|
Anleitung Zusammenfassung
DCS offers both a 6” and 12” height Duct Covers. Keep the 6 or 12 inch dimension in mind when allowing for clearance between the top of the Vent Hood and the ceiling. (see Fig. 4) 1. With the Vent Hood width, and installation site in mind, mark the centerline of the installation. 2. See the chart in Fig.4 to determine the centerline to centerline dimension of wall mounting holes for the particular model being installed. 3. Cut away enough drywall (if installed) to expose 2 vertical studs (1 on each side of the Hood center line) It will be necessary to A) construct a plywood wall insert (See Fig 5) or B) install aligning wall studs. (See Fig 6). WALL MOUNTING After an adequate wall structure has been completed, secure the DCS Duct Cover (6” or 12”) to the top of the vent hood. Carefully lift the hood with the duct cover into the installation site and secure the hood into the wall structure with 6 (six) mounting screws. Once the Hood assembly has been secured to the wall, the front of the Soffit Chimney may be removed for ductwork connections. -GO TO FINISHING THE INSTALLATION Pg.9 10"Minimum Additional Wall Studs Installed "C" "C" Centerline of installation space. HOOD WIDTH 10"Minimum Plywood Sheet (wall hole cut out x drywall thickness") No additional wall studs needed HOOD WIDTH FIG.05 FIG.06 8 Finishing The Installation Finishing The Installation 18" 3-1/2" 6-1/2" 6-1/2" "C" "C" MODEL "A" "B" "C" (see fig.1) (see fig.3) (see fig.4 above) All 48" Vent Hoods 9-1/2" 13" 13" All 36" Vent Hoods 9-1/2" 12.7/16" 9" All 30" Vent Hoods 9-1/2" 12.7/16" 9" REAR VIEW of VENT HOOD (48" Model Shown) 6" or 12" Duct Cover CEILING DRYWALL Hood Centerline CL FIG.04 TO FINISH THE INSTALLATION Once the ventilation hood has been mounted in place it will be necessary to install the electrical service. All electrical work should be done by a qualified electrician and must conform to all local standards. Refer to the wiring diagrams on Pgs. 14-15, for proper hook-up and grounding. NOTE: Black=live,White=neutral, Green=ground Complete installation by making ductwork connections, testing unit functions, and installing & finishing drywall. CARE AND USE CONTROLS- We recommend you turn your hood on before you begin cooking to establish fresh air flow.After you've finished cooking,let the blower run for a few minutes to clear the air and help keep the kitchen fresh and clean. BLOWER- The blower is operated with 2 controls. The switch adjacent to the speed control turns the blower on/off, while the speed control adjusts the blower speed. Turn the speed knob clockwise to increase and counterclockwise to decrease the blower speed. HOOD LIGHTING- A single switch controls both lights. Use only 50W Max. Halogen Narrow Flood replacement bulbs. CAUTION-Halogen lamps are constructed of a glass bulb with a pressurized internal filament tube that operates at high temperatures and could unexpectedly shatter. Should the outer bulb break, particles of extremely hot glass could be discharged into the fixture enclosure and/or surrounding environment, thereby creating a risk of personal injury or fire.When replacing the bulb, let the bulb cool, and assure that power to light has been turned off. Never allow hot bulb to come into contact with water. Do Not Touch the Hood Light Bulbs when in use.They may be hot enough to cause injury. WARMING LAMPS- Each warming lamp is controlled by its own on/off switch. Use only R40 size, 250W Max. Infrared bulbs. FILTERS- Filters should be cleaned frequently in a detergent solution and are dishwasher safe. Empty grease collection tray/s regularly. Remove filter/s by gently pulling up and out. Grease collection tray/s are beneath each filter/s. UNPLUG the BLOWER MOTOR BEFORE CLEANING VENTILATOR. -Remove filters to access blower motor plug. Vacuum blower to clean. Do not immerse in water. -Do not allow an excessive accumulation of grease. -Use a mild detergent when cleaning. -Do not use harsh abrasives, steel wool pads, or abrasive cloths. 9 Duct Information Duct Information 18-5/8" GENERAL 10" -When planning the path for ducting to the outside, keep in mind the following guidelines: 11" -Minimize use of elbows and transitions in ductwork as to 10-1/2" maximize air flow to outside of building. An efficient airflow path contributes to the overall efficiency of the Vent Hood. 4-5/8" -DCS recommends the use of smooth wall ducting, not Vertical Duct Transition flexible ductwork. -Transitions are required from rectangular to round ducting DCS-IB12 BLOWER Requires one of the following 4-1/2” x 18” to 10” round transitions (purchase separately) Model 19052-01-Vertical discharge Model 19052-02-Rear discharge Model 19052-03-Left discharge -Duct tape may be used at ducting joints. DCS VH 48 / DCS VH12 36 REQUIREMENTS -DCS recommends the use of 10” round ducting which provides 78.6 sq. In. of surface area. -Alternate duct sizes in rectangular style may be used. If a rectangular duct style is used, the duct must equal at least 7...
Dieses Handbuch ist für folgende Modelle:Ventilatoren - DCS-VH-30HS (1.1 mb)
Ventilatoren - DCS-VH-30S (1.1 mb)
Ventilatoren - DCS-VH-36S (1.1 mb)