Login:
Stimmen - 3, Durchschnittliche Bewertung: 5 ( )

Anleitung Munchkin, modell VWH High Efficiency Hot Water Supply Boiler

Hersteller: Munchkin
Dateigröße: 1021.94 kb
Dateiname: a8e59213-ae81-44f1-8e1f-b1f627c7b807.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


All pumps are shown with isolation flanges or full port ball valves for isolation. The alternative is standard flanges with full port ball valves and a separate flow check valve. 7. Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves. 8. Install vacuum relief valve in accordance with local code requirements 9. All multiple boilers and multiple storage tanks shall be installed with reverse return piping as shown 10. Anti-scald rated mixing valve is recommended on all tanks if the leaving hot water temperature from tank is above 119 °F. 11. Expansion tank must be rated for use with potable water ASEE 1017 rated anti-scald valve (recommended) expansion tank Munchkin 1 flow switch constant circulation Munchkin 2 constant circulation vacuum breaker (where required by code) Munchkin 3 constant circulation condensate drainage flow switch flow switch Superstor Ultra Storage Tank Superstor Ultra Storage Tank hot water supplyrecirculation linecold water Fig. 5-8 PIPING Drawing VWH 3/2 VVolume Water Heating using Munchkin boiler (3 boilers supplying two storage tanks) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. Boiler circulator must be rated for open loop application. Do not use cast-iron circulators 3. Boiler circulator(s) operate continuously 4. The minimum pipe size for connecting to a water storage tank is 1 inch. 5. The minimum pipe size for connecting a Munchkin boiler is 1.25 inches for 199 VWH, and 2-inches for 399 VWH 6. All pumps are shown with isolation flanges or full port ball valves for isolation. The alternative is standard flanges with full port ball valves and a separate flow check valve. 7. Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves. 8. Install vacuum relief valve in accordance with local code requirements 9. All multiple boilers and multiple storage tanks shall be installed with reverse return piping as shown 10. Anti-scald rated mixing valve is recommended on all tanks if the leaving hot water temperature from tank is above 119 °F. 11. Expansion tank must be rated for use with potable water Munchkin 2 flow switch expansion tank ASEE 1017 rated anti-scald valve (recommended) Munchkin 3 condensate drainage flow switch flow switch Munchkin 1 constant circulation constant circulation constant circulation vacuum breaker (where required by code) Superstor Ultra Storage Tank Superstor Ultra Storage Tank hot water supplyrecirculation linecold water Drawing VWH 3/2 VVolume Water Heating using Munchkin boiler (3 boilers supplying two storage tanks) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. Boiler circulator must be rated for open loop application. Do not use cast-iron circulators 3. Boiler circulator(s) operate continuously 4. The minimum pipe size for connecting to a water storage tank is 1 inch. 5. The minimum pipe size for connecting a Munchkin boiler is 1.25 inches for 199 VWH, and 2-inches for 399 VWH 6. All pumps are shown with isolation flanges or full port ball valves for isolation. The alternative is standard flanges with full port ball valves and a separate flow check valve. 7. Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves. 8. Install vacuum relief valve in accordance with local code requirements 9. All multiple boilers and multiple storage tanks shall be installed with reverse return piping as shown 10. Anti-scald rated mixing valve is recommended on all tanks if the leaving hot water temperature from tank is above 119 °F. 11. Expansion tank must be rated for use with potable water Munchkin 2 flow switch expansion tank ASEE 1017 rated anti-scald valve (recommended) Munchkin 3 condensate drainage flow switch flow switch Munchkin 1 constant circulation constant circulation constant circulation vacuum breaker (where required by code) Superstor Ultra Storage Tank Superstor Ultra Storage Tank hot water supplyrecirculation linecold water Fig. 5-9 START-UP PROCEDURES PART 6. START-UP PROCEDURES A. SEQUENCE OF OPERATION 1. When power is first applied to the control, the control display will read the outlet temperature. The control will initially run through a self-diagnostic routine and then go into its operating mode. If there is no call for heat, the System will go into an idle state. The circulator must be wired to incoming power to operate continuously. If there is a code FL in the dis play window, then either the circulator is not operating or there is a restriction in the piping system, rendering an inadequate flow. 2. The control then performs selected system diagnostic checks. If all checks are successfully passed, a pre-purge cycle is initiated (the blower will be on maximum speed). 3. When the actual temperature is below a set-point, minu...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien