Login:
Stimmen - 3, Durchschnittliche Bewertung: 5 ( )

Anleitung BodyCraft, modell BCG 446

Hersteller: BodyCraft
Dateigröße: 2.87 mb
Dateiname: dce41d10-fa87-40a6-a386-964572799967.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


(NOTE: Do Not tighten).. Attach PEC DEC UPRIGHT(2) and PRESS UPRIGHT(3) to TOP FRAME(10) each using two 3/8"X3" HEX HEAD BOLT(78), four 3/8" WASHER(90) and two 3/8" NYLON.. NUT(87). .. Please check the TOP FRAME(10) is EVENLY seated on CENTER UPRIGHT(4), PRESS UPRIGHT(3) and PEC DEC UPRIGHT(2) and tighten all bolts and nuts GRADUALLY, not individually. Attach AB PULLEY TUBE(11a) to PRESS UPRIGHT(3) using two 3/8" x 3" HEX HEAD BOLT(78), four 3/8" WASHER(90) and two 3/8" NYLON NUT(87). 9 STEP 4 ASSEMBLE PEC DEC STATION 17 16 17R 17R 14 14 19 19 13 17L 93 92 65 65 65 32 72 76 76 91 93 73 89 89 86 93 40 72 90 90 90 31 87 33 34 33 56 59 56 59 86 89 86 Attach PEC DEC SUPPORT(13) and PEC DEC PULLEY BRACKET(12) to PEC DEC UPRIGHT(2) using two 1/2" X 4" HEX HEAD BOLT(72) and two 1/2" NYLON NUT(86). Insert four 3/4" BUSHINGS(65) into PEC DEC SUPPORT(13). Slide ADJ. CAM(14) onto the axle of RIGHT PEC DEC ARM BRACKET(16). Then thread.. the axle of RIGHT PEC DEC ARM BRACKET(16) through the hole on PEC DEC SUPPORT(13) and attach using 1/2" WASHER(89), 1/2" SPRING WASHER(92) and 1/2".. NYLON NUT(86)... Tighten NYLON NUT(86) and back off approximately 1/2 tum so that arm moves freely. Repeat the same process to LEFT PEC DEC SET(17L). Be certain the two ADJ. CAMS(14) are evenly seated on PEC DEC SUPPORT(13) and two PEC DEC ARMS(17) are WORKING SMOOTHLY before tighten with 1/2" WASHER.. (89), 1/2" SPRING WASHER(92) and 1/2" NYLON NUT(86). Attach PEC DEC SEAT BAR(19) and CONNECTOR PLATE(11) to PEC DEC UPRIGHT (2) using two 3/8" X 4" HEX HEAD BOLT(76), four 3/8" WASHER(90) and two 3/8" NYLON NUT(87). 10 STEP 5 ASSEMBLE PRESS STATION 10 20 21 93 76 33 33 32 32 66 66 85 71 88 88 36 36 55 55 76 90 90 90 87 93 32 32 32 67 67 86 74 23 3 Insert two 5/8" ID BUSHINGS(66) into TOP FRAME(10). Attach PRESS ARM(20) to TOP FRAME(10) using 5/8" X 7-1/2" HEX HEAD BOL T(71), two 5/8" WASHER(88) and 5/8" NYLON NUT(85). Attach PRESS SEAT FRAME(21) to PRESS UPRIGHT(3) using two 3/8' X 4" HEX HEAD BOLT(76), four 3/8" WASHER(90) and two 3/8" NYLON NUT(87). Attach LEG EXTENSION(23) to PRESS SEAT FRAME(21) using 1/2" X 3-1/8" HEX HEAD BOLT(74), two 1/2" WASHER(89) and 1/2" NYLON NUT(86), then cap 1/2" bolt and nut with CAP FOR 1/2" NUT(93). 11 T6 3 79 80 68 68 49 90 90 90 90 87 T2, T4, T7,T9, T10 1 82 87 49 T1 45a 82 49 87 20 T3, T5 75 75 69 69 69 69 49 49 90 90 90 90 87 87 T8 29 T11 87 82 49 95 (45a) T1 T3 T2 T4 T5 T6 T7 T8 T8 T9 T10 T11 T7 STEP 6 INSTALL TOP CABLE Assemble cables and pulleys simulltaneously. Insert threaded end of TOP CABLE(45a) into slot in front of TOP FRAME(10), over pulley T1, around pulley T2, T3, T4, T5, down to pulley T6, around pulley T7, down to pulley T8, over pulley T9, T10 and screw into SELECTOR ROD(9). Attach pulley T6 to PRESS UPRIGHT(3) using one 3/8" X 2-3/4" HEX HEAD BOLT.. (79), two 3/8" WASHERS(90) and two 3/8" ID X 10mm BUSHINGS(68). 12 STEP 7 INSTALL PEC DEC CABLE (46a) P1 P1 P1, P5 P2 P2 P2, P4 P4 P4 P5 P5 P3 P3 28 14 17R 17L 46a 12 18 18 81 82 81 90 90 90 87 49 87 49 Loosely attach pulley P2 and P4 and CABLE GUIDE(18) to PEC DEC PULLEY BRACKET(12). Insert one end of PEC DEC CABLE(46a) into receiver on right ADJ CAM(14) as shown and route cable over pulley, behind PEC DEC UPRIGHT(2), over pulley and insert opposite end into receive on left ADJ CAM(14). Place pulley P3 over the PEC DEC CABLE(46a) and attach SINGLE PULLEY BRACKET(28) as shown and let it dangle behind PEC DEC UPRIGHT(2). Tighten bolts. Make certain the CABLE GUIDE(18) do not rub on the cable throughout the entire range of motion. 13 STEP 8 INSTALL LINK CABLE (47a) C1 C1 47a 47a P3 P3 C3 C3 10 C2 C2 29 82 95 43 43 49 87 28 Insert one eyelet end under P3 and hook on the eyelet end on SINGLE PULLEY BRACKET(28). Route cable under and around pulley C2. Hook the opposite eyelet end on triangle plate(welded on TOP FRAME(10)). 14 STEP 9 INSTALL AB CABLE A4 T8 29 87 82 49 A6 C2 29 49 82 87 A5 1 82 87 49 (94a) A1 A1, A2 3, 11a 2 A2 A3 A3 A7 A5 A6 A7 C2 A4 T8 79 80 80 68 68 49 49 90 90 90 90 90 90 87 87 87 82 27a Insert eyelet end of AB CABLE(94a) into slot in front of PRESS UPRIGHT(3), over pulley A1, A2 down and around pulley A3 up and around pulley A4 down and around pulley A5 up and around A6, then insert the eyelet end into the slot of PEC DEC UPRIGHT(2) and fixed using 3/8" x 2-1/2" HEX HEAD BOLT(80), two 3/8" WASHER(90) and 3/8" NYLON NUT(87). 15 STEP 10 INSTALL LOWER CABLE (48a) 48a L3 A3 49 87 82 27a L1 L1 L2, L4, L5 1 L6 23 1 L2 L5 L4 L6 82 82 87 87 87 90 83 49 49 A3 L3 Insert eyelet end of LOWER CABLE(48a) through the "U" shape bracket of foot rest in front of BASE FRAME(1) and route cable under pulley L1, L2, up and around pulley L3, down and around pulley L4, under pulley L5 then attach the eyelet end under the cam of LEG EXETESION using 3/8" x 1" HEX HEAD BOLT(83) and 3/8" NYLON NUT(87). 16 STEP 11 INSTALL ACCESSORIES 57 57 62 63 61 43 43 43 44 25 58 58 26 43 60 51 52 60 60 60 60 60 37 37 37 37 24 24 24 41 35 82 82 82 90 90 35 35 41 35 77 7...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien