Login:
Stimmen - 3, Durchschnittliche Bewertung: 3.3 ( )

Anleitung Kuppersbusch USA, modell IKD 12250.0

Hersteller: Kuppersbusch USA
Dateigröße: 753.87 kb
Dateiname: 11d5bc95-71c0-4d61-a151-507a5972ba1f.pdf
Unterrichtssprache:enfr
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


WARNING - TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: Installation Work And Electrical Wiring Must Be GB 4 Done By Qualified Person(s) In Accordance With All Applicable Codes And Standards, Including Fire-Rated Construction. Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent backdrafting. Follow the heating equipment manufacturer’s guideline and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities. When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities. Ducted fans must always be vented to the outdoors. WARNING • Electrical ground is required on this rangehood. • If cold water pipe is interrupted by plastic, nonmetallic gaskets or other materials, DO NOT use for grounding. • DO NOT ground to a gas pipe. • DO NOT have a fuse in the neutral or grounding circuit. A fuse in the neutral or grounding circuit could result in electrical shock. • Check with a qualified electrician if you are in doubt as to whether the rangehood is properly grounded. • Failure to follow electrical requirements may result in a fire. GB 5 CHARACTERISTICS Dimensions GB 6 Components . . Ref. 1 Q.ty 1 Product Components Hood Body, complete with: Controls, Light, Blower, Filters 2 1 Telescopic Chimney comprising: 2.1 1 Upper Section 2.2 1 Lower Section 7.1 7.1a 7.1b 8a 8b 14.1 1 1 1 1 1 1 Telescopic frame complete with extractor, consisting of: Upper frame Lower frame Right Air Outlet Grill Left Air Outlet Grill Air Outlet Connection Extension 15 24 25 1 1 2 Air Outlet Connection Junction box Pipe clamps Ref. 11 12c 12e 12f 12g 12h 21 22 23 Q.ty 4 6 2 4 4 4 1 4 4 Installation Components Wall Plugs o 10 Screws 2,9 x 9,5 Screws 2,9 x 6,5 Screws M6 x 10 Screws M6 x 80 Screws 5,2 x 70 Drilling template 6.4 mm int. dia washers M6 nuts Q.ty 1 Documentation Instruction Manual GB 7 INSTALLATION Drilling the Ceiling/shelf and fixing the frame DRILLING THE CEILING/SHELF • Use a plumb line to mark the centre of the hob on the ceiling/support shelf. • Place the drilling template 21 provided on the ceiling/support shelf, making sure that the template is in the correct position by lining up the axes of the template with those of the hob. • Mark the centres of the holes in the template. • Drill the holes at the points marked: • For concrete ceilings, drill for plugs appropriate to the screw size. • For hollow brick ceilings with wall thickness of 20 mm: drill o 10 mm (immediately insert the Dowels 11 supplied). • For wooden beam ceilings, drill according to the wood screws used. • For wooden shelf, drill o 7 mm. • For the power supply cable feed, drill o 10 mm. • For the air outlet (Ducted Version), drill according to the diameter of the external air exhaust duct connection. • Insert two screws of the following type, crossing them and leaving 4-5 mm from the ceiling: • For concrete ceilings, use the appropriate plugs for the screw size (not provided). • For Cavity ceiling with inner space, with wall thickness of approx. 20 mm, Screws 12h, supplied. • For wooden beam ceilings, use 4 wood screws (not provided). • For wooden shelf, use 4 screws 12g with washers 22 and nuts 23, provided. GB 8 GB 9 FIXING THE FRAME • Loosen the two screws fastening the lower chimney and remove this from the lower frame. • Loosen the two screws fastening the upper chimney and remove this from the upper frame. If you wish to adjust the height of the frame, proceed as follows: • Unfasten the eight metric screws joining the two columns, located at the sides of the frame. • Adjust the frame to the height required, then replace all the screws removed as above. • Insert the upper chimney stack from above, and leave it running free on the frame. • Lift up the frame, fit the frame slots onto the screws up to the slot end positions. • Tighten the two screws and fasten the other two screws provided with the hood. Before tightening the screws completely it is possible to adjust the frame by turning it. Make sure that the screws do not come out of their seats in the slotted holes. • The frame mountings must be secure to withstand the weight of the hood and any stresses caused by the occasional side thrust applied to the device. On completion, check that the base is stable, even if the frame is subjected to bending. • In all cases where the ceiling is not strong enough at the suspension point, the installer must provide strengthening using suitable plates and backing pieces anchored to the structurally sound parts.Connections DUCTED VERSION AIR EXHAUST SYSTEM When installing the ducted version, connect the hood to the chimney using either a flexible or rigid pipe o 150 mm, the choice of which is left to the installer. • Fix the pipe us...

Dieses Handbuch ist für folgende Modelle:
Ventilatoren - IKD 12250.0 (753.87 kb)
Ventilatoren - IKD 12250.0 (753.87 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien