Login:
Stimmen - 2, Durchschnittliche Bewertung: 4.5 ( )

Anleitung Thomas & Betts, modell RZ405

Hersteller: Thomas & Betts
Dateigröße: 1.27 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


,)$ + $71% . . ,)$ + $71% . and Double- Run and Single- Wall Wall Terminal 8B85< . 1. B B. . . ,1 . % ** . ,1 . %3 '* . %3 '* . :4 ' 10. % ** . 10. *% -. :4 . *% -. 7&!=,. %% 33. 7&!=,%> . %% 33. %> 1 . 1. . %0. %3'* . . * 5) Horizontal Vent Terminal Clearances 3'* % . Structure Minimum Clearances for Vent Termination Location (all directions unless specified) Forced air inlet within 10 ft (3.1m) 3 ft (0.9m) above Combustion air inlet of another applian6 ft (1.8m) ce Door, window, or gravity air inlet (any building opening) 4 ft (1.2m) horizontally 4 ft (1.2m) below 1 ft (30cm) above Electric meter, gas meter* and relief equipment 4 ft (1.2m) horizontally *Do not terminate the vent directly above a gas meter or service regulator. Gas regulator* 3 ft (0.9m) Adjoining building or parapet 6 ft (1.8m) Adjacent public walkways 7 ft (2.1m) above Grade (ground level) 7 ft (2.1m) above A vent cap is required. Maintain a clearance of 12" from the wall to the vent terminal cap for stability under wind conditions. Products of combustion can cause discoloration of some building finishes and deterioration of masonry materials. Applying a clear silicone sealant that is normally used to protect concrete driveways can protect masonry materials. If discoloration is an esthetic problem, relocate the vent or install a vertical vent. Figure 9 - Vertical Vent Terminals Single-Wall Vent B ,)$/ -3%%% *%3 % 5 31% + %+ ' % 54C,1 %3 '* 10*% -%% 33 *%0 %3'* * 5) 3'* % Single-Wall Vent Run and Double- Wall Terminal ,)$ B,1 %3 '* 10*% / -3%%% *%3 % 5 31% / -3 + %+ ' % 54C Run and Single- Wall Terminal -%. 33 . Mfg No. 164771, Page 11 8. Duct Connections and Ductwork Both inlet air ductwork and supply air discharge ductwork are required unless the heater is equipped with an optional inlet base and/or an optional discharge plenum. IMPORTANT NOTE: If a Model ACU cased cooling coil is part of the installation, it must be installed before attaching discharge ductwork. Installation of a filter cabinet is recommended when a cooling coil is installed. Discharge Duct Connection -The discharge duct connects to the top of the heater or to the outlet of the optional cooling coil cabinet. See Figures 10 and 11. Connect the ductwork plenum to the duct flange as illustrated in Figure 11. 1) The duct connection on the top of the heater has a 90° flange. 2) The duct may either have no flange or a 90° flange. 3) Position ductwork around the outside of the heater flange. 4) If the ductwork has a flange, drill holes vertically through duct flange into the top of the heater and secure with sheetmetal screws. If the ductwork does not have a flange, drill holes horizontally through the ductwork and the heater flange; secure with sheetmetal screws. 3,D ./7! " '8:?4':?5'8:?5,$ Figure 11 - Connecting Discharge Ductwork Figure 10 - Top View showing Discharge Duct Connection Dimensions (inches) Size 150, 200 250, 300 350, 400 A 36" (914mm) 48" (1219mm) 48" (1219mm) B 21" (533mm) 21" (533mm) 34" (864mm) Heater Removable Access Panel in the Ductwork 6" x 10" (152mm x 254mm) minimum Attach to Duct Flange Inlet Air Ductwork -The location of the inlet air duct connection depends on the installation. Corner indicators for the opening are provided on the right side, the left side, and the rear of the heater. (See Dimensions in Figure 1, page 3.) Determine where the inlet air opening(s) should be and cut out using tin snips or aviation shears. CAUTION: Form 405, Page 12 The cut edges of the metal will be sharp. If installing an optional filter or filter/mixing cabinet shipped with the heater, attach the cabinet at the "cutout" opening (See Optional Accessories, Paragraph 18 or 19). Depending on the cabinet and how it is installed, the inlet opening may be horizontal or vertical. Attach the ductwork to the heater or to the inlet cabinet. Figure 12 - Duct Opening for Connecting the Inlet Air Duct to the field-installed Filter or Mixing Cabinet Depending on the heater size and whether the cabinet is on the side or the rear, the inlet opening may be either vertical (on the top of the filter cabinet) or horizontal (on the side of the filter cabinet.) 367. 5E55'+ 3'8?8. 5E855' 3'8885E855'+ 3'4':?485E455'+ 3F4':?44567 Requirements and Suggestions for Connecting and Installing Ducts • Type of Ductwork - The type of duct installation to be used depends in part on the type of construction of the building. • Ductwork Material - Rectangular duct should be constructed of not lighter than No. 26 U.S. gauge galvanized iron or No. 24 B & S gauge aluminum. • Ductwork Structure - All duct sections 24 inches or wider, and over 48 inches in length, should be cross broken on top and bottom and should have standing seams or angle-iron braces. Joints should be S and drive strip, or locked. • Through Masonry Walls - No warm air duct...

Dieses Handbuch ist für folgende Modelle:
elektrische Heizungen - RGM 405 (1.27 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien