|
Anleitung Zusammenfassung
266 thru 566 forced hot water boilers or any size steam boiler. 1. Locate tank as high as possible above boiler. 2. Vertical type storage tank can be used if bottom of tank can be located above top of boiler. 3. To provide gravity circulation: a) Horizontal supply from heater to tank must pitch upward 1 inch for each 10 feet of piping. b) Horizontal return from tank to heater must pitch downward 1 inch for each 10 feet of piping. 4. Locate return piping above storage heater. 5. Use as few elbows and pipe fittings as possible. STORAGE HEATER RATINGS Boiler Size* Storage Heater Number 160° Boiler Water Heater Capacity Gallons 40®-i40° Rise 212° Boiler Water Heater Capacity Gallons 40®-140® Rise 666-766 62-2-E 50 in 3 Hours 70 in 3 Hours Recommended Storage Tank 50-90 Gallons 75-125 Gallons * No. 62-2-E storage heater cannot be used with 266 through 566 water boilers or with any steam boilers. COMBINATION PRESSURE TCUKRATUHC TAPPINGS FIGURE 8 TANKLESS HEATER PIPING (STEAM BOILER) FIGURE 9 STORAGE HEATER PIPING Section V: Non-packaged Boilers—Control & Burner Installation INSTALL BOILER CONTROLS (non-packaged boilers) WARNING Failure to properly install, pipe and wire boiler controls may result in se-.vere damage to the boiler, building and personnel, and will void the boiler warranty. Use a low water cut-off designed for water installations. An electrode probe type is recommended. Locate in a tee in supply line above boiler. 4. If the system is to comply with ASME codes, an additional high temperature limit is needed. Purchase and install in supply piping from boiler. LEFT SIDE ^ 15" minimum heater clearance. FIGURE 10 TAPPINGS LOCATION SIZE WATER STEAM C Drain Drain D (in plate) 11/2" High-Limit Control (bushed to 3/4") Skim Tapping D (in water heater) 3/4" Combination High-Limit and Operating Control — H 1M" Combination Pressure and Temperature Gauge Pressure Gauge and Pressure Limit Control J* ate" — Try Cock Tappings Ki 3/4" Pressure Relief Valve Gauge Glass and/or Low-Water Cutoff (bushed toifi") K2 3M" Plugged Gauge Glass and/or Low-Water Cutoff (bushed to 1/2") N 3/4" To Compression Tank Safety Valve FT 3/4” Limit Control Limit Control u, (in steam heater) 3k" — Heater Operating Control (366E through 566E Boilers) Ui 3/4" Plugged Heater Operating Control (666 and 766 Boilers) ’Available only on special request. WATER BOILER CONTROLS (non-packaged boilers) 1. Install controls where shown on tapping table. 2. STEAM BOILER CONTROLS (non-packaged boilers) 1. Connect a low water cut-off to gauge glass tappings K1 and K2. Refer to Figure 11. Follow instructions packed with the control. Pipe drain near the floor or floor drain. 2. Install the pigtail syphon, pressure gauge and steam pressure limit control. See Figure 11. ¿Xl^ NIPPLE FOR HIGH LIMIT PRESSURE CONTROL STEAM GAUGE ^STREET ELL 90° 1x3 NIPPLE (BRASS) £ STREET ELL 90° J LOW WATER * rilT-Orr »ft CUT-OFF *67 WP WARNING Relief valve discharge piping must be piped near to the floor or to a floor drain to eliminate potential of severe burns. Do not pipe where freezing could occur. 3. Low water cut off for water boilers: a) Should be installed if boiler is located above radiation level. b) May be required on water boilers by certain state, local or territorial codes or insurance companies. FIGURE 11 STEAM CONTROLS 3. WARNING Relief valve discharge piping must be piped near to the floor or to a floor drain to eliminate potential of severe burns. Do not pipe where freezing could occur. INSTALL OIL BURNER (non-packaged boilers) For B-66HE boiler: 1. Place gasket over end of air tube. 2. Loosely screw three mounting bolts into boiler mounting plate. 3. Mount burner. 4. Tighten mounting bolts. For A-66E boiler (see Figure 12): 1. Secure universal mounting flange and gasket to burner mounting plate. Use three bolts provided. 2. Position burner so it is level to l1^0 tilt downward. Air tube should be flush to 1k inch recessed from inside wall of combustion chamber. 3. Clamp mounting flange to burner using screws provided. GASKET BURNER TUBE CLAMP BURNER FLANGE FRONT PLATE —note: BURNER AIR TUBE MUST NOT EXTEND FAST EDGE OF REFRACTORY —BURNER AIR TUBE FRONT PLATE REFRACTORY FIGURE 12 MOUNTING OIL BURNER Section VI: Chimney & Breeching CHIMNEY OR VENT REQUIREMENTS Designed for NATURAL DRAFT FIRING ONLY. Use a Class A chimney. Minimum chimney or vent sizes are on page 12 of these instructions. In most cases a chimney or vent extended at least 3 feet above the highest part of the roof or other structure within 30 feet will be sufficient to prevent downdrafts. Increase chimney cross-sectional area and height at least 4 percent for each 1,000 feet above sea level. Examine the chimney for proper construction and possible blockage. An induced draft fan may be necessary if: 1) Excessive resistance to flow of combustion gases can be expected. 2) Cross-section area of chimney is smal...
Dieses Handbuch ist für folgende Modelle:Warmwasserbereiter - A-66E (1.27 mb)