Login:
Stimmen - 3, Durchschnittliche Bewertung: 3 ( )

Anleitung Epson, modell ELPMBP01

Hersteller: Epson
Dateigröße: 374.03 kb
Dateiname: mbp01_ig.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


It must be IIS installed by a qualified professional installer. Manufactured by Peerless Industries, Inc. 3215 W. North Ave. • Melrose Park, IL 60160 • (800) 865-2112 or (708) 865-8870 • Fax: (708) 865-2941 • NOTE: Read entire instruction sheet before you start installation and assembly. A WARNING • Do not begin to install your product until you have read and understood the instructions and warnings contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, call Peerless customer care at 1-800-729-0307. • This product should only be installed by someone of good mechanical aptitude, has experience with basic building construction, and fully understands these instructions. • Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware and components. • Never exceed the Maximum UL Load Capacity. • Always use an assistant or mechanical lifting equipment to safely lift and position equipment. • Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding power. See suggested torque values where applicable within these instructions. • This product is intended for indoor use only. Use of this product outdoors could lead to product failure and personal injury. • When installing or adjusting the ceiling mount, do not use adhesives, lubricants or oils to prevent the screws from loosening. If you use adhesives, lubricants, or oils to prevent the screws from loosening, the casing may crack and the projector may fall, causing serious injury and damage to the projector. Tools Needed for Assembly • stud finder ("edge to edge" stud finder is recommended) • phillips screwdriver • hammer • wire cutters • drill • 1/4" bit for concrete surface • 5/32" bit for wood studs Table of Contents Parts List....................................................... .........................................................................3 Installation to Suspended Ceiling................... .........................................................................4 Anchoring Ceiling Plate.................................. .........................................................................5 Warranty Information...................................... .........................................................................6 2 of 6 ISSUED: 02-13-08 SHEET #: 128-9029-2 07-10-08 Visit the Peerless Web Site at For Technical Support Contact Peerless Mounts at 1-800-729-0307 or 708-865-8870. Before you start check the parts list to insure all of the parts shown are included. NOTE: You may not need all hardware provided. Parts List Description Qty. Part # A ceiling tray 1 055-0492 B 1/4"-20 x 3/8" screws 4 520-2015 C 1/4"-20 nuts 4 530-9302 D allen wrench 1 560-9706 E escutcheon ring 1 1418-001A F turnbuckle 4 560-9620 G 12 gauge x 20' (6.1m) tie wire (not shown) 1 600-2008 H eye bolt 5 580-0006 I concrete anchor 5 580-0005 J flush mount tube 1 1446-014 K M5 x 10 mm penta pin screw 1 505-9010 L M5 x 1" penta pin driver 1 520-9249 NOTE: Some parts may appear slightly different than illustrated. C 3 of 6 ISSUED: 02-13-08 SHEET #: 128-9029-2 07-10-08 Visit the Peerless Web Site at For Technical Support Contact Peerless Mounts at 1-800-729-0307 or 708-865-8870. Installation to Suspended Ceiling Place ceiling tray (A) in grid above 24" x 24" or 24" x 48" false ceiling tile so that lip of ceiling tray (A) rests on ceiling runners as shown in figure 1. Place in desired position and tighten knurled knobs until ceiling tray (A) is securely attached to ceiling runners. IMPORTANT PRE-ASSEMBLY INFORMATION: Ceiling Tray (A) is designed to fit above a 24" (610 mm) x 24" (610 mm) section of a conventional suspended ceiling system. It may also be mounted above 24" x 48" conventional suspended ceiling. Ceiling runners (see DETAIL 2, page 5) should have a “T” cross section and a minimum height of 1.5" (38 mm). For certain installations it may be best to install ceiling anchors (step 5) before installing the ceiling tray (step 1). PI Slide collar mount plate to desired position. Using hole in collar mount plate, mark false ceiling tile where hole will be cut. Slide collar mount plate out of the way. Cut out 2.25" hole in false ceiling tile. Slide collar mount plate back into position and tighten all carriage bolts and nylock nuts using a 7/16" wrench. For Flush Mounting Applications OFrom the top down, thread flush mount tube (J) down through retaining collar in adjustable collar mount plate. Skip to step 3. For Extension Column Applications OFrom the bottom up, thread extension column (not included) up through retaining collar in adjustable collar mount plate. Align notch in extension column with hole in collar and fasten using M5 x 10 mm security screw (K) as shown in d...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien