Gefrieren
@name

J - 8/07) EDFP210FP*B EDFP214FP*B EDFP217FP*B FINISHED FLOOR Wall should already be framed Shown dimensions pertain to These dimensions are required ANSI Standard A117.1. and ADA (Framing shown for reference Remove bottom cover 2. Install the fountain 3. using bolts and washers (not provided). Tighten securely. Attach drain tube4. to fountain and cut Install freeze-resistant - see box instructions. Replace6. bottom cover. 97565C (Rev. J - 8/07) PAGE 4 EDFP217FPMOUNTING BOLT AND ACCESS HOLE LAYOU





Kategorien