Login:
Stimmen - 3, Durchschnittliche Bewertung: 4.3 ( )

Anleitung Hans Grohe, modell Pharo Skyline 26017XX1

Hersteller: Hans Grohe
Dateigröße: 3.14 mb
Dateiname: prgh0184.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


120.. - 140.. F* Max. hot water temp 165..F* Max. flow rate: showerhead 2.5 gpm handshower 2.5 gpm neck spray 2.5 gpm bodysprays 0.72 gpm each Thermostatic temperature control The high temperature limit stop on the thermostatic mxing valve may be reset to comply with local plumbing codes. Protection against back siphonage provided by check valves. The check valves should be removed and inspected yearly. This panel may be used with an instantaneous water heater if the heater is at least 24 kW and the output is at least 3 gpm @ 30 psi pressure. However, only one panel function may be used at a time. *Please know and follow all applicable local plumbing codes when setting the temperature on the water heater. In Massachusetts, the water heater may be set no higher than 112..F. showerhead neck spray handshower bodysprays Installation Considerations For best results, Hansgrohe recommends that this unit be installed by a licensed, professional plumber. Please read over these instructions thoroughly before beginning installation. Make sure that you have all tools and supplies needed to complete the installation. A minimum of two people is required to install this panel. Do not attempt to install this panel alone as injury or damage to the panel may result. foot rest Suggested installation Minimum ceiling height -- 86 5/8” Package Contents Please check the package contents before beginning installation. If parts are missing or are not in good condition, please contact Hansgrohe Technical Service. Rough-in Install 1/2” NPT male nipples at the positions shown on the rough-in diagram for the hot and cold water supplies. The nipples should extend 5/8” outside the surface of the finished wall. Install the finished wall surface. Make the wall watertight. The showerpanel will hang on the finished wall. The measurements shown on page 5 are for the suggested installation shown on page 3, which is ideal for users of approximately 5’11” in height. The minimum ceiling height for this installation is 86 5/8”. The panel height may be increased if desired. The measurements shown on page 5 must be increased accordingly, including the minimum ceiling height. Thoroughly flush the hot and cold water supplies before installing the showerpanel. Installation Wrap the threads on the nipples with Teflon tape. Install the elbows. The elbow outlets should face downward. Drill the holes for the mounting screws with an 8 mm bit. Install the anchors. Install the screws. Install the nuts. There should be 9/16” between the rear of the nut and the surface of the wall. Seal the wall around the elbows with waterproof sealant. Failure to seal the wall can lead to possible water damage. Do not drill into water lines! Seal the wall around the anchors with waterproof sealant. Failure to seal the wall can lead to possible water damage. Hang the panel over the top screws only (1). With a partner holding the panel out of the way, Install the panel supply hoses on the elbows. Tighten the hose nuts. (2) Raise the panel (3). Push the bottom of the panel over the bottom screws (4). Lower the panel (5) so that the screws are in the narrow parts of the keyways. 1 3 5 2 4 Tighten the nuts using a 10 mm wrench. Place a black rubber hose washer in one end of the handshower hose. Install this end of the hose on the handshower outlet. Place the screen washer in the other end of the hose. Connect this end of the hose to the handshower. Place the handshower in the holder. Install the top cover. Reset the HIgh Temperature Limit Stop (Optional -- if required by local code) Remove the thermostatic mixer handle and safety set. Remove the clip and stop ring from the thermostatic mixer stem. Turn the water on to the handshower. Turn the stem until the output water is the desired maximum high temperature -- usually 110°F - 112°F. Turn the water off. Reinstall the stop ring so that the tooth is against the stop. Reinstall the clip. Justify and install the handle. Justify the handle Turn the water on to the handshower. Turn the thermostatic mixer handle until the output water is 100..F. Turn the water off. Remove the thermostatic mixer handle and safety set. Reinstall the safety set so that the notch is at the 12:00 position. Reinstall the handle with the safety stop override button at the 12:00 position. Tighten the screw fully, then loosen it 1/4 - 1/2 turn. Install the screw cover. Troubleshooting Problem Possible cause Solution Outputs both hot and cold water, but no mix Supply lines connected to the incorrect elbows Reconnect supply lines to correct elbows Insufficient water Filters inside supply elbows clogged Remove and clean filters Erratic water temperature Thermostatic mixer cartridge faulty Replace thermostat cartridge Function drips, won’t shut off completely Volume control cartridge faulty Replace volume control cartridge Hot water bleeds over into cold water supply in house or vice- versa Faulty check valve Remove and clean check valve, replace if necessary Limite...

Dieses Handbuch ist für folgende Modelle:
Plumbing - Pharo Skyline 26017XX1 (3.14 mb)
Plumbing - Pharo Skyline 26017XX1 (3.14 mb)
Plumbing - Pharo Skyline 26017XX1 (3.14 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien