Login:
Stimmen - 3, Durchschnittliche Bewertung: 4.3 ( )

Anleitung GTO, modell SL-1000

Hersteller: GTO
Dateigröße: 3.5 mb
Dateiname: a42de078-4360-41db-99f0-f7ecf3ee092f.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Do not exceed 1000'. NOTE: Pull approximately 1 foot of extra low voltage wire into the control box to accommodate terminal connections. To maintain adequate charging power, use appropriate gauge, stranded, direct burial wire (see Accessory Catalog). Do not use telephone wire or any solid core wire because it will not provide adequate current. Never splice wires together. RED BLK ORG BLU GRN CLS EDG OPN EDG RED GRN ORG BLU WHT BLK ORG BLU GRN CLS EDG OPN EDG LEARN AUTO CLOSE INERTIA STATUSSTATUS BATTBATT + – OBSTRUCT SENS. RCVR R G B ALARM SECOND OPERATOR FIRST OPERATOR POWER IN 18VAC SOLAR ~ ~ – + ACCESSORY PWR. SW. .. INSTALLATION OF THE GTO TRANSFORMER CONT. STEP 12: Strip 3/16" off the ends of the low voltage wire and twist tightly. These wire ends will be attached to the control board at the 18VAC terminals located on the POWER IN terminal block (see Illustration L). Wire sheathing should not come in contact with terminals, however, it should not be stripped so far that wires can come in contact with one another (see Illustration K). Insert one transformer wire into an 18VAC terminal. Insert the other transformer wire into the remaining 18VAC terminal (see illustration L). Transformer wires can be connected to the 18VAC terminals regardless of color. Tighten set screws against exposed end of wires (see Illustration K). A dab of household petroleum jelly on each wire end will help prevent corrosion. The ACCESSORY terminal block provides the connection point for safety loops, wands, push buttons, intercoms, card readers, etc. See page 27 for more information about connecting accessories. Illustration K Wrong Wrong Correct Terminal Terminal Terminal Wire Block Wire Block Wire Block Illustration L FIRST OPERA ORPOWER IN 18VAC SOLAR ~~ – + REDBLKORGBLUGRNCLS EDGOPN EDGRE REDBLACKREDBLACK Power Cable from First Operator Low Voltage Wire from AC Transformer SECOND OPER SURGE PROTECTORTransformer HINT: Keep a few mothballs in the control box to discourage insects from entering it and damaging the control board. STEP 13: Plug the transformer into the electrical outlet. Check to see if the green LED on the control board is on. If it is not, see the Troubleshooting Guide on page 30. NOTE: Use of a surge protector is strongly recommended. 19 20 CONTROL BOARD SETTINGS 1 2 3 4 ON OBSTRUCT SENS. PULL/PUSH SEQ1 SNGL/DUAL SEQ2 LEARN DIP switches MIN MAX The four DIP switches on the control board match the operator with the type of gate on which it is mounted. For example, gates may open right to left or left to right. Prior to packaging, the GTO/PRO SL-1000 and SL- 2000 series control board was configured for a single slide gate that opens right to left. If your gate type matches this configuration, you DO NOT need to adjust the DIP switches. Proceed to the Potentiometers section on the next page. NOTE: The direction a gate opens is determined by standing inside the property and facing toward the gate. NOTE: To change the DIP switch settings, you must turn the control box power switch OFF; move the switch; then turn the power back ON. Use a small screwdriver to move the switches. PULL/PUSH: Set to PULL for slide gates that open RIGHT to LEFT [factory setting]; PUSH for slide gates that open LEFT to RIGHT. SNGL/DUAL: Set to SNGL for a single gate leaf [factory setting]; DUAL for dual gate leaves. SEQ1: Controls the opening order of dual gate leaves. See Setting the Control Board for Dual Gate Operator Installation on page 37 for more information. (the factory setting is OFF). SEQ2: Controls the opening order of dual gate leaves. See Setting the Control Board for Dual Gate Operator Installation on page 37 for more information (the factory setting is OFF). DIP SWITCHES RED BLK ORG BLU GRN CLS EDG OPN EDG RED GRN ORG BLU WHT BLK ORG BLU GRN CLS EDG OPN EDG LEARN AUTOCLOSE INERTIA STATUS PULL/PUSH SNGL/DUAL SEQ1 SEQ2 MIN MAX MIN MAX OFF 60 120 BATT + – OBSTRUCT SENS. RCVR R B G ALARM SECOND OPERATOR FIRST OPERATOR POWER IN 18VAC SOLAR ~ ~ – + ACCESSORY PWR. SW. POTENTIOMETERS The three (3) potentiometers on the control board operate like a volume control on a radio. They control the auto close timer, inertia, and obstruction sensitivity of the operator. Use a small slotted screwdriver to turn the arrow in the center of the potentiometer. Clockwise rotation increases the setting (MAX). Counterclockwise rotation decreases the setting (MIN). AUTO CLOSE (auto close timer): Determines how long the gate will remain open before it automatically closes. The limits are OFF to 120 seconds. The factory setting is OFF. INERTIA: Fine tunes obstruction sensitivity in the opening and closing modes. INERTIA allows the operator to attempt to push an obstruction clear of the gate path. When INERTIA is set to MIN the operator will obstruct quickly (i.e, will attempt to push an obstruction briefly); when set to MAX the operator will obstruct slowly (i.e., will push against an obstruct for a longer period). The factory sett...

Dieses Handbuch ist für folgende Modelle:
Safety Gate - SL-2000 (3.5 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien