Login:
Stimmen - 2, Durchschnittliche Bewertung: 4 ( )

Anleitung Cleveland Range, modell (T) MKDL-100-T (-CC)

Hersteller: Cleveland Range
Dateigröße: 2.11 mb
Dateiname: 7072d89f-4d78-41dd-875f-3538c8d1ed94.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


44110 Enodis Phone: (216) 481-4900 Fax: (216) 481-3782 Visit our web site at SE95018 Rev. 5 For your safety # DANGER Keep clear of pressure relief discharge. A Keep hands away from moving parts and pinch points. IMPORTANT Inspect unit daily for proper operation. Do not fill kettle above 'r— recommended level marked on outside of kettle. CAUTION Surfaces may be extremely hot! Use protective equipment. Do not lean on or place objects on kettle lip. éc h âi Wear protective equipment when discharging hot product. Stand clear of product discharge path when discharging hot product. A SERVICING Shut off power at main fuse disconnect prior to servicing. A rn Ensure kettle is at room temperature and pressure gauge is showing zero or less prior to removing any fittings. GAS APPLIANCES Do not attempt to operate this appliance during a power failure. A Keep appliance and area free and clear of combustibles. GENERAL INSTALLATION RECOMMENDED FLOOR Installation of the kettle must be accomplished by qualified installation personnel working to all applicable local and national codes. Improper installation of product could cause injury or damage. This unit is built to comply with applicable standards for manufacturers. Included among those approval agencies are: UL, NSF, ASME/Ntl.Bd., CSA, ETL, CE, and others. Many local codes exist, and it is the responsibility of the owner/installer to comply with these codes. INSPECTION Before uncrating, visually Inspect the unit for evidence of damage during shipping. If damage is noticed, do not unpack the unit, follow shipping damage instructions. SHIPPING DAMAGE INSTRUCTIONS If shipping damage to the unit is discovered or suspected, observe the following guidelines in preparing a shipping damage claim. 1. Write down a description of the damage or the reason for suspecting damage as soon as it is discovered. This will help in filling out the claim forms later. If possible, take a polaroid picture. 2. As soon as damage is discovered or suspected, notify the carrier that delivered the shipment. 3. Arrange for the carrier's representative to examine the damage. 4. Fill out all carrier claims forms and have the examining carrier sign and date each form. DRAIN LOCATION WALL C A B C (T) MKDL-40-T(-CC) 22 1/8" 51" 31" (T) MKDL-60-T(-CC) 22 1/8" 53" 31" (T) MKDL-80-T(-CC) 22 1/8" 58" 31" (T) MKDL-100-T(-CC) CO 21 61" 31" (T) MKDL-125-T CC. 21 3/4" 65" 31" (T) MKDL-150-T(-CC) 21 3/4" 68" 31" Recommended Floor Drain Location CLEARANCE REQUIREMENTS This unit must be installed in accordance with the clearances shown on the rating label which is adhered to the unit. FOR YOUR SAFETY. Keep the appliance area free and clear of combustible materials. MOVING UNIT 1. While still on skid, move unit as close to final installation position as possible. 2. Prepare unit for lifting as shown in diagram. 3. Lift gently with a forklift or jacks and remove skid. 4. Lower gently to ground and remove forklift and blocking. 5. If unit has to be re-positioned, slide gently. Do not twist or push one side of unit excessively and cause binding on trunnions. LEVELING Note: Instructions reflect a more complicated twin mixer kettle - process for single mixer kettles is the same. With straight-edge, line the backs of the consoles up with each other (dotted line A). Level and straight-edge backs of consoles (dotted line B). Adjustments are made by turning flanges on back feet only. Level consoles individually from front to back (dotted lines C). Adjustments are made by turning flanges on front feet only. Re-check that the back is level (dotted line B) and then the front (dotted line D). Adjust if necessary. 5. Check that mixer bridge is level and guide pins lock smoothly without binding. If not repeat steps 1 through 4. Guide Pins NOTE: See Operating Instructions before operating unit. 6. Make electrical connections (see electrical service connections) and test mixer bridge as follows: ^ A/ Raise mixer bridge. ^ B/ Swing bridge out over centre console. ^ C/ Swing bridge to the left as far as possible. ^ D/ Lower bridge. ^ E/ Bridge pins should enter pin hole on kettle perfectly, If not return to step 1 and repeat leveling steps. ^ F/ Raise bridge and swing to far right (for twin mixers only). ^ G/ Repeat steps D and E (for twin mixers only). 7. Once positioned and leveled, permanently secure the kettle's flanged feet to the floor using 5/16 inch stainless steel lag bolts and floor anchors (supplied by the installer). Secure each of the flanged feet with one bolt in each hole. 8. Connect piping as described in the "PIPING CONNECTION" section. ELECTRICAL SERVICE CONNECTIONS Install in accordance with local codes and/or the National Electric Code ANSI/NFPA No 70-1981 (USA) or the Canadian Electric Code CSA Standard C22.1 (Canada). A separate fused disconnect switch must be supplied and installed. The kettle must be electr...

Dieses Handbuch ist für folgende Modelle:
Andere Küchengeräte - (T) MKDL-125-T (-CC) (2.11 mb)
Andere Küchengeräte - (T) MKDL-150-T (-CC) (2.11 mb)
Andere Küchengeräte - (T) MKDL-40-T (-CC) (2.11 mb)
Andere Küchengeräte - (T) MKDL-60-T (-CC) (2.11 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien