|
Anleitung Zusammenfassung
PNEG-67. Series 200. Autoflo. Fan/Heate. Control Installatio. Instruction. MODEL # 2TF - __ __ - __ __ _. MODEL # 2TFC- __ __ __ __ _. MODEL # 2TAF - __ __ __ _. This equipment shall be installed in accordance iwth the current INSTALLATION CODES FOR GAS BURNING APPLICANCES AND EQUIPMENT, CAN1_B149.1 and B149.2, or applicable provincial regulations which should be carefully followed in all cases. Authorities having jurisdiction shuld be consulted before installations are made. 2000 Autoflo. TABLE OF CONTENT. Roof Warning, Operation & Safety................................................................................4 Safety Alert Decals.......................................................................................................5 Safety Precautions........................................................................................................6 Safety Sign-off Sheet...................................................................................................7 Fan/Heater and Control Box Mounting..............................................................................8 Autoflow Control Box Bolt Pattern.................................................................................10 Fill System Control Box Mounting.............................................................................11 Fill System Control Bolt Pattern..................................................................................12 Actuator Control Box Mounting.................................................................................13 Multi-Grain Temperature Sensor Wiring.........................................................................15 Grain Temperature Sensor Mounted to Leveling Band Post........................................16 Close-up of Grain Temperature Sensor Wiring.............................................................17 Plenum Temperature Sensor Installation..........................................................................18 Airswitch Installation.................................................................................................19 Wet Supply Rotary Switch..........................................................................................21 Storage Chamber High Limit Rotary Switch Installation...........................................22 Drying Chamber Rotary Switches...............................................................................25 Drying Chamber Low-Level Rotary Switch Installation............................................26 Drying Chamber High-Level Rotary Switch Installation...........................................28 Drying Chamber Overflow Switch Installation.............................................................30 LP Fuel Specifications and Recommendations................................................................32 NG Fuel Specifications and Recommendations...............................................................33 Conduit Runs................................................................................................................34 Electrical Power Supply....................................................................................................35 Figure 12: Ground Rod.....................................................................................................36 Power/Motor Wiring........................................................................................................37 Main Power Schematic.................................................................................................37 Electrical Load Information.............................................................................................38 Wire Size Information................................................................................................39 Fill System Control Box Electrical Load Information.................................................40 Autoflow to Master Fan/Heater Unit Interconnect...........................................................42 Autoflow to Actuator Interconnect.............................................................................43 Autoflow to Wet Supply Rotary Switch Interconnect.................................................44 Autoflow to Storage Chamber Rotary Switch Interconnect.......................................45 Autoflow to Drying Chamber Rotary Switches Interconnect..........................................46 Autoflow to Fill System Control Box Interconnect....................................................48 Autoflow to Ground Interconnect.............................................................................. 49 Master to Slave Interconnect......................................................................................50 Slave to Slave Interconnect.........................................................................................51 Battery Hook-Up...........................................................................
Dieses Handbuch ist für folgende Modelle:Ventilatoren - AUTOFLOW 2TF (2.92 mb)
Ventilatoren - AUTOFLOW 2TFC (2.92 mb)