Login:
Stimmen - 3, Durchschnittliche Bewertung: 4 ( )

Anleitung A.O. Smith, modell 201

Hersteller: A.O. Smith
Dateigröße: 335.32 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Failure to observe minimum clearances may require removal of the boiler in order to service such items as the heat exchanger and burners. In a utility room installation, the door shall be wide enough to allow the boiler to enter or to permit the replacement of another appliance. Two inch (5.1 cm) clearance is allowable from combustible construction to hot water pipes. Sufficient clearance should be provided at one end of the boiler to permit access to heat exchanger tubes for cleaning. Access to control box items such as the Central Control Board, Ignition Control Boards and wiring harnesses is provided through a panel on the left side of the unit. An 18" (46.0 cm) minimum clearance is recommended. These boilers are approved for installation on noncombustible flooring in an alcove with minimum clearance to combustibles of: 3 inches (7.6 cm) Right Side, and Back; 6 inches (15.2 cm) Top, Front Alcove, 12 inches (30.5 cm) Left Side and 6 inches (15.2 cm) Vent. For installation on combustible flooring use the Combustible Floor Kit. The combustible floor kit base adds 4" (10.1 cm) to the overall height of the boiler. See figure 3. MODEL COMBUSTIBLE FLOOR KIT NO. (GB/GW)-1000 211093 (GB/GW)-1300 211093-1 (GB/GW)-1500 211093-2 (GB/GW)-1850 211093-3 (GB/GW)-2100 211093-4 (GB/GW)-2500 211093-5 Figure 3: Boiler on Combustible Floor Base and Kit Numbers LEVELLING Each unit must be checked after installation to be certain that it is level. AIR REQUIREMENTS WARNING FOR SAFE OPERATION, AN AMPLE SUPPLY OF AIR MUST BE 7 PROVIDED FOR PROPER COMBUSTION AND VENTILATION IN ACCORDANCE WITH THE NATIONAL FUEL GAS CODE, ANSI Z223.1 OR CAN/CSA-B149.1 AND .2 (LATEST EDITIONS) OR APPLICABLE PROVISIONS OF THE LOCAL BUILDING CODES. AN INSUFFICIENT SUPPLY OF AIR MAY RESULT IN A YELLOW, LUMINOUS BURNER FLAME, CARBONING OR SOOTING OF THE FINNED HEAT EXCHANGER, OR CREATE A RISK OF ASPHYXIATION. DO NOT OBSTRUCT THE FLOW OF COMBUSTION AND VENTILATION AIR. UNCONFINED SPACE In buildings of conventional frame, brick or stone construction, unconfined spaces may provide adequate air for combustion. If the unconfined space is within a building of tight construction (buildings using the following construction: weather stripping, heavy insulation, caulking, vapor barrier, etc.), air for combustion, ventilation, must be obtained from outdoors or spaces freely communicating with the outdoors. The installation instructions for confined spaces in tightly constructed buildings must be followed to ensure adequate air supply. CONFINED SPACE (a) U. S. INSTALLATIONS When drawing combustion and dilution air from inside a conventionally constructed building to a confined space, such a space shall be provided with two permanent openings, ONE WITHIN 12 INCHES OF THE ENCLOSURE TOP AND ONE WITHIN 12 INCHES OF THE ENCLOSURE BOTTOM. Each opening shall have a free area of at least one square inch per 1000 Btuh of the total input of all appliances in the enclosure, but not less than 100 square inches. If the confined space is within a building of tight construction, air for combustion, ventilation, and draft hood dilution must be obtained from outdoors. When directly communicating with the outdoors or communicating with the outdoors through vertical ducts, two permanent openings, located in the above manner, shall be provided. Each opening shall have a free area of not less than one square inch per 4000 Btuh of the total input of all appliances in the enclosure. If horizontal ducts are used, each opening shall have a free area of not less than one square inch per 2000 Btuh of the total input of all appliances in the enclosure. (b) CANADIAN INSTALLATIONS Ventilation of the space occupied by the boiler(s) shall be provided by an opening for ventilation air at the highest practical point communicating with outdoors. The total cross- sectional area shall be at least 10% of the area of the combustion air opening but in no case shall the cross-sectional area be less than 10 square inches (6500 mm2). In addition to the above, there shall be permanent air supply opening(s) having a cross-sectional area of not less than 1 square inch per 7,000 BTUH (310 mm2/KW) up to and including 1,000,000 BTUH plus 1 square inch per 14,000 BTU in excess of 1,000,000 BTUH. This opening(s) shall be located at, or ducted to, a point neither more than 18" (46.0 cm) nor less than 6 inches (15.2 cm) above the floor level. Where power vented equipment is used in the same room as the boiler, sufficient air openings must be supplied. UNDERSIZED OPENINGS MAY RESULT IN INSUFFICIENT AIR FOR COMBUSTION. Where an exhaust fan is installed in the same room with a boiler, sufficient openings for air must be provided in the walls. UNDERSIZED OPENINGS WILL CAUSE AIR TO BE DRAWN INTO THE ROOM THROUGH THE CHIMNEY, CAUSING POOR COMBUSTION. SOOTING MAY RESULT WITH AN INCREASED RISK OF ASPHYXIATION. VENTING This boiler is approved to be vented as a Category I, Category III (horizontal venting), or a Direct Vent app...

Dieses Handbuch ist für folgende Modelle:
Warmwasserbereiter - 200 (335.32 kb)
Warmwasserbereiter - 201 (335.32 kb)
Warmwasserbereiter - 200 (335.32 kb)
Warmwasserbereiter - 1000 (335.32 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien