|
Anleitung Zusammenfassung
• Provide adequate accessibility clearances for servicing and proper operation. • Provide adequate clearances around air openings into the combustion chamber.. • This appliance has a built-in draft hood, so no additional external draft hood is required. • If installing in a factory built fireplace, you may remove the damper, glass doors, screen, screen holder, baffles, and smoke shelf provided that what you take out can be reinstalled. Also you must retain the pieces you have removed, in case someone would like to use the listed solid fuel burning factory built fireplace at a later date. A GAS APPLIANCE MUST NOT BE CONNECTED TO A CHIMNEY FLUE SERVING A SEPARATE SOLID-FUEL BURNING APPLIANCE. CLEARANCES Clearance distances between the insert and any combustible material must be maintained while installing your appliance: Clearance to NON combustible hearth is: 0 Clearance to combustible mantel: 38” (965 mm) Clearance to combustible side wall: 10” (254 mm) Minimum hearth extension: 16” (406 mm) INSTALLATION OF THE UNIT • Move the ELATION to the desired position. Mark the location for the gas inlet pipe and the location where the vent is in relation to the fireplace flue. Remove the appliance. • Route a 3/8" minimum NPT iron pipe gas line to the desired location. • Install a shutoff valve to the gas line. Tighten securely using a pipe joint compound. NOTE: The valve includes two .” tappings for test gauge connection. You may need, however, to install a 1/8” plugged tapping between the gas line and the connection point to the insert, if it is required by local codes. • If you wish to make a direct electrical connection to the blower without using the six-foot cord supplied, route a 120 volt, 60 Hz electrical power supply line to the same location. Remove the power cord and connect the 120V line as per the following procedure : • Unscrew the speed control unit and pull a few inches away from the junction box • Unscrew the two marr connectors attached to the cord (P) and the cord ground • Remove the cord and route the supply line through the same holes • Make the electrical connection with the same wires the cord was attached to • Screw the ground wire to the junction box (G) • Screw the speed control unit back in place PPGCONNECT THE POWER LINE TO THE SAME WIRES THE CORD WAS CONNECTED TO (P) SPEED CONTROLJUNCTION BOX If you prefer to use the six-foot cord supplied, just connect it to a 120V outlet. • Move the ELATION to the desired position and shim the unit to a level position. • Connect gas line to the insert at the right side using listed connectors • Check the gas line piping for leaks. Use a soap and water solution. WARNING: DO NOT USE OPEN FLAME TO CHECK LEAKS. GLASS FRONT REMOVAL, CLEANING AND INSTALLATION Removal: • Let the insert cool down for at least one hour. • Open the top and bottom louvres to reveal the retaining brackets. • Remove the two (2) screws holding the top bracket and remove the bracket still holding the glass in place. • Lift out glass. (Do not let glass fall forward!) CAUTION : Do not operate your insert without a glass front or with a broken glass. Cleaning: • Only clean the glass when cold. • Clean with liquid type cleaners or soap and water; do not use abrasive cleaners, which can scratch the glass. Installation: • Place the glass front assembly back in position. Align the top bracket with the holes for the screws. • Install the two (2) screws. BURNER REMOVAL AND INSTALLATION REMOVAL: • Remove the glass front assembly as shown on page 13. • Remove the logs. • Unscrew the line leading to the main orifice under burner (below floor of firebox) and then unscrew the orifice fitting from the burner. • Lift out burner. WARNING: NEVER OPERATE THE FIREPLACE INSERT WITHOUT HAVING THE ORIFICE PROPERLY SCREWED TO THE VENTURI TUBE. THIS COULD RESULT IN SERIOUS DAMAGE TO THE GAS INSERT AND IS A SERIOUS RISK OF FIRE . NOTE: For an optimal performance the air shutter opening should be 1/8” opening for natural gas and 1/4” to 5/16” for propane. EMBER KIT INSTALLATION Three small plastic bags are supplied with your unit. One of the bags contains vermiculite to simulate ashes in the fire box, another contains lava rock to simulate coals and the last one is filled with rock wool fiber which, when glowing red, resembles hot embers. 1. Remove log grate from the insert. 2. Place some vermiculite and some lava rocks on the burner and in front of the burner. Never put too much of these materials near the burner holes. The gas must pass through the burner easily. CAUTION: Blocking gas ports with vermiculite or lava rock will result in poor light-up performance and delayed ignition. 3. Place five or six pieces of rock wool fiber approximately 1" large on top of the front gas ports. Place two or three pieces over each of the back gas ports. Make sure not to put too many pieces as this could result in an altered flame pattern and possible carbon deposition. LOG INSTALLATION 1. Place rear log in rear log bracket ...
Dieses Handbuch ist für folgende Modelle:Kamine - Nova 820 (204.18 kb)