Login:
Stimmen - 1, Durchschnittliche Bewertung: 3 ( )

Anleitung American Panel, modell Blast Chiller AP40BC250-12

Hersteller: American Panel
Dateigröße: 2.17 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


The operator needs only to select the recipe number of the food to be controlled by each probe (up to 150 recipes can be programmed), then insert each probe into its food. When all the probes have reached their programmed temperatures, the unit will automatically switch into holding mode. 2. MANUAL MODE, in which operating time is manually set by the operator for a particular meal. Air temperature is controlled by the air probes. The food probes, if they have been inserted into the food, will provide temperature readouts only. Manual mode will also switch automatically into the holding mode at the end of the cycle. 3. DEFROST CYCLE, used to defrost the unit if there has been a build-up of ice. 4. UV CYCLE (OPTIONAL), for sanitizing the unit. 5. PRINTER (OPTIONAL), which may be programmed to print or not print during the chilling cycles. If the printer is selected, printing starts automatically at the beginning of each chill cycle. All the operating parameters (starts and stops of the chilling cycle, dates and times, air and food temperatures) are printed, and then repeated in accordance with the programmed printer cycle time. If the printer is not selected, the readings will be stored for printing at a later time (up to 250 events, corresponding to one week of normal usage, can be stored). Refer to the instructions in this manual, as well as in the printer’s manual, for more details. NOTE: Be certain to complete and return the printer’s warranty card. Also retain the ribbon & paper order form for use when needed. B. Installation American Panel Corporation equipment has been shipped in a package designed to sufficiently protect from damage under normal shipping circumstances. Upon receiving the shipment, carefully inspect the package for visible damage and check the number of packages against the Bill of Lading. Notify the carrier immediately of any shortage or damage to your shipment. Claims must be filed promptly with the carrier. After receipt of shipment, carefully and safely remove the unit from the package. Check the containing of the package against the packing list. Under no circumstances may a damaged piece of equipment be returned to American Panel Corporation without first obtaining written permission. To assure proper installation carefully read and comply with the following instructions. B.1. Initial Cabinet Preparation Note: When following the installation instructions consider that the fan assembly frame will be inserted into door hinge side of cabinet and the coil assembly frame will be inserted in the door latch side of cabinet. Check if the cabinet was provided with penetrations to accommodate the refrigeration pipes (2-1/2” hole) and the drainpipe (1-1/2” hole). If the cabinet is provided with penetrations proceed with the installation of the coil assembly frame. Otherwise follow the next steps: 1. Measure location of drainpipe on drain pan (see PHOTO #1) where it will extend behind the Coil Assembly Frame (see PHOTO #3, page 9). Properly cut a corresponding 1 .” hole in the rear corner panel to receive the drainpipe (see DRAWING #1). PHOTO # 1 DRAWING # 1 2. Measure and locate the refrigeration lines on the coil assembly frame and properly drill corresponding 2 .” holes in the ceiling side or rear panels to accommodate 1 1/8” and .” pipes. 3. Install the air deflectors on the top corners (above the fan and coil frames) using the provided self-taping stainless steel screws. B.2. Single Unit Installation AP40BC250-12 And BCCP-1 B.2.1. Install Coil Assembly Frame DRAWING # 2 1. Insert the coil assembly frame into the door latch side of the box with the filter facing the interior of the box (see DRAWING # 2). Push the assembly tight to the side wall leaving .” space at the front and rear panels. Note the three holes on the stainless steel angle frame (at the top of the horizontal cross brace on the vertical surface at the back of the frame). Drill 1/8” pilot holes. DRAWING # 3 2. Secure the frame to the back of the box with self-tapping 8/32” stainless steel screws (see DRAWING # 3). 3. Insert the drain pan (see PHOTO #1, page 4) with the drain pipe through the drain hole previously drilled. B.2.2. Install Fan Assembly Frame 1. Insert the fan assembly frame into the door hinge side of the box with the fans facing the interior of the box (see DRAWING # 4). Push the assembly tight to the side wall leaving .” space at the front and rear panels. Note the three holes on the stainless steel angle frame (at the top of the horizontal cross brace on the vertical surface at the back of the frame). Drill 1/8” pilot holes into the back panel of the box. 2. Secure the frame to the back of the box with self-tapping 8/32” stainless steel screws (see DRAWING # 3, page 5) DRAWING # 4 PHOTO #2 3. Seal the spaces between frames and side box panels by tightening the butterfly .” nuts on the provided seal brackets (see PHOTO #3 page 8). 4. Make the electrical connections (page 8) and install the refrigeration uni...

Dieses Handbuch ist für folgende Modelle:
Gefrieren - Blast Chiller BCCP-1 (2.17 mb)
Gefrieren - Blast Chiller AP40BC250-2-12 (2.17 mb)
Gefrieren - Blast Chiller BCCP-2 (2.17 mb)
Gefrieren - Blast Chiller BCIP (2.17 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien