Do not apply AC power before you ensure that grounds are connected. Electrical shock can cause serious or fatal injury. NEC requires that the frame and exposed conductive surfaces (metal parts) be connected to an approved earth ground. Local codes may also require proper grounding of generator systems. The NEC requires that the frame and exposed metal surfaces be at local ground reference potential to avoid electrical shock hazard. A local ground reference may require a driven earth ground condu
Table of Contents Section 1 Product Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 Safety Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Da das R-Y Signal im ersten und zweiten Quadrat NTSC-kodiert ist, sollten die Laufzeitschaltung und der PAL-Schalter jede R-Y Information eliminieren, da diese in aufeinander folgenden Zeilen der ersten beiden Quadrate subtrahiert wird. Wenn ein Amplitudenfehler zwischen direktem und verzögertem Signal auftritt, wird der Diffe-renz-Ausgang der Verzögerungsschaltung ein R-Y Signal im ersten und zweiten Quadrat aufzeigen. Der PAL-Schalter wird dies Signal in aufeinanderfolgenden Zeilen invertiere
After these checks have been performed and the system operation is verified to be good, refer to Section 5 Maintenance for periodic checks that must be performed at scheduled intervals to ensure continued operation with minimal problems. WARNING: Disconnect the battery’s ground terminal before working in the vicinity of the battery or battery wires. Contact with the battery can result in electrical shock when a tool accidently touches the positive battery terminal or wire. The risk of such shock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . !1-1! Safety Notice!. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . !1-1! Responsibility!. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1. Set the Voltage Select Switch to 240/120V position. 2. Start the engine. 3. Immediately adjust the Voltage Adjust for 240VAC nominal before the 20 second timer expires. 4. The new 240V nominal voltage is now locked in. This procedure must be performed whenever the nominal voltage is changed. MN2417 Operation 4-7 Pre.Start Procedure Before attempting to start the generator set, several things must first be verified or performed. These are: 1. Fill system fuel tank with clean, fresh diesel fuel