Login:
Stimmen - 4, Durchschnittliche Bewertung: 4.5 ( )

Anleitung Allied Air Enterprises, modell 15)

Hersteller: Allied Air Enterprises
Dateigröße: 619.36 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Dieses Gerät hat auch andere Anweisungen:
Kühlen - 15) (443.3 kb)en

Anleitung Zusammenfassung


Turn on clothes dryers and any appliance not connected to the common venting system. Turn on exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers. 4. Following the lighting instructions, place the unit being inspected in operation. Adjust the thermostat so the appliance will operate continuously. 5. Test for spillage at the draft control relief opening after 5 minutes of main burner operation. Use the flame of a match or candle. 6. Follow the preceding steps for each appliance connected to the common venting system. 7. After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers, and any other fuel burning appliance to their previous condition of use. 8. If improper venting is observed during any of the above tests, the common venting system must be corrected. See National Fuel Gas Code, ANSI Z223.1 (latest edition) or CAN/CGA B149.1 & .2 Canadian Installation Codes to correct improper operation of common venting system. Heater Kit Accessory Installation Figure 7 Heater Kit Heater Blockoff Heater Compartment Access Panel OPERATION Sequence of Operation Cooling When the thermostat is in the cooling mode, the O circuit is powered which energizes the reversing valve. Upon cooling demand, the thermostat closes circuit R and Y. Closing R and Y closes the unit contactor, starting the compressor and outdoor fan. The thermostat automatically closes R to G circuit which also brings on the indoor blower at the same time. Upon satisfying cooling demand, the thermostat will open the above circuits and open the main contactor, stopping the compressor and outdoor fan. If the unit is equipped with a delay timer, the blower will continue to operate for 90 seconds which improves system efficiency. Heating Upon heating demand, the thermostat closes circuit R to Y, which closes the unit contactor, starting the compressor and outdoor fan. The reversing valve is not energized in the heating mode. The thermostat again automatically brings on the indoor fan at the same time. Upon satisfying heating demand, the thermostat opens above circuits and stops unit operation. Defrost System The defrost system includes two components: the defrost thermostat and the defrost control. Defrost Thermostat The defrost thermostat is located on the liquid line between the check/expansion valve and the distributor. When the defrost thermostat senses 42°F or cooler, the thermostat contacts close and send a signal to the defrost control board to start the defrost timing. It also terminates defrost when the liquid line warms up to 70°F. Defrost Control The defrost control board includes the combined functions of time/temperature defrost control, defrost relay, diagnostic LEDs and terminal strip for field wiring connections (see Figure 8). The control provides automatic switching from normal heating operation to defrost mode and back. During the compressor cycle (call for defrost), the control accumulates compressor run time at 30, 60, 90 minute field-adjustable intervals. If the defrost thermostat is closed when the selected compressor run time interval ends, the defrost relay is energized and the defrost begins. Defrost Control Timing Pins Each timing pin selection provides a different accumulated compressor run time period during one thermostat run cycle. This time period must occur before a defrost cycle is initiated. The defrost interval can be adjusted to 30 (T1), 60 (T2), or 90 (T3) minutes. The defrost timing jumper is factory installed to provide a 60-minute defrost interval. If the timing selector Defrost Control Board Defrost Interval Timing Pins Diagnostic LEDs 24V TerminalStrip Connections High Pressure Switch (optional) Defrost Thermostat Reversing Valve Compressor Delay Pins Test Pins K1 Relay K2 Relay FAN DS1 L 24V P2 P5 O-OUT DF Y1-OUT HI-PS U1 U2 DS2 K3 Relay P6 TST PS DF C R O Y1 C5 LO-PS C2 P1 30 60 90 TEST W1 C L R Y1 O Low Pressure Switch (optional) Figure 8 506248-01 Issue 0902 Page 7 of 14 jumper is not in place, the control defaults to a 90-minute defrost interval. The maximum defrost period is 14 minutes and cannot be adjusted. A test option is provided for troubleshooting. The test mode may be started any time the unit is in the heating mode and the defrost thermostat is closed or jumpered. If the jumper is in the TEST position at power up, the control will ignore the test pins. When the jumper is placed across the TEST pins for 2 seconds, the control will enter the defrost mode. If the jumper is removed before an additional 5-second period has elapsed (7 seconds total), the unit will remain in defrost mode until the defrost thermostat opens or 14 minutes have passed. If the jumper is not removed until after the additional 5-second period has elapsed, the defrost will terminate and the te...

Dieses Handbuch ist für folgende Modelle:
Pumps - (2 (619.36 kb)
Pumps - 4)PHP(13 (619.36 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien