
Tighten screws holding leveling bracket to unit on each side. 3 INSTALL DUCTWORK CAUTION -BEFORE CUTTING HOLE IN CABINET FOR DUCTWORK: Check for interference with floor joists, wall studs, electrical wiring or plumbing. 6" RD. ELBOW & DUCT- WORK 3-1/4" X 10" TO 6" RD. TRANSITION BLOWER COLLARSCREWS 1. Cut hole in cabinet as well as holes in wall or floor as necessary. 2. Mount the roof or wall cap and work back towards the cabinet, attaching all ductwork, elbows and transitions as previously pl