Login:
Stimmen - 3, Durchschnittliche Bewertung: 4.3 ( )

Anleitung Chamberlain, modell 1255R - 1/2HP

Hersteller: Chamberlain
Dateigröße: 1.27 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


1. Measure the distance from each side of the motor unit to the structural support. 2. Cut both pieces of the hanging bracket to required lengths. 3. Drill 3/16" pilot holes in the structural supports. 4. Attach one end of each bracket to a support with 5/16"-18x1-7/8" lag screws. 5. Fasten the opener to the hanging brackets with 5/16"-18x7/8" hex bolts, lock washers and nuts. 6. Check to make sure the rail is centered over the door (or in line with the header bracket if the bracket is not centered above the door). 7. Remove the 2x4. Operate the door manually. If the door hits the rail, raise the header bracket. 8. Grease the top and underside of the rail surface where the trolley slides with rail grease. WARNING To avoid possible SERIOUS INJURY from a falling garage door opener, fasten it SECURELY to structural supports of the garage. Concrete anchors MUST be used if installing any brackets into masonry. Figure 1 Nut 5/16"-18 Measure Distance Lag Screws 5/16"-18x1-7/8" Structural Supports Bolt 5/16"-18x7/8" Lock Washer 5/16" Figure 2 Hidden Hex Bolt 5/16"-18x7/8" Nut 5/16"-18 Lock Washer 5/16" Lag Screw 5/16"-9x1-5/8" HARDWARE SHOWN ACTUAL SIZE Bracket (Not Provided) Lag Screws 5/16"-18x1-7/8" — FINISHED CEILING — Support (Not Provided) Bolt 5/16"-18x7/8" Lock Washer 5/16" Nut 5/16"-18 Bolt 5/16"-18x7/8" Lock Washer 5/16" Nut 5/16"-18 17 INSTALLATION STEP 6 Install the Door Control Locate the door control within sight of the door at a minimum height of 5 feet (1.5 m) where small children cannot reach, and away from all moving parts of the door and door hardware. 1. Strip 1/4" (6 mm) of insulation from one end of the bell wire. Connect it to the two screw terminals on the back of the door control by color: white wire to 2 and white/red wire to 1. 2. Fasten the Lighted Door Control Button securely with 6ABx1-1/2" screws. If installing into drywall, drill 5/32" holes and use the anchors provided. 3. Run the bell wire up the wall and across the ceiling to the opener. Use insulated staples to secure the wire in several places. Do not pierce wire with a staple, creating a short or open circuit. 4. Receiver terminal screws and the antenna are located on the back panel of the opener. Position the antenna wire as shown. 5. Connect the bell wire to the opener terminal screws: white to 2 and white/red to 1. 6. Use tacks or staples to permanently attach the entrapment warning label to the wall near the door control, and the manual release/safety reverse test in a prominent location on the inside of the garage door. NOTE: DO NOT connect the power and operate the opener at this time. The trolley will travel to the full open position but will not return to the close position until the sensor beam is connected and properly aligned. See Safety Reversing Sensor instructions beginning on page 21. WARNING To prevent possible SERIOUS INJURY or DEATH from electrocution: • Be sure power is not connected BEFORE installing door control. • Connect ONLY to 24 VOLT low voltage wires. To prevent possible SERIOUS INJURY or DEATH from a closing garage door: • Install door control within sight of garage door, out of reach of children at a minimum height of 5 feet (1.5 m), and away from all moving parts of door. • NEVER permit children to operate or play with door control push buttons or remote control transmitters. • Activate door ONLY when it can be seen clearly, is properly adjusted, and there are no obstructions to door travel. • ALWAYS keep garage door in sight until completely closed. NEVER permit anyone to cross path of closing garage door. Drywall Anchors Insulated Staples Screw 6ABx1-1/2" Lighted Door Control Button HARDWARE SHOWN ACTUAL SIZE Opener Terminal Screws Bell Wire Antenna BACK PANEL Lighted Door Control Button Terminal Screws Bell Wire WHT RED KG KG 1 3 9 7 5 1 3 9 7 5 2 31 -2 -1 Lighted Door Control Button 18 INSTALLATION STEP 7 Install the Light and Lens INSTALL THE LIGHT • Install a 75 watt maximum light bulb in the socket. The light will turn ON and remain lit for approximately 4-1/2 minutes when power is connected. Then the light will turn OFF. • Use standard neck Garage Door Opener bulbs for replacement INSTALL THE LENS (All models except 1240R) • Locate and loosen (approximately 1/8" (3 mm)) the two screws near top of opener front panel. • Position lens against panel with slotted tabs directly below screws. Slide lens up to seat tabs behind screws. • Snap bottom tabs of lens into panel slots. • Retighten top panel screws to secure lens. Lens Slot 75 Watt Max. Light Bulb Lens Tab Light Lens Panel Screw INSTALLATION STEP 8 Attach the Emergency Release Rope and Handle • Thread one end of the rope through the hole in the top of the red handle so "NOTICE" reads right side up as shown. Secure with an overhand knot at least 1" (2.5 mm) from the end of the rope to prevent slipping. • Thread the other end of the rope through the hole in the release arm of the outer trolley. • Adjust rope length so the handle is 6 feet (1...

Dieses Handbuch ist für folgende Modelle:
Safety Gate - 1240R - 1/4HP (1.27 mb)
Safety Gate - 1245R - 1/3HP (1.27 mb)
Safety Gate - 1246R - 1/3HP (1.27 mb)
Safety Gate - 1256R - 1/2HP (1.27 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien