Login:
Stimmen - 3, Durchschnittliche Bewertung: 4 ( )

Anleitung Ultra Products, modell DX100H

Hersteller: Ultra Products
Dateigröße: 205.02 kb
Dateiname: DX100.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


• Suitably rated 2-core cable (DX100, DX100PC, DX100HP and DX100PIR). • Suitably rated 3-core cable (DX100T, DX100H and DX100VTD). • 3mm electrician's screwdriver and no.1 or 2 Pozdriv screwdrivers. • A wall or ceiling on/off switch with built-in indicator light (DX100, DX100T, and DX100VTD). • To prevent a possible hazardous situation from water ingress, a condensation trap (Xpelair no. XCT100) must be fitted as close as possible to the fan in all situations where any section of the duct work is positioned higher than the fan itself. If wall mounting the fan, you will also need • Masonry drill, hammer & chisel (or core drill equipment if available). • Mortar to make good the hole if required. If window mounting the fan • You will need a window pane between 3mm and 6mm thick (preferably 4mm). • Do not install in glass 3mm thick if the window pane area is more than 0.2sq.m. • If installing in sealed double glazing, a specially manufactured unit should be obtained from the glazing manufacturer. You will also require a special kit, Xpelair Cat. ref. DXDG. • If installing in sash windows, you should mount the fan in the upper window. Secure the upper sash in the closed position and fit stops just below the level of the fan, to prevent damaging it when the sash is raised. • If installing in a panel which is between 9mm and 46mm thick, you will need a special kit, Xpelair Cat. ref. DXDG. Do not install these fans in a panel which is more than 46mm thick. If ceiling mounting the fan You will need to use the appropriate ancillaries for termination. These items are available from Xpelair. 1. WT10 - Termination ducting kit. 2. CFWG100 - Soffit board termination grille (white or brown). 3. FD100 / 3 and FD100 / 6 - Flexible ducting. Where to locate the fan • Locate it as high as possible. • At least 110mm from the edges of the mounting surface to the centre of the hole. • As far away as possible from and opposite to the main source of air replacement to ensure 5 If core drill equipment is available: 4a.Use as directed by core drill manufacturer. If core drill equipment is not available: 4b. Drill a centre hole right through the wall. 5. Cut the hole. Do not cut right through the wall. (The recommended method is to drill a series of holes, close together, around the edge of the cutting line and remove the brick between the holes with a chisel). 6. Go outside and cut a hole in the outer wall, repeating the process described above. 7. Cut ducting to the correct length if required. The wall tube supplied is telescopic and can extend to 300mm maximum. 8. Fit the ducting. Ensure that the duct slopes down away from the fan to allow drainage of any incoming rain water to the outside. 9. Make good the hole. Allow the mortar to set before continuing the fan installation. If installing in a window or panel 1. Cut a hole, 125mm in diameter or if installing in a window, obtain a ready cut pane. 2. The centre of the hole should be at least 110mm away from the edge of the...

Dieses Handbuch ist für folgende Modelle:
Ventilatoren - DX100 (205.02 kb)
Ventilatoren - DX100 (205.02 kb)
Ventilatoren - DX100PC (205.02 kb)
Ventilatoren - DX100PIR (205.02 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien