|
Anleitung Zusammenfassung
Seal around the Vinyl Siding Standoff on al! four sides. Diagram 5. The arrow on the vent cap should be pointing up. Insure that the 1-1/4" clearances to combustible materials are maintained. See diagram 5. Note: if installing termination on a siding covered wall, a vinyi siding standoff or furring strips must be used to ensure that the termination is not recessed into the siding. The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings. 5) Before connecting the horizontal run of vent pipe to the vent termination, slide the black decorative wall thimble cover over the vent pipe, then slide the Wall Thimble (Part # 942) over the vent pipe. 6) Slide the appliance and vent assembly towards the wail carefully inserting the vent pipe into the vent cap assembly. It is important that the vent pipe extends into the vent cap a sufficient distance so as to result in a minimum pipe overlap of 1-1/4 inches. Secure the connection between the vent pipe and the vent cap by attaching the two sheet metal strips extending from the vent cap assembly into the outer wall of the vent pipe. Use the two sheet metal screws provided to connect the strips to the pipe. Bend any remaining portion of the sheet metal strip back towards the vent cap, so it will be concealed by the decorative wall thimble cover. See diagram 6. Regency U29-1/U45-2 ULTIMATE Direct Vent Freestanding Gas Stove 21 INSTALLATION Galvanized pipe and elbows may be utilized in the attic as well as above the roofline. The galvanized finish is desirable above the roofline due to its higher corrosion resistance. Continue to add pipe sections through the flashing until the height of the vent cap meets the minimum height requirements specified in diagram 12 or local codes. Note that for steep roof pitches, the vertical height must be increased. A poor draft, or down drafting can result from high wind conditions near big trees or adjoining roof lines, in these cases, increasing the vent height may solve the problem. Diagram 12 Roof Pitch Minimum Vent Height Feet Meters flat to 7/12 2 0.61 over 7/12 to 8/12 2 0.61 over 8/12 to 9/12 2 0,61 over 9/12 to 10/12 2.5 0.76 over 10/12 to 11/12 3.25 0.99 over 11/12 to 12/12 4 1.22 over 12/12 to 14/12 5 1.52 over 14/12 to 16/12 6 1.83 over 16/12 to 18/12 7 2.13 over 18/12 to 20/12 7.5 2.29 over 20/12 to 21/12 8 2.44 nails Ceiling Firestop 7) Ensure vent is vertical and secure the base of the flashing to the roof with roofing rails, slide storm collar over the pipe section and seal with a mastic. f 8) Install the verticalMin.H termination cap by twist locking it. Notes: a) For multistorey vertical installations, a Ceiling Fire stop (Part # 963) is required at the second floor, and any subsequent floor. Diagram 13. The opening should be b) framed to 10" x 10” inside dimensions, in the same manner as shown in diagram 10. Any occupied areas above the first floor, including closets and storage spaces, through which the vertical vent passes, must be enclosed. Offset Chart Offset Pipe Length (L) Heig ht inches mm inches mm inches mm 4Va 121 0 0 13 1/4 337 9 229 6 152 17 1/2 445 11 1/4 286 9 229 191/2 495 13 1/4 337 12 305 21 3/4 552 21 3/4 552 24 610 30 1/4 768 30 1/4 768 36 914 39 991 38 965 48 1219 47 1194 OFFSET *«- Diagram 13 CATHEDRAL CEILINGS Round Support (RDS) & Square Support (SQS) If your home has a cathedral ceiling (no attic space between the ceiling and the roof), install the chimney and support as follows. Situate the chimney in a convenient location as near as possible to the appliance outlet, Cut and frame a hole in the roof for the support. The sides of this hole must be vertical with 1 1/4" clearance. Place the support in the opening. Lower it to the correct height as determined by the table and diagram below. Using a level, make sure the support is vertical. If the support extends above the roof, cut it flush with the top of Regency U29-1/U45-2 ULTIMATE Direct Vent Freestanding Gas Stove 23 INSTALLATION System Data - U45-2 For 0 to 2000 feet altitude Burner Inlet Orifice Sizes: Natural Gas Propane Burner #32 #50 *Above 2000 ft, see National Fuel Code Orifice Chart. Max. Input Rating - Natural Gas 38,000 Btu/h - Propane 38,000 Btu/h Min. Input Rating - Natural Gas 20,000 Btu/h - Propane 20,000 Btu/h Output Capacity with blower Off* Natural Gas 28,500 Btu/h Propane 29,260 Btu/h Output Capacity with blower On* Natural Gas 29,260 Btu/h Propane 30,020 Btu/h *See page 14 for manufactured home chart. Supply Pressure Natural Gas min. 5.0" w.c. Propane min. 12.0" w.c. Manifold Pressure Natural Gas 3.8" +/- 0.2" w.c. Propane 11 " +/- 0.2H w.c. System Data - HIGH ELEVATION For 2,000 > 4,500 feet altitude Burner Inlet Orifice Sizes: Natural Gas Burner #33 Max. Input Rating - Natural Gas 36,100 Btu/h Min. Input Rating - Natural Gas 19,000 Btu/h Output Capacity with blower Off...
Dieses Handbuch ist für folgende Modelle:Kamine - U29-LP1 (1.95 mb)