|
Anleitung Zusammenfassung
F If the boiler is installed in a compartment then the compartment MUST NOT be used for storage purposes. F Under no circumstances should any of the sealed components on this appliance be used incorrectly or tampered with. F If it is known or suspected that a fault exist on the boiler then it MUST NOT BE USED until the fault has been corrected by a CORGI registered installer or in IE a competent person. MINIMUM CLEARANCES Clearances of 200 mm (7 7/8“) above and below, 25 mm (1“) at left, 50 mm (2“) at right and 450 mm (17 3/4“) at the front of the boiler case must be allowed for servicing. After installation the following clearances are allowable during use, providing the encasing parts are removeable for servicing: The bottom clearance can be reduced to 20mm (3/4”). The front clearance can be reduced to 50mm (2”). A A B C D E F G Mini C24 Mini C28 Mini C32 BCDE FG Mini S24 Mini S28 Appliance On lamp Domestic hot water temperature control Main switch and radiator temperature control Boiler reset button Lock---out signal lamp Programmer (optional) System pressure and temperature gauge TO LIGHT THE BOILER 1 Check that the valves located in the lower part of the boiler are open. 2 Switch the the electricity supply on. The appliance On lamp A will flash every 4 seconds (stand---by condition). For combination models Mini C24, Mini C28 and Mini C32 3 If the boiler is to be used for CH and DHW position the main switch as in the following illustration. The appliance On lamp A will flash every 2 seconds (operating boiler). A C For system models Mini S24 and Mini S28 4 To operate the boiler position the main switch as in the following illustration. The appliance On lamp A will flash every 2 seconds (operating boiler). A C All CORGI registered installers carry a CORGI ID card, and have a registration number. Both should be recorded in your Benchmark Log Book. You can check your installer by calling CORGI direct on 01563 72300 Caradon Ideal Limited is a member of the Benchmark initiative and fully supports the aims of the programme. Benchmark has been introduced to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency. THE LOG BOOK SHOULD BE COMPLETED AFTER EACH SERVICE AND KEPT WITH THESE INSTRUCTIONS (button) CONTROL OF CH TEMPERATURE The output temperature of CH water is adjustable from a minimum of about 38°C to a maximum of about 85°C by turning the knob C. Approx CH flow temperatures for the boiler thermostat settings: Minimum (38 ° C) C Maximum (85 ° C) CONTROL OF DHW TEMPERATURE (Mini C24, Mini C28 and Mini C32) The temperature of the DHW leaving the boiler can be varied from a minimum of about 35°C to a maximum of about 55°C (within the power limits of the appliance) by turning the temperature control knob B. Minimum (35 ° C) B Maximum (55 ° C) Adjustment of the DHW temperature is completely separate from that ...
Dieses Handbuch ist für folgende Modelle:Warmwasserbereiter - MINI C24 (194.78 kb)
Warmwasserbereiter - MINI C28 (194.78 kb)
Warmwasserbereiter - MINI S24 (194.78 kb)
Warmwasserbereiter - MINI C32 (194.78 kb)