Login:
Stimmen - 3, Durchschnittliche Bewertung: 3.3 ( )

Anleitung Invacare, modell IH6300ADH

Hersteller: Invacare
Dateigröße: 1.77 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


NOTE: If hydromassage use is anticipated, water level MUST be completely above whirlpool jets. NOTE: Before starting hydromassage, open the whirlpool inlet and whirlpool jets. Using Hydromassage CAUTION Before starting hydromassage, water level MUST be completely above whirlpool jets otherwise damage to the motor/pump will result. 1. Open the whirlpool inlet by pushing in on the plug in the whirlpool inlet fitting. 2. Open all whirlpool jets by performing one of the following: •Turn the center of the jet counter.clockwise to a full stop. •Pull the center of the jet out. 3. Add Invacare Defoamer to bath water. Refer to Defoamer bottle for directions. 4. Push whirlpool On/Off button to start whirlpool jets. 5. Adjust the whirlpool aerator for desired water agitation by rotating the knob. 6. After use, push whirlpool On/Off button to stop whirlpool jets. 7. Drain the tub. Part No 1096926 15 Supine Bath Tub SECTION 3—OPERATION Adjusting Tub Height - Model IH6300ADH ONLY WARNING DO NOT stand on tub frame. Frame is slippery when wet. Foot injury is possible when adjusting tub height. CAUTION DO NOT adjust height more than three cycles (up and down) within a ten minute period. Damage to the actuator may result. NOTE: The supine tub stops automatically when maximum height adjustment Up or Down is reached. Raising the Supine Tub 1. Press and hold tub control Up button. 2. Release tub control Up button when desired height is reached. Lowering the Supine Tub 1. Press and hold tub control Down button. 2. Release tub control Down button when desired height is reached. Supine Bath Tub 16 Part No 1096926 SECTION 4—INSTALLATION SECTION 4—INSTALLATION Preparing the Work Area NOTE: For this procedure, refer to FIGURE 4.1. 1. Determine location for the supine bath tub installation. NOTE: Follow recommended floor plan when installing tub. 2. Carefully remove the tub from carton. 3. Remove tub from shipping pallet by removing screws from leg mounting pads. 4. Model IH6300 ONLY .Remove the screws that secure the rear access panel to access the pump electrical connections (Detail “A” of FIGURE 4.1). 3 ft (914 mm) Wall 94 inches (2388 mm) 38 in. (965 mm) 142 inches (3606 mm) Screw (1 of 4) Access Panel Leg Mounting Pads DETAIL "A" 3 ft (914 mm) 3 ft (914 mm) 1 ft (304 mm) FIGURE 4.1 Preparing the Work Area Part No 1096926 17 Supine Bath Tub SECTION 4—INSTALLATION Securing the Tub NOTE: For this procedure, refer to FIGURE 4.1 on page 17 and FIGURE 4.2. 1. Set the tub in place. 2. Mark location of anchor holes, using pre.drilled holes in leg mounting pads as a template (Detail “A” of FIGURE 4.1). 3. Move tub away from mounting area. WARNING Protective eye wear MUST be worn when drilling to avoid possible eye injury. 4. Drill anchor holes in floor. Use a jack.drill with a carbide bit for concrete floors or a wood bit for wood floors. 5. Reposition the tub in mounting area, aligning the holes in the leg mounting pads with the holes drilled in STEP 4. WARNING DO NOT adjust height of legs more than 1 inch (25.4 mm); leg will disassemble from leg mounting pad and serious injury may occur. 6. Level the tub by adjusting the telescopic legs either up or down, using a wrench, to achieve the desired height. 7. Check to make sure tub is level by placing a level on the front and sides of the tub (Detail “A” of FIGURE 4.2). 8. Repeat STEPS 6 and 7 until tub is level. 9. Secure legs to floor using fasteners appropriate for the floor material and in keeping with local codes (Detail “B” of FIGURE 4.2). DETAIL “A” - LEVELING Level Leveling Side to Side Leveling End to End Level DETAIL “B” - SECURING TUB Leg 1-inch (25.4 mm) Maximum Adjustment Lag Bolt Lag Bolt Leg Mounting Pad Anchor Anchor FIGURE 4.2 Securing the Tub Supine Bath Tub 18 Part No 1096926 SECTION 4—INSTALLATION Electrical Hook-up WARNING Be certain ALL electrical work is performed by a qualified electrician and is in compliance with local electrical codes. Before installing and connecting the tub, make certain that the electric power source is SHUT OFF to avoid electrical shock. NOTE: For this procedure, refer to FIGURE 4.3 on page 20. NOTE: For installation details refer to on page 20. 1. Install the electrical hook.ups per FIGURE 4.3. Part No 1096926 19 Supine Bath Tub Air Switch Line Air Switch Line SECTION 4—INSTALLATION DETAIL “A” - ELECTRICAL HOOK UP LOCATION Electrical Hookup DETAIL “B” - ELECTRICAL HOOK UP DETAILS IH6300 Fixed Height IH6300ADH Adjustable Height Use 15 Amp GFCI Breaker Only Use 15 Amp Hospital Grade GFCI Receptacle Only 115 V Electrical DETAIL “C” - ELECTRICAL SCHEMATIC GREEN WHITE BLACK Wall Tub Wall Pump Motor DETAIL “E” - MOTOR END PLATE DETAIL “D” - MOTOR COVER Line (BLACK) Motor Cover Ground (GREEN) Neutral (WHITE) Ground Line Neutral FIGURE 4.3 Electrical Hook-up Supine Bath Tub 20 Part No 1096926 SECTION 4—INSTALLATION Electrical Installation DANGER The National Electric Code requires the use of a ground fault circuit interrupter on all therapeutic p...

Dieses Handbuch ist für folgende Modelle:
Andere Home Zubehör - IH6300 (1.77 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien