Login:
Stimmen - 3, Durchschnittliche Bewertung: 3 ( )

Anleitung Spalding, modell 21166904

Hersteller: Spalding
Dateigröße: 765.17 kb
Dateiname: 96b7fbe4-be7e-9d24-b513-a0be22b4b816.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Opposite Side View 20 18 19 A. 19 A. Carefully attach cable end to actuator plate (47). 47 19 B. Begin trigger assembly by pulling wire through slot on trigger(48) as shown. Complete this assembly by installing trigger to plates with bolt (53) and bolt (58). 7 42 52 58 66 48 NOTE: DO NOT OVERTIGHTEN NUT (42) ONTO BOLT (58). TRIGGER (48) SHOULD MOVE FREELY. P/N 21166904 10/04 14 20. 20. Slide shroud over strut assembly and attach shroud with screw (60) as shown. 60 15 10/04 P/N 21166904 RIM ASSEMBLY & INSTALLATION WARNING 21. Install carriage bolt (41) through rim (25), washers (4) and (27) as shown. Tighten nut (43) completely. Place nut (42) about half-way up carriage bolt (41) as shown. 25 4 41 27 43 TWO PERSON MINIMUM REQUIRED FOR THIS PROCEDURE. NOT FOLLOWING RECOMMENDATION MAY RESULT IN SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE. 42 41 27 Attach foam pad (19) to Backboard. Attach bracket (39) to backboard and support structure by inserting bolts (26) and washers (24) through top holes in bracket (39), Tighten nuts (23) completely. 26 39 2423 2422. 23 24 24 40 26 Insert inner bracket (40) into bracket (39) as shown. Insert bolts (26) and washers (24) through top holes of inner bracket (40) as shown. Now tighten backboard/frame nuts (23) completely. 23. 39 40 39 19 P/N 21166904 10/04 16 24. 24. Insert spacer (45) through rim assembly (25). Place rim assembly on bracket (39) so that carriage bolt (41) is inserted through hole on top of inner bracket (40). Install hex bolt (44), washers (27) and nut (42) through top holes on bracket (39) through spacer (45) as shown.Tighten completely. BOTTOM VIEW 45 25 2539 40 41 27 44 2727 45 42 25. Install spring (28), concave washer (29) and center lock nut (30) to carriage bolt (41) as shown. NOTE Do not over tighten as rim will not flex properly. See leveling instructions to determine how much to tighten nuts (42) and (30). 28 41 30 29 17 10/04 P/N 21166904 26. LEVELING INSTRUCTIONS: Place level on rim (25) and adjust nut (42) until 25 level. Tighten nut (30) to set rim tension for playing. 42 30 Apply logo label (33) to cover plate (31). Install 27. 33 cover plate (31) on rim (25) using self tapping 31 screws (32) as shown. NOTE ORIENTATION OF COVER PLATE 32 Secure net (34) to NOTE: Official rim height is 28. rim (25). 10’ (3.05 m) from top of rim to playing surface. 34 25 12 10 feet (3.05 m) OUTSIDE VIEW 34 P/N 21166904 10/04 18 29. 29. Check leveling at this time. Pole should be level in all directions. NOTE: If adjustment is necessary, adjust system by rotating the nuts (2) between mounting plate (3) and pole flange. (Referred to in Step 6.) After system is leveled, completely tighten nuts (7) above pole flange. 30. Apply height adjustment label (37) to front of pole as shown. 10 feet (3.05 m) REGULATION RIM HEIGHT IS 10 FEET (3.05 m). 37 19 10/04 P/N 21166904 P/N 21166904 10/04 20 31. Attach hook (49) to height strip (50) as shown. Attach this assembly to unit with bolt (12) and nut (7) as shown. 49 50 12 15 63 62 21 10/04 P/N 21166904 51 51 57 32. Attach height window (51) to pole using four pieces of double-sided tape (57) as shown. 111/2” 50 Secure pole pad (35) as shown. 33. 64 To install height marking labels (10), raise backboard so that the rim is 10’ off the playing surface (two people required for this procedure). Remove 10’ mark label from sheet and insert label on (50) through window of (51). Repeat for all other height markings. 10 To install height marking labels (10), raise backboard so that the rim is 10’ off the playing surface (two people required for this procedure). Remove 10’ mark label from sheet and insert label on (50) through window of (51). Repeat for all other height markings. 10 P/N 21166904 10/04 22 Jam Hex Nuts If the elevator is still difficult to operate, verify that the valves located on the strut are fully depressed when the trigger is activated. NOTE: two people are required for this procedure. Adjust exposed cable length, located next to the trigger (See Step 19) by using the jam hex nuts on the cable end. Slide outer shroud to exposed valves. The valves must be fully depressed so elevator can be adjusted smoothly and fully extended to lock the elevator. Valve Trigger released, locking elevator Trigger squeezed, unlocking elevator Valve 23 10/04 P/N 21166904 Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Qty. Part No. 4 200573 12 265575 1 920880 23* 203474 1 980835 1 200544 12 206340 8 220589 4 908066 1 201504 2 220586 4 200574 1 906835 8 200704 2 202459 4 202856 1 908061 2 908062 1 203274 1 901492 2 901490 4 203113 12* 203100 12 203218 1 920263 4 201611 12* 203232 1 200484 1 200323 1 201124 1 960043 2 220140 1 220569 Description J-Bolt, 1/2”-13 x 24” Nut, Hex 1/2”-13 Mounting Plate Washer, Flat 1/2” x 1” O.D. Pole Pole Cap, Square Nylon Insert Lock Nut, Hex 1/2”-13 Cap, Arm Support Insert Support Arm Label, Height Marker Logo Label, 15” x 1 3/4” Bolt, Hex Flange 1/2”-13 x 9” H-...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien