Login:
Stimmen - 2, Durchschnittliche Bewertung: 3.5 ( )

Anleitung Bloomfield, modell 2280

Hersteller: Bloomfield
Dateigröße: 1.62 mb
Dateiname: d2cdbc54-a0d6-42a2-8034-4516cf345674.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


A water shut-off valve should be installed on the incoming water line in a convenient location (Use a low restriction type valve, such as a 1/4-turn ball valve, to avoid loss of water flow thru the valve. 5. NSF requires that the brewer be able to be moved for cleaning underneath. A flex line or loops of copper tubing will satisfy this requirement. 6. In some areas, local codes require a backflow preventer (check valve) to be installed on the inlet water line. If a back flow preventer is used, you must install a water hammer arrester in the incoming line, between the backflow preventer and the brewer inlet, as far away from the brewer as space will allow. This will relieve the excessive back pressures that can cause faucet leaks and solenoid malfunctions. ELECTRICIAN’S INSTALLATION INSTRUCTIONS REFER TO ELECTRICAL SPECIFICATIONS -Page 1 Check the nameplate to determine correct electrical service required for the Brewer to be installed. NOTE: Models 2212 & 2272 require a 115 - 125 V 15A circuit (50/60 Hz, 2 wire plus earth ground, with NEMA 5-15R or 5-20R Receptacle) Model 2216 requires a 120/240V 20A circuit (50/60 Hz, 2 hot legs / 1 neutral leg, plus earth ground). Circuit must be capable of 3500 Watts. SHUT-OFF VALVE (PROVIDED BY PLUMBER) COPPER LOOPS OR FLEX LINES (PROVIDED BY PLUMBER) WATER SUPPLY FLOW SOLENOID STRAINER WASHER NOTE: This equipment must be installed to comply with applicable federal, state and local codes and ordinances. WARNING ELECTRIC SHOCK HAZARD: Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or serious injury. IMPORTANT: Do not attempt to override the automatic tank fill feature which requires that the tank must be full of water to start operations. Any attempt to override this feature will void the warranty. IMPORTANT: Before connecting to electricity, make sure the E-Max™ LX has been properly connected to the water supply. IMPORTANT: Supply power must match nameplate for voltage and phase. Connecting to the wrong voltage will damage the brewer or result in decreased performance. Such damage is not covered by warranty. AGENCY APPROVAL INFORMATION This brewer is and listed under UL File E9253 This brewer meets Standard 4 when installed, operated and maintained in accordance with the instructions in this manual. E9253 E9253 STD 4 OPERATION OPERATION OPERATING INSTRUCTIONS To over-ride the Brew Wait mode, press and hold the BREW key for 3 seconds when the brewer is in Brew Wait mode (i.e. when brew light is flashing). The brew will proceed immediately regardless of water temperature. This feature should only be used when testing water volume, otherwise the brew will proceed with the water below the precise brew temperature. Note: the following safety features have been incorporated to prevent multiple unattended brews: The brew key is inoperative during a brew cycle. This minimizes the possibility of double brewing. When the “Brew” light is on or flashing, repeated pressing of the BREW switch will be ignored, (there will be a beep each time it is pressed). A Brew will only be activated when the “Brew” light is off. 1. Energizing the Brewer: When electricity has been connected to the unit, there will be a momentary flash of the power light. Turn the brewer on by pressing the POWER key. The brewer will start to fill the tank. With the proper water supply the tank should be filled in about 2. minutes. Once filled, the heating element will come on until the proper tank temperature has been reached, (which will take about 20 minutes on 120-Volt models or about 12 minutes on 120/240 Volt models). 2. Brewing (Precise Temperature for Brewing™ — PTB™): In the regular operating mode, the E-Max™ LX maintains the tank temperature within +/- 1.F of the brew temperature. Normally this will mean that a brew will be started as soon as the BREW key is pressed. However, there may be a slight delay if the BREW key is pressed immediately after a brew has been completed (notably on 120-volt models). If the tank temperature is below the brew temperature, the brew will be delayed, going into the “Brew Wait” mode, with the brew light flashing. As soon as the correct temperature is reached the brew will commence with the brew light on continuously during the brew. When the brew begins the main warming station will be turned on automatically (if it is not already on). During the brew cycle, if the BREW key is pressed, it will be ignored. Only when the brew is complete can another brew be started. 3. Brew Cancel: To cancel a brew in progress, press the CANCEL KEY: two beeps will sound and the “Brew” light will go out. Water flowing to the brew chamber will be stopped immediately, but if there is already water in the brew chamber, it will take a few moments before this drips through as coffee. 4. Normal Operation (Non Brewing): When the unit is not brewing, the E-Max™ LX maintains the water temperatur...

Dieses Handbuch ist für folgende Modelle:
Andere Küchengeräte - 2282 (1.62 mb)
Andere Küchengeräte - 2286EX (1.62 mb)
Andere Küchengeräte - 2288EX (1.62 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien