Login:
Stimmen - 5, Durchschnittliche Bewertung: 4.2 ( )

Anleitung Ariston, modell EURO COMBI 47-116-12

Hersteller: Ariston
Dateigröße: 994.43 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


The discharge/intake vent pipes must have the same diameter of o 80 mm. 2. The maximum combined flue length is 17 m. In this case the minimum length for the air intake pipe is 1 meter; the maximum length of vertical exhaust pipe must be a maximum of 12 m. 3. If an elbow is inserted into the discharge/ventilation system, the calculation of the overall extension must take into consideration the values for each curve, as indicated in the table. 4. The exhaust pipe must extend at least 0.5 m above the ridge of the roof if it is located on a side other than that for the air intake (this is not obligatory if the exhaust and air intake pipes are located on the same side of the building). B023 13 2.10 Room Thermostat In order to perform this procedure, remove boiler cover as indicated in section 3.2. Then proceed as follows: Connection 1 Remove the screws “A” located on the bottom part of the boiler; 2 Widen the sides so that the control panel can be rotated. 3 Open the cover “B” on the left hand side of the compartment. 4 Insert the wire for the connection of the room thermostat into the wire holder “C”, as indicated in photo 3. 3 4 C B 1 A 5 Remove the grommet “D” e a hole in it and pass the room thermostat wire through. 6 Remove the link located on the ter 7 Replace the grommet and the ter , close the cover on the grommet compar in place. 8 If a remote time clock is to be fitted, disconnect the integ k plug from the P.C.B. 9 Using a volt-free switching time cloc witching wires from the time clock following points 1-7 abo 10 If using a time clock and room ther ust be connected in series as per points 1-9 abo Note: Only a two-wire type r 5 6 7 D C 14 B023 2.11 Electrical Diagram Legend: AT = High Voltage P.C.B. BT = Low Voltage P.C.B. B = Flame Failure L.E.D. C = Insufficient Water Pressure L.E.D. D = Water Temperature Indicator L.E.D.s E = Overheat Thermostat Warning L.E.D. F = System Reset Button G = Selector Knob for Operating Mode H = Domestic Hot Water Temp. Adjustment I = Central Heating Temp. Adjustment J = Wire Connector for Room Thermostat K = Connector for Total Check System M = Anti-cycling Device Adjustment for Heating N = Soft-light Adjustment O = Max Heating Temperature Adjustment P = Time Clock Connection Q = On/Off L.E.D. R = On/Off Switch S = Interface Wire for P.C.B.s T = Relay Motorised Valve U = Ignitor Relay V = Gas Valve Relay W = Fan Relay X = Circulation Pump Relay Aa = Adaptor (British Gas use only) Y = Selector TCS2 A01 = Air Pressure Switch A02 = Fan A03 = Gas Valve A04 = Ignitor A05 = Motorised Valve A06 = Circulation Pump A07 = Flame Detector A08 = Earth Terminal A09 = Flame Detection Circuit A10 = Flame Indicator L.E.D. A11 = Transformer A12 = Filter B01 = Over Heat Thermostat B02 = Room Thermostat B03 = Gas Valve Modulator B05 = Heating Sensor B06 = Pressure Switch for Heating Circuit B07 = Microswitch for Diverter Valve Colours Gry = Grey Rd = Red Bl = Blue Grn/Yll = Yellow/Green Wh = White Brn = Brown Blk = Black Wh/Rd = White/Red B023 16 B023 A/23 MFFI - A/27 MFFI EX C-MI/FFI 8 A/23 MFFI - A/27 MFFI 2.12 Water Circuit Diagram Legend A/23 MFFI -A/27 MFFI 1. Air Pressure Switch 2. Fan 3. Main Heat Exchanger 4. Main Burner 5. Ignition Electrodes Detection Electrode 6. Gas Valve 7. Overheat Thermostat 8. Main Circuit Temperature Probe 9. Diverter Valve 10. Main Circuit Flow Switch including Safety Pressure Switch for Primary Circuit 11. Automatic By-pass 12. Microswitch for Diverter Valve 13. Secondary Heat Exchanger 14. Domestic Water Inlet Filter 15. Boiler Drain Valve 16. Safety Valve 17. Water Pressure Gauge 18. Circulation Pump with Automatic 3 COMMISSIONING Air Release Valve 19. Expansion Vessel 3.1 Initial Preparation Preliminary electrical system checks to ensure electrical safety must be carried out by a competent person i.e. polarity, earth continuity, resistance to earth and short circuit. Filling the Heating System: Remove the panels of the case and lower the control panel (see point 3.2. for further information). Open the central heating flow and return cocks supplied with the connection kit. Unscrew the cap on the automatic air release valve one full turn and leave open permanently. Close all air release valves on the central heating system. Gradually open valve(s) at the filling point (filling-loop) connection to the central heating system until water is heard to flow, do not open fully. Open each air release tap starting with the lower point and close it only when clear water, free of air, is visible. Purge the air from the pump by unscrewing anticlockwise the pump plug and also manually rotate the pump shaft in the direction indicated by the pump label to ensure the pump is free. Close the pump plug. Continue filling the system until at least 1 bar registers on the pressure gauge. Inspect the system for water soundness and remedy any leaks discovered. Filling of the D.H.W.System: Close all hot water draw-off taps. Open the cold water inlet cock supplied with the conne...

Dieses Handbuch ist für folgende Modelle:
Warmwasserbereiter - EURO COMBI 47-116-10 (994.43 kb)
Warmwasserbereiter - EURO COMBI A/27 MFFI (994.43 kb)
Warmwasserbereiter - EURO COMBI A/23 MFFI (994.43 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien