|
Anleitung Zusammenfassung
1-1 1.2 1.2 1.2.1 Leg/Caster Installation and Adjustment Installing the legs and leveling the cooker is done using a 1/2" wrench and a large pair of water pump pliers. The legs must be installed before connecting the cooker to the electric supply. The legs provide the necessary height to meet sanitation requirements. Attach the legs to the cooker by performing the following procedures: a. Place a blanket, piece of cardboard, or some other material on the floor behind the cooker. b. Place the cooker on its back. DO NOT pull on the element junction box. You can damage the elements by pulling on it. c. Attach each leg/caster to the cooker with four 1/4-20 x 5/8" hex head cap screws and lock washer/nut assemblies. These parts are supplied with the cooker. d. Mount the screws from the inside of the cooker with the lock washer and nut on the outside of the cooker as shown in the adjoining illustration. e. When all four legs/casters are secured, place the cooker in the upright position. Be careful not to put too much weight on individual legs/casters when standing the cooker upright. f. On fryers with casters, move the fryer to the desired location and lock the wheels using the locking devices on the sides of the casters. g. Adjust the height and level the cooker by adjusting the leveling devices on the legs with water pump pliers. 1.2.2 Basket Lift Access The basket lift mechanisms are installed at the factory and do not need adjustment. If it is necessary to gain access to the basket lift motors or linkage, the rear panel of the cooker must be removed. The motors do not require lubrication. 1-2 1.3 1.3 Although the cooker is easy to install and set up, it is STRONGLY recommended that this installation be done by qualified professionals. The professionals that install the new cooker will know the local building codes and ensure that the installation is safe. NOTICE Proper connection to electric, water, and drainage services is essential for safe, efficient, and trouble free operation of the Pasta Perfect cooker. 1.3.1 Installation Clearances The cooker needs clearance around it for proper operation. Adequate clearances allow for proper burner operation and servicing. The clearances shown below are for cooker installation in both combustible and noncombustible enclosures. Combustible Construction Back 6" Sides 6" Floor 6" Non-Combustible Construction 0" 0" 6" 1.3.2 Plumbing Connections The plumbing installation must be done by a licensed plumber and must comply with local and national codes. 1.3.2.1 Water Inlet Connections (Pasta Perfect units) - The rinsing/holding unit is equipped with a faucet type fill system. Make water connections to the faucets through the rear access panel of rear tank riser. NOTICE If cold water only is used to fill the cooker, it will require at least twenty (60) minutes to bring the water up to cooking temperature. 1.3.2.2 Drainage Connections - Both the cooking/warming section and the rinsing/holding section are equipped with drainage connections. The main drainage connection is located at the front bottom point of the cooker and is equipped with a 1-1/4" stainless steel valve. The overflow drain is located underneath the front deck of the cooker. The overflow hose is connected at the factory and is ready for installation. 1-3 1.3.3 1.3.3 WARNING The cooker must be electrically grounded in accordance with local codes. If local codes do not apply, follow the requirements of National Code ANSI/ NFPA 70-1990. The electrical service used by the cooker must comply with local codes. If there are no local codes that apply, refer to the National Electrical Code (NEC) to install the service. In Canada, refer to CSA Standard C22.1, Canadian Electrical Code, Parts 1 and 2, and/or local codes. The power requirements for the cooker are shown on the next page. The cooker is shipped with internal wiring configured to support the voltage and phase requirements ordered. The wiring configuration can be verified by comparing the schematic supplied with the cooker to the wiring arrangement in the cooker. Table 1-1 provides a list of cooker models and voltages available and includes the heating element part number for the specified voltage. Check the cooker data plate to ensure the cooker to be installed matches the power to be supplied to it. CAUTION Connecting the cooker to the wrong facility power supply may damage the cooker and void the warranty. Keep the POWER switch OFF until the cooker is ready for use. It is essential that the cooker be provided with a 2 wire, neutral and ground. 1-4 Table 1-1. Electrical Requirements For Pasta Perfect Cooker Models Table 1-1. Electrical Requirements For Pasta Perfect Cooker Models Voltage and Phase Arrangement Line Current PE14 with Basket Lift 220 VAC Single Phase (2 wires and a ground) 23.0 Amps PE14 with Basket Lift 240 VAC Single Phase (2 wires and a ground) 25.0 Amps PE14 without Basket Lift 200 VAC Single Phase (2 wires and a ground) 27.8 Amps PE14 without ...
Dieses Handbuch ist für folgende Modelle:Andere Küchengeräte - and RSE14 (247.41 kb)
Andere Küchengeräte - PE14 (247.41 kb)