Login:
Stimmen - 2, Durchschnittliche Bewertung: 4.5 ( )

Anleitung Alliance Laundry Systems, modell DRY710C

Hersteller: Alliance Laundry Systems
Dateigröße: 1.02 mb
Dateiname: 513005.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


(5 cm) Minimum 5 NOTE: Where the exhaust duct pierces a combustible wall or ceiling, an opening must be sized as shown or per local codes. 3 1 45 24 in. (61 cm) MINIMUM CLEARANCE TO ROOF/GROUND CONNECT TO DRYER VERTICAL EXHAUST INSTALLATION 2 WARNING To reduce the risk of fire and the accumulation of combustion gases, DO NOT exhaust dryer air into a window well, gas vent, chimney or enclosed, unventilated area, such as an attic, wall, ceiling, crawlspace under a building or concealed space of a building. W045 Figure 8 513005 © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT 13 Installation Duct Station Minimum Diameter of Collector Duct A 4 inches (10.2 cm) B 8 inches (20.3 cm) C 9 inches (22.9 cm) D 10 inches (25.4 cm) E 11 inches (27.9 cm) F 12 inches (30.5 cm) G 13 inches (32.6 cm) H 14 inches (35.6 cm) I 15 inches (38.1 cm) J 15 inches (38.1 cm) K 16 inches (40.6 cm) A Backdraft Damper, Part No. 58786 (obtain locally), should be installed in a 4 inch (10.2 cm) diameter VERTICAL duct system. This will prevent a backdraft when dryer is not in use, and will keep the exhaust air in balance within the central exhaust system. Step 3: (Gas Dryer Only) Connect Gas Supply Pipe WARNING To reduce the risk of gas leaks, fire orexplosion: • The dryer must be connected to the type of gas as shown on nameplate located in the door recess. • Use a new flexible stainless steel connector. • Use pipe joint compound insoluble in L.P. (Liquefied Petroleum) Gas, or Teflon tape, on all pipe threads. • Purge air and sediment from gas supply line before connecting it to the dryer. Before tightening the connection, purge remaining air from gas line to dryer untilodor of gas is detected. This step isrequired to prevent gas valve contamination. • Do not use an open flame to check for gas leaks. Use a non-corrosive leak detection fluid. • Any disassembly requiring the use oftools must be performed by a suitablyqualified service person. W316 1. Make certain your dryer is equipped for use with the type of gas in your laundry room. Dryer is equipped at the factory for Natural Gas with a 3/8 inch NPT gas connection. NOTE: The gas service to a gas dryer must conform with the local codes and ordinances, or in the absence of local codes and ordinances, with the latest edition of the National Fuel Gas Code ANSI Z223.1/NFPA 54 or the CAN/CSA-B149.1 Natural Gas and Propane Installation Code. Natural Gas, 1000 Btu/ft3 (37.3 MJ/m3) service must be supplied at minimum 5.0 inch water column pressure to maximum 10.5 inch water column pressure. For proper operation at altitudes above 2000 feet (610 m) the natural gas valve spud orifice size must be reduced to ensure complete combustion. Refer to Table 2. Natural Gas Altitude Adjustments Altitude Orifice Size Part Numberfeet m # inches mm 2,000 610 41 0.0960 2.44 503776 3,000 915 42 0.0935 2.37 503777 5,500 1,680 43 0.0890 2.26 503778 7,000 2,135 44 0.0860 2.18 58719 9,000 2,745 45 0.0820 2.08 503779 10,500 3,200 46 0.0810 2.06 503780 Table 2 2. Remove the shipping cap from the gas connection at the rear of the dryer. Make sure you do not damage the pipe threads when removing the cap. 3. Connect to gas supply pipe. 14 © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT 513005 Installation NOTE: When connecting to a gas line, an equipment shut-off valve must be installed within 6 feet (1.8 m) of the dryer. An 1/8 in. NPT pipe plug must be installed as shown for checking inlet pressure. Refer to Figure 9. D233I 1 New stainless steel flexible connector – (Use design CSA certified connector) Use only if allowed by local codes 2 1/8 in. NPT Pipe Plug 3 Equipment Shut Off Valve 4 Black Iron Pipe Shorter than 20 ft. (6.1 m) – Use 3/8 in. (9.5 mm) pipe. Longer than 20 ft. (6.1 m) – Use 1/2 in. (12.7 mm) pipe. 5 3/8 in. NPT Gas Connection Figure 9 1 3 2 4 5 4. Tighten all connections securely. Turn on gas and check all pipe connections (internal & external) for gas leaks with a non-corrosive leak detection fluid. NOTE: The dryer and its appliance main gas valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psi (3.45 kPa). Refer to Step 9 (Check Heat Source). L.P. (Liquefied Petroleum) Gas, 2500 Btu/ft3 (93.1 MJ/m3) service must be supplied at 10 ± 1.5 inch water column pressure. For proper operation at altitudes above 3500 feet (1070 m) the L.P. gas valve spud orifice size must be reduced to ensure complete combustion. Refer to Table 3. L.P. Altitude Adjustments Altitude Orifice Size Part No.feet m No. inches mm 3500 1070 54 0.0550 1.40 503785 7500 2290 55 0.0520 1.32 58755 11000 3355 56 0.0465 1.18 503786 Table 3 NOTE: DO NOT connect the dryer to L.P. Gas Service without converting the gas valve. Install L.P. Gas Conversion Kit 458P3, available at extra cost. Step 4: (Electric Dryer Only) Connect Electrical Plug Dryer requires 120/240 Volt or 120/208 Volt, 60 Hertz, 3 or 4 wire electrical...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien