|
Anleitung Zusammenfassung
A drain line from the relief valve should terminate near a suitable drain. Do not thread, plug, or cap the end of the drain line. The pressure setting of the relief valve should not exceed the pressure capacity of any component in the system including the boiler. HIGH TEMPERATURE DEVICES Automatic Device The boiler control circuit contains a high temperature cutoff switch. This device shuts off the heating elements if excessive water temperatures are reached. The high temperature cutoff has an adjustable range of 100° to 240°F and automatically resets on a drop of temperature. Manual Device A manual reset high limit will be in the control circuit in addition to the automatic device previously described. The control has an adjustable range of 110° to 290°F and must be manually reset after a drop of temperature. Reset button is located under the right side panel of the boiler. Disconnect the power before removing the panel to push the button. INSTALLATION REQUIRED ABILITY INSTALLATION OR SERVICE OF THIS BOILER REQUIRES ABILITY EQUIVALENT TO THAT OF A LICENSED TRADESMAN IN THE FIELD INVOLVED. PLUMBING AND ELECTRICAL WORK ARE REQUIRED. GENERAL Do not test electrical system before boiler is filled with water, follow START UP procedure in this manual. The principal components of the boiler are identified in Figure 1. The model and rating plate, see illustration on page 4, provides certain useful information required at installation. Both of these references should be used to identify the boiler and its components. Water boilers are usually placed in series with the heating system on the outlet side of the circulating pump. The boiler piping should include inlet and outlet water valves to permit maintenance and service work to be performed without disturbing the rest of the system. Detailed system installation drawings are normally provided by the equipment purchaser or system designer. For the best installation, the boiler should be located: 1. On a level surface. • Shim the channel type skid base as necessary if leveling is required. 2. Near a floor drain. • The boiler should be located in an area where leakage of the tank or connections will not result in damage to the area adjacent to the boiler or to lower floors of the structure. When such locations cannot be avoided, a suitable drain pan should be installed under the boiler. The pan should be at least two inches deep, have a minimum length and width of at least two inches greater than the dimensions of the boiler and should be piped to an adequate drain. • The discharge opening of the relief valve should always be piped to an open drain. 3. Suggested clearances from adjacent surfaces are found on a label attached to the control compartment door. • UL minimum clearances: -24” all sides -12” top • Allow clearance for hinged control compartment doors. • Elements can be changed with 24” clearance. 4. The boiler may be installed in a confined space if adequate ventilation is provided. ELECTRICAL General Check the boiler model and rating plate information against the characteristics of the branch circuit electrical supply. Do not connect the boiler to an improper source of electricity. Voltage applied to the boiler should not vary more than + 5% to -10% of the model and rating plate marking for satisfactory operation. Do not energize the branch circuit for any reason before the boiler is filled with water. Doing so may cause the heating elements to burn out. Such damage is not covered under the terms of the warranty. The branch circuit is connected to the block through an opening provided on top of the boiler. The boiler should be connected to a separate, grounded, branch circuit with overcurrent protection and disconnect switch. These are part of the electrical supply system not components of the boiler, as such they are obtained locally. The boiler should be grounded in accordance with national and local codes. Branch Circuit The branch circuit wire size should be established through reference to the National Electrical Code or other locally approved source in conjunction with boiler amperage rating. Branch circuit wiring which connects to the boiler terminal block should be temperature rated at 75°C. For convenience, portions of the wire size tables from the Code are reproduced here. It is suggested the electrician size the branch circuit at 125 percent of the boiler rating and further increase wire size as necessary to compensate for voltage drop in long runs. Branch circuit voltage drop should not exceed 3% at the boiler. 6 Calculating Amperage/Overcurrent Protection The boiler is factory wired for connection to three wire single-phase or three and four wire three-phase branch circuits. In addition, a ground conductor may be required. A diagram of the wiring is furnished with the boiler for the electrician’s use. An amperage table is on page 4 of this manual. The boiler model and rating plate provides full load amperage data. The rating of the overcurrent pr...
Dieses Handbuch ist für folgende Modelle:Warmwasserbereiter - NW 37-670 (244.06 kb)
Warmwasserbereiter - NW 37-670 (244.06 kb)
Warmwasserbereiter - NW 37-670 (244.06 kb)