|
Anleitung Zusammenfassung
3. Turn burner upside down and remove air shutter. Discard air shutter. (Fig. 18) Air Shutter (Remove and Discard) Bottom of Burner Pan ST667 Fig. 18 Remove air shutter and discard. 4. Replace burner. Slide the burner in at an angle with left side lower than the right side. Slide the left side onto the injectors, making sure the burner leg remains at a 90° angle to the base. (Fig. 19) Lower the right hand side down in to place. Make sure the burner is as far left as possible and the injector shoulders are inside the burner. 90° Left Burner Leg Injector Orifices ST353a Fig. 19 Be sure injector orifices remain at 90° to the base. 5. Replace left and right log bracket assembly, tighten rear log bracket, and replace logs. 6. Latches provided in catalyst kit must be installed on top of firebox. Use two phillips screws to secure in place. (Fig. 20) Phillips Screws Phillips Screws ST671 Fig. 20 Attach glass latches. Catalyst Location 7. Slide catalyst between top plate and firebox. Allow catalyst to “fall” into hole on top of firebox. Secure with two screws as shown in Figure 21. ST201 Fig. 21 Install catalytic combustor. 20004555 Radiance Vent-Free Gas Heater 8. Install glass frame assembly by resting the bottom edge of the frame on support brackets below the front opening of the firebox. Swing the top edge of the assembly toward the firebox, and center it. Fasten by closing the latches over the top left and right edges of the frame. (Fig. 22) ST672 Fig. 22 Set glass frame in place and secure latches. Connect the Gas Supply Line Check the Rating Plate attached by a steel cable to the firebox, to confirm that you have the appropriate firebox for the type of fuel to be used. This appliance should only be connected by a qualified gas technician. Test to confirm manifold pressures as specified below. The Radiance Heater and its individual shutoff valve must be disconnected from the gas supply piping during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). The Radiance Heater must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig. There must be a gas shutoff between the stove and the supply. In order to connect Natural Gas, use a fitting with 3/8” NPT nipple on the valve side and 1/2” natural gas supply line with an input of 35,000 BTUs at a manifold pressure of 3.5” and minimum inlet supply for adjustment of 5.5” w.c. In order to connect Propane, use a fitting with 3/8” NPT nipple on the valve side and 1/2” propane gas supply line with an input of 35,000 BTUs at a manifold pressure of 11.0” and minimum inlet supply for adjustment of 11.0” w.c. Gas connection should be made in accordance with current National Fuel Gas Code, ANSI Z223.1. Since some municipalities have additional local codes, be sure to consult you local authority. Connect the gas supply and test for leaks. Use a 50/50 solution of liquid soap and water to test for leaks at gas fittings and joints. NEVER test with an open flame. Light the pilot according to the directions on page 16, before going to the next step. CAUTION This appliance should only be connected by a qualified gas technician. Test to confirm manifold pressures as specified below. The Radiance Heater and its individual shutoff valve must be disconnected from the gas supply piping during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). The Radiance Heater must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig. There must be a gas shutoff between the stove and the supply. In order to connect Natural Gas, use a fitting with 1/2” NPT on the valve side and 1/2” natural gas supply line with an input of 35,000 BTUs at a manifold pressure of 3.5” between minimum inlet supply of 5.5” w.c. and maximum of 14.0” w.c. In order to connect Propane, use a fitting with 1/2” NPT on the valve side and 1/2” propane gas supply line with an input of 35,000 BTUs at a manifold pressure of 11.0” between a minimum inlet supply of 11.0” w.c. and maximum of 14.0” w.c. Install Log Set 1. Remove the logs from their packaging, and inspect each piece for damage. DO NOT INSTALL DAMAGED LOGS. 2. Install the rear left log by placing it on the sheet metal shelf at the back of the firebox. (Fig. 23) The log should touch the back wall of the firebox. Slide the log to the left until the left side lines up with the left bracket. (Fig. 23) When the log is in place the left front corner of the log should rest on the decorative grate. 3. Install the rear right log by placing it on the sheet metal shelf at the back toward the right. Make sure the right side of the log lines up with the right bracket. (Fig. 23) NOTE: When the right and left rear logs are in place,...
Dieses Handbuch ist für folgende Modelle:elektrische Heizungen - 3358 (979.32 kb)
elektrische Heizungen - 3370 (979.32 kb)
elektrische Heizungen - thru 3379 (979.32 kb)